§ 15.44.110 — Establishment of permit
Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 15.44.110
Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/a24af4d8-b05c-4f89-8017-08a40bb76f74
15.44.110 - Establishment of permit.
A. Prior to the issuance of a building permit within any area of a special hazard established in Section 15.44.060, a site plan shall be furnished by the applicant, and may include, but not be limited to, the nature, location, dimension and elevations of the area in question, existing and proposed grades, existing or proposed structures and drainage facilities. If the city engineer requires a proposed grading plan or drainage facilities, this site plan shall be prepared by a licensed professional engineer. Specifically the following information is required: 1. Elevation in relation to mean sea level, of the lowest floor (including basement) of all structures; 2. Elevation in relation to mean sea level to which any structure is to be floodproofed; 3. Certification by a registered professional engineer or architect that the floodproofing methods for any nonresidential structure meet the floodproofing criteria in Section 15.44.150.B.2; 4. Description of the extent to which any watercourse will be altered or relocated as a result of proposed development. B. Prior to the start of any development which does not require the issuance of a building permit, within any area of special flood hazard established in Section 15.44.060, a development permit shall be obtained. Application for a development permit shall be made to the city engineer and shall include, but not be limited to, the same information as required for a building permit in a flood hazard zone. C. Construction Stage. Upon completion of the applicable portion of construction, the applicant shall provide verification to the Bridgeport building official of the following as is applicable: 1. Lowest floor elevation—The elevation to be verified for: a. For structures in zone A and AE, provide the as-built elevation of the top of the lowest floor, including basement; b. For nonresidential structures in zone A and AE, provide the as-built elevation to which the floodproofing is effective; c. For structures in the VE zone, provide the as-built elevation of the bottom of the lowest horizontal structural member of the elevated building excluding pilings or columns. D. Deficiencies detected by the review of the site plan referred to in this section shall be corrected by the permit holder immediately and prior to further progressive work being permitted to proceed. Failure to submit the survey or failure to make said corrections required by this chapter shall be cause to issue a stop-work order for the project.
(Ord. dated 4/1/13)
Ask a question about Bridgeport law
Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.