§ 8.04.190 — Permits—Director's authority to stop work in violation of installation permit
Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 8.04.190
Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/2870edc7-9e2c-4716-aa09-df35658276aa
8.04.190 - Permits—Director's authority to stop work in violation of installation permit.
Violation of the installation permit required by this article shall be sufficient cause for the director to stop all work in connection with such permit, and he is authorized to seal the installation. No further work shall be done until the director is assured that the condition in question will be corrected and that the work will proceed in accordance with the installation permit.
(Prior code § 14-131)
Ask a question about Bridgeport law
Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.
