For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8.04.200 — Permits—Installation permit term

Bridgeport, Connecticut Municipal Code (Supp. No. 24, Update 2: codified through Ordinance dated July 6, 2026) · Bridgeport Municipal Code § 8.04.200

Corpus is an independent public-information project, not the official City of Bridgeport website. Stable reference: corpuslaw.us/code/1a98390c-e748-4cf8-9a90-0ab6c1b3d90a

8.04.200 - Permits—Installation permit term.

If construction, installation, reconstruction or alteration is not commenced within six months of the date of the installation permit required by this article, the permit shall become void and all fees shall be forfeited, unless an extension of time is warranted and granted by the director.

(Prior code § 14-132)

Ask a question about Bridgeport law

Corpus searches the Bridgeport sections it holds and shows the ones that match, with their citations. Free, no sign-in.