8.04.200 - Permits—Installation permit term.
If construction, installation, reconstruction or alteration is not commenced within six months of the date of the installation permit required by this article, the permit shall become void and all fees shall be forfeited, unless an extension of time is warranted and granted by the director.
(Prior code § 14-132)