For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-20 — Design, construction, repair and maintenance of sewers

Code of Ordinances of the City of Bristol, Connecticut (Codified through Amendments of February 11, 2025, effective February 28, 2025. (Supp. No. 4)) · Bristol Code of Ordinances § 22-20

Corpus is an independent public-information project, not the official City of Bristol website. Stable reference: corpuslaw.us/code/f4938787-278c-4f27-9ffc-953f202a6ad6

Sec. 22-20. - Design, construction, repair and maintenance of sewers.

(a) Authorization to work on sewers. No person other than those described hereinafter shall construct, repair, alter or remove any sewer, house connection or drain discharging, directly or indirectly, into any public sewer of the city or intended to discharge at some future time: (1) Forces of the sewer department and the state department of transportation operating under and subject to permit for the particular job to be issued by said superintendent. (2) Regular forces of a contractor employed by the City of Bristol operating under orders of the superintendent and in performance of work for said city. (3) Any drain layer holding a valid license and operating under and subject to the conditions of a permit or contract agreement for the particular job and issued therefore by the superintendent. (b) Authorized agreements with owners. The sewer department is authorized to enter into agreements on behalf of the city with property owners of land for the construction of sewers by and at the expense of such property owners, which sewers may become part of the public sewer system under the conditions hereinafter stipulated. The sewer department is empowered to make any necessary regulations stipulating the terms and conditions of said agreements within the provisions of this article. The superintendent is authorized to sign, on behalf of the sewer department, all such agreements when the same have been authorized by said sewer department. (c) Provisions of agreement: (1) Plans and specifications. The superintendent shall specify in the terms of such agreements, or on the plans which are made a part thereof, the limits, sizes and grades; and the nature and limitations on the wastes or liquids to be conveyed. (2) Costs. Such agreements shall provide that the full cost of construction of the sewer and all expense incidental thereto shall be borne by the property owner. Such incidental costs shall include the incurred costs of the city concerning the project, incurred prior to or during construction, or during any maintenance period. (3) Insurance. All such agreements shall provide that the property owner shall assume all risks and hold the city and sewer department harmless from any and all claims for damage arising from the work or its conduct. To secure such risks, adequate liability, property damage and compensation insurance in amounts fixed by the superintendent and approved by the corporation counsel shall be required of the property owner who shall furnish proper and acceptable certificates of insurance before starting work. (4) Bonding authority. The sewer department shall require as a part of such agreement that adequate bond guaranteed by surety acceptable to the engineer and corporation counsel in amount and form to be submitted to insure proper completion and maintenance of the work. (5) Rights-of-way. If required, adequate rights-of-way shall be conveyed to the city, prior to the start of construction, on standard city forms. The conveyance is subject to approval by the corporation counsel of the city. (6) Inspection. The work undertaken shall be under the direction and inspection of the superintendent or his designee, either continuously or at vital stages as determined by them. Any work performed without proper inspection may not be accepted and shall be uncovered, removed and rebuilt for proper inspection if required by the engineer. If at any time the work performed does not comply with the specifications and standards of the city and the orders of the engineer, the work will be stopped until all requirements are complied with. There shall be no backfill of any pipe until the sewer is inspected and approved. (d) Acceptance of constructed sewers. The superintendent or his designee shall certify to the sewer department that any sewer constructed under this agreement has been completed in accordance with the plans, specifications and standards of the sewer department, and all areas disturbed by the work have been properly restored. The sewer department shall recommend to the sewer commission acceptance of such sewer. (e) Standard design and construction requirements: (1) General. The sewer department shall establish standard requirements for sewer design and construction to regulate the sizes, materials, methods and workmanship to be used in the construction of sewers connected or intended to be connected or to discharge, directly or indirectly, into any public sewer of the city. Any such requirements or specifications as the same may from time to time be amended, are hereby made a part of this article. (2) Design requirements. The design requirements for sewers and wastewater treatment facilities of the Connecticut Department of Environmental Protection and Department of Health shall be a guide in the design of main sewers, pump stations, treatment facilities and related appurtenances. "Guides for the Design of Wastewater Treatment Works" published by the New England Interstate Water Pollution Control Commission, as amended, may also be used as a general design guide. (3) Construction requirements. Main sewers and related appurtenances to be installed by property owners in approved subdivisions for city acceptance must be built by an approved contractor under permit issued by and inspected by the engineer. Permits will be issued only after filing of proper bond, insurance, plans and specifications as noted herein. The approved contractor shall install the sewers and related appurtenances in accordance with the sewer department construction standards for sanitary sewers and approved plans and specifications. (f) Repair and maintenance of waste water facilities. All waste water facilities shall be repaired, replaced and maintained by the sewer department after acceptance by the city council. Building sewers and house connections, including the tee or wye branches, shall be maintained by the property owner as defined in section 22-19 of this article.

(Ord. of 12-10-84, Art. V, §§ 1—6; Ord. of 10-13-20)

Ask a question about Bristol law

Corpus searches the Bristol sections it holds and shows the ones that match, with their citations. Free, no sign-in.