For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 22-27 — Methods of apportionment of sewer benefits

Code of Ordinances of the City of Bristol, Connecticut (Codified through Amendments of February 11, 2025, effective February 28, 2025. (Supp. No. 4)) · Bristol Code of Ordinances § 22-27

Corpus is an independent public-information project, not the official City of Bristol website. Stable reference: corpuslaw.us/code/f739c34f-e650-4bf1-adce-be008130fbd5

Sec. 22-27. - Methods of apportionment of sewer benefits.

(a) General. In assessing benefits and apportioning the amount to be raised thereby among the properties benefited, the sewer commission shall give consideration to any factors it deems relevant. The sewer commission may make reasonable allowances in the case of properties which have a particular situation requiring an allowance. Revenue from the assessment of benefits shall be used solely for the acquisition of the particular wastewater facility providing such benefits are for the payment of principal of and interest on bonds or notes issued to finance such acquisition or construction. No assessment shall be made against any property in excess of the special benefit to accrue to such property in accord with the General Statutes. (b) General rules of assessment: (1) The sewer commission shall determine and adopt rates of assessment for the construction of each sewer project. Such rates shall be based on the total project cost or a portion thereof determined by said commission. (2) The total cost of the sewer construction shall include the cost of preliminary studies and surveys, detailed working plans and specifications, acquiring necessary land or property or any interest therein, damage awards, interest charges during construction, legal and other fees, outlet benefits or deferred assessments, or any other expense incidental to the completion of the work, in addition to the cost of construction. (3) The cost of sewer construction, or portion thereof, for an eight-inch diameter local sanitary sewer shall be assessed against benefiting property owners. (4) The cost of construction, engineering, rights-of-way and miscellaneous charges for pump stations, force mains, trunk sewers, relief sewers and major interceptors not containing house connection laterals and that portion of sanitary sewers greater than an eight-inch diameter local sewer shall not be directly assessed against property owners initially benefiting but shall be prorated to all ultimate users through the connection charge, at a standard rate; the balance of the cost to be borne by the city through general taxation or by owners as may be stipulated in the developer's agreement. (c) Determination of sewer assessment rates and connection charges. (1) General. The cost of the sewer system to be borne by the persons whose properties are benefited by such sewer system shall be divided into three (3) parts: one (1) part to be borne by the properties benefited in accordance with the assessment method, the second part to be borne by the city through general taxation, and the third part to be borne by the properties so benefited in accordance with the connection charge method. (2) Unit assessment method. For the purpose of applying the unit assessment method so called, properties presently so benefited shall be divided into units, and the assessable cost of local sewers shall then be divided by the total number of such units existing in the properties so benefited to determine the unit assessment rate. The unit for purposes of assessment shall be assigned as follows: a. In single-family residential zones, property improved for residential use shall be assigned one (1) unit for each residential dwelling unit thereon. b. In single-family residential zones, unimproved property abutting a street in which a sewer line has been laid shall be assigned one (1) unit for each existing building lot or for each lot of the minimum area and width permitted by the zoning regulations for the zone in which the property is located. c. In any zone, one (1) unit shall be assigned to each residential dwelling unit in a multifamily residential development which has either been approved as a special exception by the zoning authority or approved under zoning regulations governing such developments. d. In multifamily residential zones, unimproved property abutting a street in which a sewer line has been laid shall be assigned one (1) unit for each residential dwelling unit allowed by the zoning ordinance for each existing lot of record. e. In business, commercial and industrial zones, units shall be assigned pursuant to the applicable following method: 1. One unit for every one thousand five hundred (1,500) square feet of gross floor area of the buildings thereon, figured to the nearest one-forth unit. (Gross floor area shall be calculated on the basis of outside measurements of the building.) 2. On unimproved property abutting a street in which a sewer line is laid, future building use and coverage as allowed by the zoning ordinance shall be assumed. One (1) unit for every one thousand five hundred (1,500) square feet of gross building floor area allowed, figured to the nearest one-quarter unit. 3. One (1) unit for each use for dwelling by one (1) family and/or one (1) unit for each apartment in standard apartment buildings. The above shall be used also for unimproved property zoned for apartments, utilizing the zoning density formula. (3) Connection charge method. Connection charge shall be due and payable upon actual connection to the sewer line. The standard connection charge shall be based upon the following: residential fee per dwelling unit, or commercial and industrial fee per plumbing fixture. All persons connecting to the sanitary system must pay the connection fee including nonprofit organizations and public agencies. No permit for connection will be issued without payment of connection charge. The rates of the connection charge shall be as set by the sewer commission. (4) Assessment method for nonconforming lots. In any zone where nonconforming uses exist, the appropriate method of assessment for the actual use of the property shall be applied. (5) Allowance for adjustments in assessment. If in the opinion of the sewer authority, the size, shape or location of, or the improvements on or use of any properties subject to assessment do not reflect the extent of the benefit which number of units as computed and plotted for such property would otherwise indicate the property to be benefited, a factor or percentage of such units or any other reasonable adjustment thereof may be used for determining the benefits to such property which the sewer commission believes fairly measures the extent to which said property is specially benefited. (6) Maximum unit charge. The sewer commission may set a maximum unit charge for assessment of new sewer construction. When the cost to be assessed exceeds the average cost of total assessments (without cap) for the last four (4) completed sanitary sewer projects, the commission may set a cap on the unit assessment equal to such average unit assessment. The city shall assume the excess as a part of its share of the project cost. (d) Determination of special charges: (1) Deferred assessments. Wherever an assessment has been deferred and a connection to the sewer system is sought in accordance with the provisions of section 22-25, a special charge shall be imposed consisting of the unit assessment and standard connection charge which would have been levied had the property been immediately benefited at the time the sewer was built. (2) Sewers built by private owners. Wherever a private owner has installed a local sewer passing land owned by others in accordance with the provisions of section 22-26(a), a special charge shall be imposed, consisting of the connection charge applicable at the time the connection is sought and an additional charge determined by the sewer commission to be a normal and equitable share of the installation cost. Any such normal and equitable share of the installation cost shall be reimbursed to the private owner if provided for in a permit agreement, over a period not to exceed five (5) years after acceptance of the local sewer. (3) Assessment of properties not previously assessed. The special charge provided for under section 22-26(c) shall be determined by the sewer commission, and shall be based on the values used in assessing benefits against properties in the particular area applied to such real estate as is benefited at the time of connection to be based on current unit assessment rates and standard connection charges. (4) Supplemental charges for increased intensity of use. Wherever an assessment has been levied against a property and an increased intensity of use has taken or will take place, after the initial assessment has been levied, a supplemental sewer connection charge may be imposed as if increased intensity had existed at the time of the initial assessment. Such supplemental sewer connection charge shall be based on the current unit assessment and, if applicable, a standard connection charge. Whenever increases in the intensity of use has a substantial effect on the sewer system and may require the construction of relief sewers or other expansion of the system to accommodate such uses; and wherever it is advisable to levy additional sewer charges under the provisions of the State of Connecticut General Statutes; the sewer commission shall determine the amount of the additional charge to be levied in accordance with the increased intensity of use and in accordance with its established formula for levying such charges. No building permit shall be granted for said construction until the special charge so levied by the sewer commission has been paid or until an agreement providing for the payment of said charge over a period of time has been executed.

(Ord. of 12-10-84, Art. XII, §§ 1—4; Ord. of 10-13-20)

Ask a question about Bristol law

Corpus searches the Bristol sections it holds and shows the ones that match, with their citations. Free, no sign-in.