For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 6-11 — Rapid entry systems required

Code of Ordinances of the City of New London, Connecticut (Codified through November 4, 2024. (Supp. No. 26)) · New London Code of Ordinances § 6-11

Corpus is an independent public-information project, not the official City of New London website. Stable reference: corpuslaw.us/code/bf908015-5df4-4de3-bad1-9f6cb2cc92eb

Sec. 6-11. - Rapid entry systems required.

A rapid entry system shall be installed on all structures and complexes that meet the requirements of this section. The rapid entry system shall be suitable for the structure or complex for which it is used and meet the requirements of the city fire department regarding size and integrity. The rapid entry system shall be installed on all new buildings or complexes for which a building permit is issued after the date of the ordinance from which this section derives and on all existing structures or complexes that are equipped with a fire alarm system or a fire suppression system weather or not any such systems are required by the Connecticut Fire Safety Code or the Connecticut Building Code. Exception: If approved by the fire chief or fire marshal the structure or complex may be exempted from these requirements for reasons of practical difficulty or an alternate means of entry is provided. (1) Alterations exceeding fifty (50) per cent: If alterations or repairs are made within any period of twelve (12) months, costing in excess of fifty (50) per cent of the physical value of the structure, this section shall apply. (2) Damages exceeding fifty (50) per cent: If the structure is damaged by fire or any other cause to an extent in excess of fifty (50) per cent of the physical value of the structure before the damage was incurred, this section shall apply if it is rebuilt. (3) Increase in size: If the structure is increased in floor area or number of stories, the entire structure shall be made to conform with the requirements of this section. (4) Physical value: In applying the provisions of this section, the physical value of the structure shall be determined by the building official and be based on current replacement costs.

(Ord. of 6-15-87, § 1; Res. No. 04212008)

Ask a question about New London law

Corpus searches the New London sections it holds and shows the ones that match, with their citations. Free, no sign-in.