Sec. 6-6.4. - Issuance of demolition permit.

(a) No person shall be eligible to receive a demolition permit unless the building official has been furnished with: (1) A certificate from a licensed exterminator which certifies the premises to be demolished are free from rodent and insect infestation; and (2) Written evidence of the contractor's certificate of insurance and liability coverage required by C.G.S. 29-406(a); and (3) A copy of the current valid certificate of registration issued under the provisions of Connecticut General Statutes 29-402; and (4) If applicable, a copy of the certificate of asbestos inspection. (5) A certificate of notice from each of the following utilities stating that the utility connections and service has been severed, removed, sealed and/or plugged in a safe manner: a) Connecticut Light and Power, b) Yankee Gas, c) Local telephone service provider, d) City Sewer, e) City Water, f) City public works department storm water drainage, g) Local cable provider. (b) No person shall remove or demolish any building or structure or part thereof without providing adequate safety measures for all workmen and suitable protections for the public in compliance with C.G.S. 29-408 through 29-413. To this end, the building official may impose such terms and conditions as he may determine reasonable and proper to insure the safety to the public safety and welfare. (c) Any site where a building has been demolished or removed shall be cleaned of all debris, building materials, concrete and other items as determined by the building official or his representative upon inspection so as to insure that the lot remains free from all unsafe or hazardous conditions. The site shall be graded and if necessary fill shall be brought in to provide for natural drainage from the site. In no case shall grade next to sidewalks or on the site present a hazard to the public or anyone who may be on the site. (d) The building official is authorized to deny any demolition permit application if an applicant fails to submit any of the required information during the application review period.

(Ord. No. 09-15-03-1, § 1; Ord. No. 09-15-03-1(Rev.))