§ 7.2 — Zoning Permit Application. (STAFF REVIEW)

Code of Ordinances of the City of Norwich, Connecticut (Codified through Ordinance No. 1871, enacted April 21, 2025. (Supp. No. 26)) · Norwich Code of Ordinances § 7.2

Corpus is an independent public-information project, not the official City of Norwich website. Stable reference: corpuslaw.us/code/fcab0e6b-953a-4814-8454-bfd58dc8e059

7.2 - Zoning Permit Application. (STAFF REVIEW)

Applicability. No building or structure shall be erected, added to or structurally altered until a zoning permit has been issued by the zoning enforcement officer. All applications for such zoning permits shall be in accordance with the requirements of these regulations. The building inspector shall not issue a building permit until such time as a zoning permit has been issued. 7.2.1 Application Required. .1 An application for a Zoning Permit shall be made to the Zoning Enforcement Officer (ZEO) on a form provided for that purpose before: .2 The erection or alteration of any structure is commenced in any district; or .3 The commencement of any other activity that requires a Zoning Permit or other permit required by these Regulations. 7.2.2 Application Requirements. .1 A completed Zoning Permit application form; .2 The appropriate fee; .3 A Class A-2 boundary survey prepared, stamped with an embossed seal, and signed by a Connecticut-licensed land surveyor showing the information required in the Appendix of these Regulations; .4 Building plans (dimensioned floor plans and elevations); .5 Driveway plan; .6 Grading plan; .7 A Soil Erosion and Sediment Control Plan in accordance with Section 5.4. Such additional information as may be necessary to determine compliance with the provisions of these Regulations; .8 Other drawings and documentation showing the information required in the Appendix of these Regulations; and .9 The Zoning Enforcement Officer may reduce the application requirements provided there is sufficient documentation to determine compliance with the Regulations. 7.2.3 Proceedings. .1 If the submitted application materials document to the satisfaction of the Zoning Enforcement Officer that the proposed activity or use is in compliance with these Regulations, the ZEO shall issue a Zoning Permit setting forth the date on which the permit was issued. .2 Other Permits. Approval of an Application for a Zoning Permit or Certificate of Zoning Compliance or the issuance of a Certificate shall not be construed to constitute compliance with any other regulation, ordinance or law nor to relieve the applicant from responsibility to obtain any permit thereunder. .3 If all of the requirements of these Regulations are met, the Zoning Permit shall be issued within 30 days of the receipt of the completed application. Otherwise the permit shall be denied for stated reasons. .4 An application for a Zoning Permit may be withdrawn, in writing, by the applicant at any time prior to final action. 7.2.4 Conditions. Any maps, plans, documents, statements, and stipulations submitted to and approved by the Commission or Zoning Board of Appeals in connection with a site plan, Special Permit, variance or other action of such Commission or Board, shall be conditions for approval of an Application for a Zoning Permit. 7.2.5 Notice Provisions. In accordance with CGS § 8-3(f), the applicant may publish notice of the Zoning Permit in order to establish the appeal period under CGS § 8-7. Any such notice published by the applicant shall contain: .1 A description of the building, use or structure and its location. If the property does not have a street address assigned, the applicant shall provide additional information to inform residents about the location of the property for which the signoff applies. .2 The identity of the applicant. 7.2.6 Foundation Survey Recommended. The property owner shall notify the Zoning Enforcement Officer of the completion of the foundation of any new structure or addition thereto within seven days after such completion. It is recommended that a Class A-2 boundary survey prepared by a Connecticut-licensed land surveyor be filed with the Zoning Enforcement Officer (ZEO) showing the foundation location of the new building, structure, or addition. Such filing would be beneficial to the landowner in helping to assure that any errors in location are found at an early time in the construction process. 7.2.7 Zoning Permit Expiration. .1 Any Zoning Permit issued by the ZEO under the provisions of these Regulations shall become invalid if the authorized work is not commenced within five (5) years after issuance of the Zoning Permit, or if the authorized work is suspended or abandoned for a period of five (5) years after the time of commencing the work. .2 A permit may be renewed once for an additional five (5) years upon filing a written request to do so. 7.2.8 Inspections. The Zoning Enforcement Officer is authorized to inspect or cause to be inspected any land, building or other structure to determine compliance with these Regulations. No Zoning Permit or Certificate of Zoning Compliance shall be issued until the Zoning Enforcement Officer has inspected the land, building or other structure involved to determine that the use and/or the buildings or other structures conform to these Regulations. 7.2.9 Orders. The Zoning Enforcement Officer is authorized to issue a Cease and Desist Order if in his judgment the excavation of land, use of land, buildings and other structures or the construction, reconstruction, enlargement, extension, moving or structural alteration of a building or other structure are not being carried out in compliance with these Regulations; he shall withdraw such Order when he determines that there is compliance with these Regulations. The Zoning Enforcement Officer is authorized to order in writing the remedying of any condition found to be in violation of these Regulations. 7.2.10 Records. The Zoning Enforcement Officer shall keep records of all fees, all Applications and Certificates of Zoning Compliance, all identifiable complaints of any violation of these Regulations, all inspections made under these Regulations and all notices of violation served by him and the action taken thereon.

Ask a question about Norwich law

Corpus searches the Norwich sections it holds and shows the ones that match, with their citations. Free, no sign-in.