§ 7.3 — Certificates of zoning compliance. (STAFF REVIEW)
Code of Ordinances of the City of Norwich, Connecticut (Codified through Ordinance No. 1871, enacted April 21, 2025. (Supp. No. 26)) · Norwich Code of Ordinances § 7.3
Corpus is an independent public-information project, not the official City of Norwich website. Stable reference: corpuslaw.us/code/e0bb019a-ab97-4de7-acbd-1e8058080dc6
7.3 - Certificates of zoning compliance. (STAFF REVIEW)
7.3.1 Applicability. .1 No structure, land or premises shall be occupied for use or converted to a new use until a certificate of zoning compliance has been issued by the Zoning Enforcement Officer or his designee. .2 The Zoning Enforcement Officer shall determine that any use, building, structure or alteration for which a Zoning Permit has been issued conforms in all respects to the zoning Regulations. 7.3.2 Procedures. .1 Upon completion of any building, structure or addition for which a Zoning Permit has been issued the applicant shall submit the following information to the ZEO before a Certificate of Zoning Compliance may be issued; .2 A Class A-2 boundary survey prepared, stamped with an embossed seal, and signed by a Connecticut-licensed land surveyor showing the information required in the Appendix of these Regulations; and .3 A certification by a Connecticut-licensed land surveyor as to the location of the completed building, structure or addition, the lot coverage, and building height, where applicable: .4 As an alternative to full project completion, the applicant may seek the approval of the Commission to post a bond for completion of any required public infrastructure, sedimentation and erosion controls, and other items for which a bond may lawfully be required. The bond amount and form shall be determined by the Commission after consultation with the City Engineer and City Attorney and shall be based on a breakdown of remaining project elements provided by the applicant. The bond amount shall include costs incurred for administration should the bond need to be called upon: .5 The Zoning Enforcement Officer, or his designee, shall determine whether the project conforms to the Zoning Regulations; .6 In the event that any Zoning Permit or Certificate of Zoning Compliance is issued based on incorrect information or the specific conditions of approval are not adhered to strictly, such certificate may, after a hearing, be deemed null and void by the Commission; .7 A certificate of zoning compliance shall remain in effect as long as the specified uses and conditional requirements are properly maintained, but if such conditions and uses are no longer maintained, the Commission may, after a hearing, deem the certificate null and void. 7.3.3 Notice Provisions. In accordance with CGS § 8-3(f), the applicant may publish notice of the Zoning Permit in order to establish the appeal period under CGS § 8-7. Any such notice published by the applicant shall contain: .1 A description of the building, use or structure and its location. If the property does not have a street address assigned, the applicant shall provide additional information to inform residents about the location of the property for which the signoff applies. .2 The identity of the applicant.
Ask a question about Norwich law
Corpus searches the Norwich sections it holds and shows the ones that match, with their citations. Free, no sign-in.
