For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 50-22 — Permits required

Code of Ordinances of the City of Dover, Delaware (Codified through Ordinance No. 2026-03, adopted April 27, 2026. (Supp. No. 44)) · Dover Municipal Code § 50-22

Corpus is an independent public-information project, not the official City of Dover website. Stable reference: corpuslaw.us/code/92a01275-2eb8-4233-865b-5e8ab918e434

Sec. 50-22. - Permits required.

It shall be unlawful for any person or entity to begin construction or other development which is wholly within, partially within, or in contact with any identified special flood hazard area, as established in section 50-4, including but not limited to: subdivision of land, filling, grading, or other site improvements and utility installations; placement or replacement of a manufactured home; recreational vehicles; installation or replacement of storage tanks; or alteration of any watercourse, until a permit is obtained from the City of Dover. These regulations are intended to be administered and enforced in conjunction with the building code. No permit shall be issued until the requirements of these regulations and, as applicable, the flood load and flood-resistant construction provisions of the building code, have been met. Permit fees shall be as provided for in Appendix F—Fees and Fines.

(Ord. No. 2014-09, 6-9-2014)

Ask a question about Dover law

Corpus searches the Dover sections it holds and shows the ones that match, with their citations. Free, no sign-in.