For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 12 — CUSTOMER'S USE OF SERVICE

City Code of the City of Milford, Delaware (Supplement 29 Update 1 (2025-01-27)) · Milford City Code, App. B, § 12

Corpus is an independent public-information project, not the official City of Milford website. Stable reference: corpuslaw.us/code/736779e4-22ed-4cec-b32b-3e6bb5fb2c25

SECTION 12 - CUSTOMER'S USE OF SERVICE

12.1 RESALE FORBIDDEN The Customer shall not directly or indirectly sell, sublet, assign, or otherwise dispose of the electric energy or any part therefore except as authorized by Chapter 51, Title 25 of the Delaware Code. 12.2 FLUCTUATIONS Electric Service must not be used by the Customer in such a manner as to cause unusual fluctuations or disturbances in the City's supply system. Should such fluctuation or disturbance be caused by the Customer, the City may discontinue Service or require the Customer to modify his installation or install approved controlling devices (See also Section 7.9). Where Service is rendered under Service Classifications "SGS", "MGS", "LGS", "GSP" or "SCS" and the use of current is intermittent or subject to large fluctuations, the City reserves the right to base the measured demand upon a five (5) minute period, or to add to the measured demand, as determined under the measured demand provision of the applicable Service Classification, an amount equal to sixty-five percent (65%) of the rated capacity in kilowatts of apparatus having fluctuating or intermittent current requirements. 12.3 UNBALANCED LOADS Where Service is rendered under Service Classifications "SGS", "MGS", "LGS", "GSP" or "SCS", the Customer shall at all times take and use energy in such manner that the load will be balanced equally between phases. Should this not be possible, and the imbalance exceeds ten percent (10%) of the lesser phase, the City reserves the right to compute the demand for billing purposes on the assumption that the load on each phase is equal to that on the greatest phase. If the imbalance exceeds forty percent (40%) of the lesser phase, the City reserves the right to terminate Service. 12.4 TRANSIENT VOLTAGES Customers are cautioned that certain types of data processing equipment are sensitive to transient voltages which typically occur in commercial power systems in routine operation. The City shall not be liable for transient voltage-related damage or loss. The Customer should purchase and install surge suppressors to protect sensitive equipment from transients, spikes, or surges. 12.5 SUPERIMPOSING ELECTRIC SIGNALS ON THE CITY'S ELECTRIC SYSTEM When the Customer couples to or superimposes any signal on his electric system for equipment control, load management control, carrier current transmission, signal systems, communication broadcasting or any other purpose, the Customer shall be responsible for preventing any such signals from being imposed upon or entering the City's metering and electric system. The Customer shall notify and obtain the consent of the City before utilizing their equipment. 12.6 POWER FACTOR The average Power Factor at the point where the electric service is metered should not be less than ninety-five percent (95.0%) lagging. In any month in which the average lagging Power Factor is less than 95.0%, the measured demand shall be corrected by the ratio of the 95.0% Power Factor to the actual Power Factor as follows: Billing Demand = Measured Demand x (95.0) /Customer's Actual Monthly Power Factor) In case the actual Power Factor exceeds 95.0%, no correction to the Billing Demand will be made. Where lighting, welding, motors or other electrical equipment or devices having lagging or leading Power Factor characteristics are installed, in order to avoid additional charges, the Customer may furnish, install, and maintain at his own expense, corrective apparatus which will increase the average Power Factor of the individual units or the entire installation to not less than 95.0% lagging or more than 110% leading. The City reserves the right to require removal or modification of Customer installed equipment which the City, at its sole discretion determines, is detrimental to the proper operation of the City's electric distribution system. 12.7 USE OTHER THAN STATED IN CONTRACT The City's Service shall not be used for any purpose or in any place other than that stipulated in the Customer's contract for Service except by written consent of the City. 12.8 CHARACTERISTICS OF SERVICE The Service specified and furnished by the City consists of sixty (60) hertz, single-phase, or three-phase alternating current at one standard primary or secondary voltage. The type of Service (number of phases and voltage) available varies with location and load. An Applicant must contact the City to ascertain the type of Service the City will supply before making plans for receiving Service or making alterations to existing Service. Secondary Service - Single phase or three phase circuits carrying a nominal voltage of 480 volts or less between any two conductors. Primary Service - Single phase or three phase circuit carrying a nominal voltage of 14,400 volts to 24,900 volts between any two conductors. This Service is available to customers, with the City's approval, who have anticipated loads in excess of 750 Kw. 12.9 CHANGE OF INSTALLATION AND SERVICE OVERLOAD The Customer shall give immediate written notice to the City of any proposed substantial increase or decrease in or change of purpose or location of his installation. The Service connection, transformers, meters, and equipment supplied by the City for each Customer have a definite capacity and no additions to the equipment or load connected thereto will be permitted except by written consent of the City. Failure to give notice of additions or changes in load or location shall render the Customer liable for any damage to the meters or their auxiliary apparatus or the transformers or wires of the City caused by the additional or changed installations. 12.10 LIMITATION OF USE No other source of Service shall be introduced or permitted, directly or indirectly, for the Customer's use without written notice to the City and written consent of the City, which shall not be unreasonably withheld. An installation for which permission has been granted must be made so that the supply of power from the Customer's generator or other sources cannot feed into the City's system, unless agreed to by a written contract between the City and the Customer.

Ask a question about Milford law

Corpus searches the Milford sections it holds and shows the ones that match, with their citations. Free, no sign-in.