For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 7 — CUSTOMER'S INSTALLATION

City Code of the City of Milford, Delaware (Supplement 29 Update 1 (2025-01-27)) · Milford City Code, App. B, § 7

Corpus is an independent public-information project, not the official City of Milford website. Stable reference: corpuslaw.us/code/a4b8ec12-5cac-4f1b-a69c-4d5c46a2e67f

SECTION 7 - CUSTOMER'S INSTALLATION

7.1 CUSTOMER'S WIRING All the Customer's wiring and appurtenances shall be furnished, installed and maintained by the Customer. The City shall not be liable for loss or damage resulting from the Customer's wiring or equipment. The City may delay the construction of an extension and/or Service until the Applicant (or Applicants) has completed the wiring and installation of equipment necessary to receive and use Service. The Customer's facilities at the Point of Delivery and the Service entrance shall be in accordance with the National Electrical Code (NEC), the National Electrical Safety Code (NESC), and the City's standards for such facilities. 7.2 DESCRIPTION OF INSTALLATION The Customer shall present, in writing, complete specifications of equipment, connected electric loads, location plans, electric vaults, cable runs, substations and other data required, so that the City may advise the character of the Service it will furnish, the point at which it will be connected and metered, and any other requirements associated with the special conditions of the Service. 7.3 ELECTRICAL INSPECTION All new wiring and equipment, or changes in wiring and equipment, shall conform to the standards of the National Electrical Code and of local codes in force at the time. In no event shall the City be under any obligation to inspect the wiring or appliances of the Applicant. The City may refuse to supply Service to the Applicant if the City believes the wiring or appliances do not comply with the applicable codes and recognized requirements. On receipt of a Temporary Cut-in Card issued by a qualified electrical inspection agency and/or a Waiver, at the sole discretion of the City, signed by the property Owner and the Electrician that holds the City harmless, the City may render Service to the Customer on a temporary basis for a period of not more than 10 working days. If a Final Cut-in Card issued by a qualified electrical inspection agency is not received within this 10-day period, the City shall disconnect Service until such is received. The City will further render permanent Service only after receipt of an executed Final Cut-in Card stating notice of approval issued by the duly recognized inspection agency. This card must be submitted to the City by the Customer's electrician. After the final Cut-in card has been received, the associated temporary account will be closed. 7.4 REVERSE PHASE RELAY The Customer shall install, at his expense, a Reverse Phase relay of approved type on all motors and other equipment where a definite direction of rotation must be maintained. The Customer shall be responsible for all damages caused to the system due to its failure to install a proper Reverse Phase Relay. 7.5 PHASE PROTECTION The Customer shall install, at his expense, suitable voltage or current type devices which will protect his equipment from damage in event of phase outages. The City shall not be responsible for any damage caused to the Customer due to the Customer's failure to install a Phase Protection system. 7.6 MOTORS The City shall always be consulted regarding the requirements as to the size of motor and starting current limitations as well as voltage and phase of service, which will be furnished. The City reserves the right to refuse Service to any size motor where the starting currents are deemed to be excessive at City's sole discretion. Starting currents must be limited by the Customer to acceptable levels. 7.6.A MOTORS, GENERAL It is characteristic of most electric motors, large welding machines and arc furnaces to draw large momentary starting current. This may result in objectionable variations in the voltage supply of other Customers who receive their Service from the same circuits or transformers. In the interest of all of City's Customers, it is therefore necessary for the City to limit the value of starting current which may be drawn by various classes of motors connected to City's lines. Some latitude in the permissible starting current of motors may be permitted under certain conditions at City's sole discretion, such as when motors are started very infrequently (once or twice a day), when motors are supplied from large capacity circuits and transformers, when motors are necessarily supplied from individual transformers on the Customer's premises, etc. Limitations will be site specific. The City must always be consulted in advance regarding motor installation above 5 horsepower single phase or above 10-horsepower three phase to ensure the proposed installation is acceptable to City. 7.6.B MOTORS RESIDENTIAL Single phase, 120-volt motors will be permitted providing the maximum starting current does not exceed 100 amperes. (Typically, 2 HP or 12,000 BTU/hr. air conditioner.) Single phase, 240 volt or 208-volt motors will be permitted, however, when the maximum starting current exceeds 150 amperes, the City shall be contacted for approval before purchasing equipment. A/C and heating equipment exceeding 100 amperes shall be a split-unit type with two or more compressor motors, interlocked so that no more than one motor can start at any one time. Three-phase, 208-volt service normally will not be supplied for residential service. 7.6.C MOTORS COMMERCIAL When commercial installations are located in areas, which are primarily residential, or rural, they normally will be treated as covered by the above Section on "Motors Residential". The City may refuse single-phase service to motors rated 5 horsepower or more and to poly phase motors rated less than 5 horsepower or to Customers with a total three phase connected motor load less than 6 horsepower. 7.6.D MOTORS INDUSTRIAL Due to the wide variety of equipment and methods of service, general rules for starting motors cannot be specifically outlined. Additions to existing installations can be made which will not increase the maximum starting current of the installation. In all other cases, the City must be consulted as to the maximum allowable starting currents. 7.6.E MOTOR PROTECTIVE DEVICES All motors should be provided with devices that will protect the motor and circuit against overload or short circuit in any wire. Refer to the NEC for motor protection details. Motor equipped with reduced voltage starters that cannot be safely subjected to full voltage at starting should be provided with a device to insure that on the failure of the supply voltage, the motor will be disconnected from the line or the starter returned to the "off" position, unless the motor is equipped with automatic restarting means. To prevent unnecessary shutdowns, it is recommended that this starter be equipped with a time delay feature to prevent the starter from dropping out and to permit the motor to continue to operate during a momentary voltage change. The direction of phase rotation and the continuity of all three phases of the alternating current supply are carefully maintained, however, the City cannot guarantee against accidental or temporary change of failure thereof. Therefore, motors or other apparatus requiring unchanged phase rotation or continuity of three-phase supply should be equipped, by the Customer, with suitable three-phase protection against the reversal or phase failure. 7.6.F WELDERS In every case the Customer or Contractor shall consult with the City concerning the electrical supply to electric welders before any commitments for their purchase or installation are made. 7.6.G GENERATORS No Customer shall install any generation equipment without a written approval from a City's authorized representative. The City must always be consulted concerning the installation of any electric generating equipment. In all cases of emergency standby generation (Non-Cogeneration) a single operated break before make type double throw switch shall be installed between the generator and the Cities supply, to prevent the generator from being connected to the City system at any time. Closed transition switching may be permitted after a Customer and equipment specific evaluation is made by the City. Portable generators may only be used with service conductors physically disconnected from the utility system. 7.7 RIGHT TO INSPECT The City reserves the right, but is not obliged, to inspect any installation either before electricity is introduced or later if it believes there may be unsafe or hazardous conditions. The City also reserves the right to reject any wiring or appliances not in accordance with the City's standard requirements. Even when the City performs an inspection or otherwise, the City shall not be liable for any loss or damages resulting from defects in the installations, appliances, or wiring which may occur on the Customer's premises. 7.8 PROTECTION FOR COMPUTERS AND ELECTRONIC EQUIPMENT The Customer shall install, own, and maintain suitable surge, outage, and harmonic protection equipment to protect computers and other sensitive electronic devices. When the Customer has important, sensitive electronic data, the Customer shall be responsible for installing uninterruptible power supply (UPS) equipment to protect the data. The City shall in no way be liable for any damage to the Customer's electronic equipment, computer hardware or software, loss of data associated with the computer hardware and associated equipment, or any other consequential damage due to voltage spikes, surges, or loss of Service. 7.9 POWER QUALITY When an electrical disturbance affects either the City's distribution system or Service to another Customer and the disturbance is found to be due to a specific Customer's installation (such as resulting from load imbalance, the operation of motors, variable speed motor drives, power generator, or other electrical equipment), the Customer causing the disturbance shall discontinue operation of the suspect equipment until suitable corrective wiring or equipment has been implemented on the Customer's premises to eliminate the disturbance. Such corrective action to eliminate the cause of the disturbance shall be made at the Customer's expense. The City shall have the right to inspect and test the Customer's electrical equipment to determine if it has any electrical characteristics which may cause undue disturbance to the City's system or affect the Service to other Customers. The following are the City's guidelines for disturbance types: 7.9.A WAVE FORM DISTORTION The maximum total wave form distortion caused by the Customer's equipment, including a maximum of 1% phase voltage imbalance, shall be limited to 5% measured at the Point of Delivery. 7.9.B HARMONIC DISTORTION The total Harmonic Distortion shall not exceed 5% with any single harmonic distortion not exceeding 3% measured at the Customer-City interface. 7.9.C COMMUTATION NOTCHES Distortion caused by the commutation of solid-state devices between conducting and non-conducting conditions in the form of notches on the voltage waveform shall be limited to less than a 3,400% volts-microseconds area under the notch. 7.9.D STAGGERED STARTUPS During start-up operations, Customer's machinery and equipment shall be started on a serial or staggered schedule with no more than 500 HP per step to minimize the impact of such startups on the City's electric system. Such schedule shall be provided to, and approved by the City in advance, and any necessary modifications to the schedule shall be communicated to the City immediately. Between each step, the customer shall provide a time interval of a minimum of fifteen (15.0) minutes, preferably one hour. This time interval helps to reduce the power cost to the Customer and the City. 7.10 DAMAGE TO CITY'S SYSTEM The Customer should ensure that its installation of any facility listed in this Section does not interfere with the City's operations or cause damage to any of the City's facilities. In the event the Customer's installation causes damage to the City's operations or facilities, the Customer shall be responsible for all the costs associated with such damage.

Ask a question about Milford law

Corpus searches the Milford sections it holds and shows the ones that match, with their citations. Free, no sign-in.