§ 19-107 — Construction documents
Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 19-107
Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/e7991267-ebe7-460b-87a1-4fe4ade6c34b
Sec. 19-107. - Construction documents.
(1) Generally. Construction documents shall be dimensioned and drawn upon suitable material. Electronic media documents shall be submitted when approved by the building official. Construction documents shall be of sufficient clarity to indicate the location, nature and extent of the work proposed and show in detail that such work will conform to the provisions of this building code and relevant laws, ordinances, rules and regulations, as determined by the building official. Such drawings and specifications shall contain information, in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with the building code. Such information shall be specific, and the building code shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used as a substitute for specific information. All information, drawings, specifications and accompanying data shall bear the name and signature of the person responsible for the design. (2) Fire protection systems. Shop drawings for the fire protection system(s) shall be submitted to indicate conformance with this building code and the construction documents and shall be approved prior to the start of system installation. Shop drawings shall contain all information as required by the referenced installation standards in Chapter 9, Florida Building Code. (3) Roof assemblies. For roof assemblies required by the building code, the construction documents shall illustrate, describe and delineate the type of roofing system, materials, fastening requirements, flashing requirements and wind resistance rating that are required to be installed. Product evaluation and installation shall indicate compliance with the wind criteria required for the specific site or a statement by an architect or engineer for the specific site shall be submitted with the construction documents to show compliance with wind criteria. (4) Drainage plans. All permit applications for new buildings and for all modifications, alterations or additions to any such buildings which alter the existing drainage flow shall be accompanied by a final grading plan in accordance with the requirements of section 23-141. (5) Additional data. The building official may require details, computations, stress diagrams, and other data necessary to describe the construction or installation and the basis of calculations. All drawings, specifications and accompanying data required by the building official to be prepared by an architect, interior designer, landscape architect, or engineer shall be affixed with such architect's, interior designer's, landscape architect's, or engineer's official seal, signature and date as state law requires. (6) Means of egress. The construction documents shall show in sufficient detail the location, construction, size and character of all portions of the means of egress in compliance with the provisions of the building code. In other than occupancies in groups R-2, R-3, and I-1, the construction documents shall designate the number of occupants to be accommodated on every floor, and in all rooms and spaces. (7) Exterior wall envelope. Construction documents for all buildings shall describe the exterior wall envelope in sufficient detail to determine compliance with this building code. The construction documents shall provide details of the exterior wall envelope as required, including flashing, intersections with dissimilar materials, corners, end details, control joints, intersections at roof, eaves or parapets, means of drainage, water-resistive membrane and details around openings. The construction documents shall include manufacturer's installation instructions providing supporting documentation that the proposed penetration and opening details described in the construction documents maintain the weather resistance of the exterior wall envelope. The supporting documentation shall fully describe the exterior wall system which was tested, where applicable, as well as the test procedure used. (8) Site plan. The construction documents submitted with the application for permit shall be accompanied by a site plan showing to scale the size and location of new construction and existing structures on the site, distances from lot lines, the established street grades and the proposed finished grades and, as applicable, flood hazard areas, floodways, and design flood elevations. For new construction or alterations, modifications, or additions to existing buildings and structures in all flood zone areas (including former Palm Beach County annexed areas), the site plan shall provide: (i) the flood zone, base flood elevation (FEMA's flood elevation as shown on the current effective flood insurance rate map (FIRM) (or digital flood insurance rate map (DIRM)) plus any additional feet as described in the following "Flood Elevation Requirements Chart"), (ii) the design flood elevation (as defined in chapter 21 of the City's Code), (iii) the minimum finished floor elevation permitted by the South Florida Water Management District (SFWMD) pursuant to a SFWMD permit (if applicable), and (iv) the minimum of 1.5 feet (18 inches) above the crown of the street or road abutting the building or structure. The site plan shall show that the construction of the lowest floor of the new construction or alterations, modifications, or additions to existing buildings and structures in the flood zone area, meets the higher elevation of the above listed items as shown in the "Flood Elevation Requirements Chart" set forth in section 19-113. Such site plan shall be drawn in accordance with an accurate boundary line survey. In the case of demolition, the site plan shall show construction to be demolished and the location and size of existing structures and construction that are to remain on the site or plot. The building official shall be authorized to waive or modify the requirement for a site plan when the application for permit is for alteration or repair or when otherwise warranted. (9) Increases of floor area or building height for new construction and additions. For new buildings and additions, modifications and alterations to existing buildings that increase the floor area square footage or building height, each set of drawings shall consist of a site plan, plot plan, vacant lot survey prepared by a state-registered land surveyor or engineer, off-street parking plan, on-site drainage plan prepared by a state-registered engineer or architect, landscaping plan and such other drawings, specifications and supporting data as may be required by the building official. (10) Survey data. Each application for permit for new buildings or structures, and for additions to existing buildings or structures, shall be accompanied by 1 copy of a certified scaled drawing prepared by a state-registered land surveyor on which shall be clearly indicated the property corner stakes, property line dimensions, the location of existing and proposed buildings or structures, critical elevations, yard and building setback requirements, existing rights-of-way, sidewalks, easements and other pertinent survey data, as may be required by the building official. The building official may waive the requirements for such survey data when previous survey data is available, no changes have been made since the survey was last completed or the work is minor and complies with building code and zoning requirements.
(Ord. No. 5455, § 2, 5-22-18)
Ask a question about Boca Raton law
Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
