§ 19-95 — Permit issued on basis of an affidavit
Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 19-95
Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/e9285be9-d7b9-42d0-a1b6-fc35e90cf856
Sec. 19-95. - Permit issued on basis of an affidavit.
(1) The building official may accept a sworn affidavit from a registered architect or engineer stating that the plans submitted conform to the building code. For buildings and structures, the affidavit shall state that the plans conform to the laws as to egress, type of construction and general arrangement and, if accompanied by drawings, show the structural design and that the plans and design conform to the requirements of the building code as to strength, stresses, strains, loads and stability. Whenever a permit is issued in reliance upon an affidavit or whenever the work to be covered by a permit involves installation under conditions which, in the opinion of the building official, are hazardous or complex, the building official shall require that the architect or engineer who signed the affidavit or prepared the drawings or computations shall inspect such work. The building official may without any examination or inspection accept such affidavit, provided the architect or engineer who made such affidavit agrees to submit to the building official copies of inspection reports as inspections are performed. In addition, the architect or engineer shall certify conformity to the permit, and upon completion of the structure, electrical, gas, mechanical or plumbing system, make and file with the building official a written affidavit that the work has been completed in conformity with the reviewed plans and that the structure, electrical, gas, mechanical or plumbing system has been erected in accordance with the requirements of the building code. Where the building official relies upon such affidavit, the architect or engineer shall assume full responsibility for compliance with all provisions of the building code and other pertinent laws or ordinances. In the event such architect or engineer is not available, the owner shall employ in his stead a competent person or agency whose qualifications are reviewed and accepted by the building official. The building official shall verify by documentation that any person conducting plans review is qualified as a plans examiner under F.S. ch. 468, pt. XII, and that any person conducting inspections is qualified as a building inspector under F.S. ch. 468, pt. III. Nothing herein shall preclude plan review or inspections by the building official. (2) The provisions of this section allowing a permit to be issued on the basis of an affidavit shall not be applicable to flood load and flood resistance requirements of the building code.
(Ord. No. 5455, § 2, 5-22-18)
Ask a question about Boca Raton law
Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.
