For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-222 — Subsurface utility engineering study required

Code of Ordinances, City of Boca Raton, Florida (Supp. 72 Update 2: codified through Ordinance of June 9, 2026 (online updated October 20, 2026)) · Boca Raton Code of Ordinances § 25-222

Corpus is an independent public-information project, not the official City of Boca Raton website. Stable reference: corpuslaw.us/code/dbc05b52-b09d-4e38-a4d8-251817f58dba

Sec. 25-222. - Subsurface utility engineering study required.

Prior to commencement of any major construction, a registrant shall, if required by the city, conduct a subsurface utility engineering study on the proposed route of construction. The city may waive this requirement in construction situated where it is not necessary. A subsurface utility engineering study consists of: (1) Securing all available "as-built" plans, plats, and other location data indicating the existence and approximate location of all underground equipment along the proposed construction route. (2) Visibly surveying and recording the location and dimensions of any aboveground features of all underground equipment along the proposed construction route, including but not limited to manholes, valve boxes, utility boxes, posts, and visible street cut repairs. (3) Determining and recording the presence and approximate horizontal location of all underground equipment in the rights-of-way along the proposed system construction route utilizing surface geophysical designating techniques such as electromagnetic, magnetic, and elastic wave locating methods. (4) Utilizing nondestructive digging methods, such as vacuum excavation, to determine as precisely as possible, the horizontal, vertical, and spatial position, composition, size, and other specifications of the conflicting underground equipment where system design and the location of underground equipment appear to conflict on the updated system route maps, plans, and computer aided drafting and design ("CADD") files. A registrant shall not excavate more than a 200-millimeter by 200-millimeter square hole in the rights-of-way to complete this task. (5) Plotting and incorporating the data obtained from completion of the tasks described above on the registrant's proposed system route maps, plan sheets, and CADD files in a format designated by the city. (6) Based on all of the data collected upon completion of the tasks described in this section, adjusting the proposed system design elevations, horizontal and vertical locations to avoid the need to relocate other existing underground equipment.

(Ord. No. 4429, § 1, 1-12-99)

Ask a question about Boca Raton law

Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.