Sec. 25-231. - Rights-of-way restoration.

(1) The work to be done under a construction permit, and the restoration of the rights-of-way as required herein, must be completed within the dates specified in the construction permit. (2) In approving an application for a construction permit, the city may at its option choose to restore the rights-of-way itself. If the city chooses to restore the rights-of-way, the registrant shall pay the reasonable and direct costs of restoration that are attributable to the registrant's work in the rights-of-way within 30 days of billing. (3) If the city chooses to allow the registrant to restore the rights-of-way, registrant shall at the time of application post an additional construction bond in an amount determined by the city to be sufficient to cover the cost of restoring the rights-of-way construction, or provide proof of self-insuring status that demonstrates adequate financial resources to defend and cover claims. If, during the 12 months following such restoration, the pavement settles due to registrant's improper backfilling, the registrant shall pay to the city, within 30 days of billing, the cost of repairing said pavement. If, 12 months after completion of the restoration, the city determines that the rights-of-way has been property restored, it shall release the additional construction bond. (4) The registrant shall perform restoration according to the standards and with the materials specified by the city. The city may prescribe the manner and extent of the restoration, and may do so in written procedures of general application or on a case-by-case basis. The city, in exercising this authority, shall be guided by the following standards and considerations: the number, size, depth, and duration of the excavations, disruptions, or damage to the rights-of-way; the traffic volume carried by the rights-of-way; the character of the neighborhood surrounding the rights-of-way; the pre-excavation condition of the rights-of-way; the remaining life-expectancy of the rights-of-way affected by the construction; the balance of the relative cost of the method of restoration with the prevention of accelerated depreciation of the rights-of-way that would otherwise result from construction; and the likelihood that the particular method of restoration will slow the depreciation of the rights-of-way. (5) The registrant guarantees and shall maintain its restoration for 12 months following its completion. During this 12-month period, the registrant shall, within 5 calendar days from the receipt of notification from the city, correct all restoration work to the extent and in the manner requested. (6) If the registrant fails to restore the rights-of-way, the city, at its option, may complete restoration and the registrant shall pay to the city, within 30 days of billing, the cost thereof.

(Ord. No. 4429, § 1, 1-12-99)

Ask a question about Boca Raton law

Corpus searches the Boca Raton sections it holds and shows the ones that match, with their citations. Free, no sign-in.