Sec. 28-1888. - Requirements for building permits and certificates of occupancy.
(1) Building permits and certificates of occupancy. All construction, improvements, buildings, structures and infrastructure associated with an individual development sequence of an EMD master plan or a single-development sequence EMD master plan shall be covered under a single master building permit or, alternatively, shall be covered under individual building permits for each building within the development sequence. No master building permit, nor any individual building permit, shall be issued unless and until the city determines that the permit complies with all applicable requirements including, but not limited to, the Code of Ordinances, the EMD master plan and the applicable development sequence site plan. (2) Single master building permit; issuance of permit; issuance of certificate of occupancy. (a) In the event a single master building permit is sought for a development sequence, such master building permit shall not be issued unless and until each and every portion of construction and other improvements within the applicable development sequence is included within the permit's scope of work, including all infrastructure and associated improvements upon which the construction and other improvements depend for full compliance with the requirements of this Code (including, but not limited to, those requirements set forth in this division 9) and necessary for a development sequence. (b) In the event a single master building permit has been issued for a development sequence, no certificate of occupancy or its functional equivalent (including any temporary certificate of occupancy) shall be issued unless and until all construction and improvements covered under the single master building permit (in other words, all improvements included in the individual development sequence) have been completed and inspected by the city (including all infrastructure for the entire development sequence) to ensure compliance with the code's requirements, including those outlined in this division 9. Provided, however, that in the event a certificate of occupancy is sought for 1 or more buildings in a development sequence (but not for all buildings in the development sequence), then such certificate of occupancy shall be issued if: (i) all infrastructure for the entire development sequence has been completed and approved by the city, and (ii) all other buildings in the development sequence are under active construction pursuant to the aforementioned master building permit, and such construction on each of such buildings has proceeded past the first approved inspection for post-foundation, vertical construction. (3) Individual building permits; issuance of permits; issuance of certificates of occupancy. (a) In the event individual building permits are sought for each building within the development sequence, each permit shall be issued if and only if all infrastructure for the entire development sequence is included within the scope of work of the first such individual building permit to be issued. Additionally, the EMD site plan approval for the applicable development sequence shall expressly detail the sequential order in which the buildings and/or uses may be issued a building permit (the "sequential order of construction"). Each sequential step may include 1 building or multiple buildings and, in the case that a sequential step includes multiple buildings, the buildings within that sequential step may be issued permits and be constructed in any order. Additionally, the applicant for an EMD site plan approval may propose, subject to review and approval by the city, multiple, alternative scenarios for the sequential order of construction. Each individual building permit will be issued if and only if (i) a building permit (or permits) has (or have) been issued for the prior sequential step in the development sequence and construction of the prior sequential step has either received a certificate of occupancy (or its functional equivalent) or is under active construction and has proceeded past the first approved inspection for post-foundation, vertical construction, and (ii) the construction is in compliance with the sequential order of construction specified in the EMD site plan development order. Any sequential order of construction proposed in an application for an EMD site plan shall be subject to review under all applicable requirements for an EMD including, but not limited to, the criteria for approval set forth in section 28-1877, and shall only be approved if upon the completion of each step in the sequential order of development specified in the EMD site plan development order, the applicant demonstrates that the EMD would fully comply with and satisfy said requirements for an EMD (such that, even if no subsequent steps in the development sequence are completed, the EMD would remain in full compliance with all EMD regulations). (b) In the event that individual building permits have been issued for buildings within the development sequence, no certificate of occupancy or its functional equivalent (including any temporary certificate of occupancy) shall be issued for any building unless and until: all infrastructure for the entire development sequence has been completed and approved by the city. (4) Development risks. Permit issuance, inspections and all other acts in connection with development order approval, construction, or determinations of compliance with applicable city codes shall not create, or form the basis of, a claim of estoppel, vested rights, nor serve as an assurance or guarantee that a certificate of occupancy will be issued with regard to any such permit or construction (notwithstanding compliance with the Florida Building Code and the status of completion of construction under such permit). The permit holder's ability to obtain a certificate of occupancy is inextricably tied to certificate of occupancy conditions/requirements for the development sequence, as set forth in subsections (2) and (3) (including, without limitation, the construction/requirements related to their own permit as well as to any other work/construction/requirements for the development sequence pursuant to subsections (2) and (3). Accepting a permit entails understanding and assuming the risks, including potential investment loss and potential non-receipt of a certificate of occupancy (and inability to occupy and utilize a building). The city shall not bear any liability for any project's completion or certificate of occupancy issuance. (5) Infrastructure. For purposes of this section, "infrastructure" shall mean streets and sidewalks, utilities, street trees and other landscaping within public or private rights-of-way, driveway connections, parks or other open spaces intended for use by the public or general users within the EMD, and such similar improvements, in the sole determination of the city manager or designee. Provided, however, in the sole discretion of the city manager or designee, certain de minimis infrastructure may be exempted from this requirement if construction remaining to be completed would result in the damage or destruction of such de minimis infrastructure. In such cases, the developer shall ensure the timely completion of such de minimis infrastructure as specified by the city by posting a cash bond with the city, thereby granting full rights to the city (if the city elects) to complete the de minimis infrastructure. (6) Existing improvements; tenant improvements. Any development sequence may include existing improvements, along with proposed improvements to be constructed as part of the development sequence. Nothing contained herein to the contrary shall prevent a separate and concurrent permit from being issued for interior-only tenant improvements.
(Ord. No. 5655, § 7, 10-11-23)