Sec. 28.93. - Permit required.

Prior to any construction, except that construction which qualifies for an annual general permit or is an emergency, the utility shall proceed with due diligence to obtain all necessary permits and authorizations which are required in the conduct of its business, including, but not limited to, any utility joint use attachment agreements, conduit use agreements, microwave carrier licenses, and any other permits, licenses and authorizations to be granted by duly constituted regulatory agencies having jurisdiction over the operation of the particular type of utility service that the utility provides. A utility shall not begin any construction prior to the procurement of the necessary permits. No person shall begin any construction within any rights-of-way without first obtaining a rights-of-way construction permit or an annual general permit from the city. This requirement shall also apply to all contractors and/or utilities performing work within the city's rights-of-way. Such permits are in addition to any other approvals that may be required. Construction in the rights-of-way without a permit is expressly allowed in the event of an emergency. (1) Annual general permit. A utility shall apply for an annual general permit no later than November 1 of each year, and the effective dates of that permit shall be from January 1 until December 31 of the subsequent year. A utility annual general permit shall be required of utilities existing within the rights-of-way prior to January 1 of the effective year of the permit for the following activities: (a) Telecommunications service providers; new customer service: 1. Installation of service drops from serving location; 2. Installation of a new buried distribution cable that does not cross or begin in the pavement; 3. Extension of a buried distribution cable that does not cross or begin in the pavement; 4. Extension of two-way four-inch conduit system that does not cross or begin in the pavement; 5. Adding a new terminal to existing cable; 6. Pulling in new underground feeder cables in on existing permitted conduit or manhole and conduit system; 7. Digging of a splice hole to splice a new cable or adding a terminal; 8. Digging of a splice hole for cable acceptance testing for quality; 9. Digging of a splice hole to change the count of a cable leg for new service; and 10. Extension of existing aerial distribution cable from existing poles providing other aerial utility service still exists and providing it does not cross the pavement. (b) Telecommunications service providers; maintenance of existing facilities: 1. Replacement of existing service drops; 2. Replacement/ repair of existing terminals; 3. Replacement/ repair of existing aerial cable providing other aerial utility service still exists and providing it does not cross the pavement; 4. Replacement/ repair of existing underground feeder cable in an existing permitted manhole and conduit system; 5. Pumping water out of a manhole to maintain underground cables in conduit system; 6. Digging of splice holes to locate and repair air leaks in cables; 7. Digging of a splice hole to change the count of a cable; 8. Digging of a splice hole to add a side leg off feeder cable; 9. Digging of a hole to repair broken conduits; 10. Digging of a splice hole for cable acceptance testing for quality; 11. Digging of a splice hole to repair wet or damaged cable; 12. Digging of a hole to verify the location of buried facilities; 13. Removal of facilities no longer needed for services; 14. Adjust aerial facilities to meet National Electric Safety Code; and 15. Any facility relocations required for city improvements. (c) Cable service providers and electric utilities: 1. Routine maintenance of equipment, including, but not limited to, poles, overhead/underground transformers, streetlights and brackets, wire and cable (aerial or underground), pedestals, switches, arresters, risers, fuses and all associated hardware; 2. Installation of equipment in order to provide new customer service, providing it does not cross the pavement; 3. Extend and/or replace existing facilities parallel to the rights-of-way, provided it does not cross pavement; 4. Replace, repair, or upgrade existing facilities, provided it does not cross pavement; 5. Retire services and mains; 6. Install monitoring devices as necessary; 7. Perform field inspections for conditions and locations of electric facilities; 8. Perform miscellaneous minor maintenance related work; 9. Install electric facilities in existing casing/pipe or conduit system; 10. Removal of facilities no longer needed for service; 11. Adjust aerial facilities to meet National Electric Safety Code; and 12. Any facility relocations required for city improvements. (d) A utility operating under an annual general permit should provide the city staff with weekly locations and schedule of construction in the rights-of-way. If a utility is operating under an annual general permit and the construction is not on a provided weekly map and schedule, the utility must notify the city staff at least 24 hours before commencement of such construction. The city staff shall also be notified within 24 hours of completion of construction in the rights-of-way pursuant to this subsection. (e) A utility must submit the following to obtain an annual general permit: 1. Name and address of the utility; 2. Generalized maintenance of traffic control plan and erosion control plan; 3. Either proof of a valid franchise or valid registration with the city, pursuant to Chapter 32, Code of Ordinances, or a letter from the city manager stating that the utility is expressly permitted by the city to operate within the rights-of-way without a franchise or registration; and 4. Any other information as the city staff shall find reasonably necessary to the determination of whether a permit should be issued hereunder. (f) A utility engaging in construction in the rights-of-way under an annual general permit is subject to the construction specifications in section 28.95. (2) Rights-of-way construction permit. (a) Unless operating under an annual general permit or in the case of an emergency, a utility shall obtain a rights-of-way construction permit prior to any construction in the rights-of-way. The permit application shall contain at the minimum the following information: 1. The addresses of the properties located at the termination points of the proposed work area; 2. Name and address of the party doing the work; 3. Name and address of the party requesting the work, if the work is not to be performed by the utility; 4. Location of the work area, including right-of-way and pavement width; 5. A site map for the construction detailing the existing conditions, including but not limited to existing utilities, and the proposed work; 6. A maintenance of traffic plan; 7. An erosion control plan; 8. A tree survey showing all protected trees impacted by the proposed work; 9. A proposed timetable which contains a detailed description of each phase of construction; 10. Unless operating under an annual general permit, proof of a valid franchise or valid registration with the city, or a letter from the city manager stating that the utility is expressly permitted by the city to operate within the rights-of-way without a franchise or registration; and 11. Any other information as the city staff shall find reasonably necessary to assure adherence to construction specifications contained in section 28.95. (b) Any plans submitted shall not unreasonably or unnecessarily conflict with, create access difficulty, or otherwise adversely affect the city's use and construction of any of its utilities. (c) The city shall, within five working days of receipt of a completed application, issue a decision regarding a permit request. If the permit is not issued, the city shall provide the utility with reasons why the permit was not issued. The utility shall have three days to cure the defects in their application for a permit for construction in the rights-of-way, and if the defects are cured, the city shall approve the scheduled construction. If the utility does not cure the defects in its application for permit, the city shall deny the issuance of the permit. The utility may reapply for a permit at any time after a final denial. (d) If a utility wishes to challenge the denial of a permit, the utility may submit a request for appeal to the city manager no later than 30 days after final denial of the permit. The city manager shall render a decision on the appeal within ten days after submission of the appeal. (e) If the utility wishes to challenge the denial of a permit by the city manager, the utility may submit a notice of appeal to the city commission no later than 30 days after the denial of the permit. The city commission shall hear the appeal at the next scheduled regular meeting of the commission. The city commission shall render a decision on the appeal in writing within ten days after hearing the appeal. The decision of the city commission shall be final. (f) A utility shall contact the city public works field inspections division at least 48 hours before construction will begin. (g) Commencement of construction shall take place as soon as possible after issuance of a permit by the city, but not later than five days after Florida One-call line location, as required by Chapter 556, Florida Statutes. If construction of an approved plan is not commenced within three months of the issuance of the necessary permit or a shorter time to be determined by the city staff for good cause, unless the utility provides good cause in writing for the delay, it is presumed that the utility failed to proceed expeditiously, and the city staff shall revoke the subject permit. (h) Within 24 hours after completion of construction in the rights-of-way, the utility shall notify the city staff of completion via facsimile or via telephone. After notification is received, the permit issued automatically expires, provided that the site has been restored. (3) Permit fees. (a) Each application for an annual general permit or a rights-of-way construction permit shall be accompanied by a fee as set out in Appendix A to this Code, established by resolution by the city commission, to cover the cost of processing the application. (b) Telecommunications service providers are exempt from this fee. If Laws of Fla. 2000-260 is repealed, telecommunications service providers shall be subject to this fee as if Laws of Fla. 2000-260 had never been passed. (c) A utility possessing a franchise with the city on the effective date of this section, is exempt from this fee. Any utility negotiating with the city for a franchise after the effective date of this section shall have the ability to be exempt from the permit fee if the franchise fee represents the maximum fee allowed by law for use of the right-of-way or if the franchise states that the franchise fee represents full or total compensation for the use and occupation of the right-of-way.

(Ord. No. 6637-00, § 1, 12-12-00)