§ 28.95 — Construction specifications
Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Code of Ordinances § 28.95
Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/6f1ef126-08a2-4cdc-b32a-7789f0a0fb2d
Sec. 28.95. - Construction specifications.
(1) All construction of any facilities in the rights-of-way by any utility shall be performed in an orderly and professional manner. (2) The city reserves the right to limit the work of the utility to assure a minimum of inconvenience to the traveling public and the citizens living and/or working in the area. (3) Unless state or federal law or a state or federal agency with jurisdiction over the utility require otherwise, the city may request that a utility locate its facilities within a specific portion of the rights-of-way, so long as the request is reasonable and not technically or economically impossible. (4) If any utility seeks to place any new facilities in the rights-of-way, those facilities shall be placed underground, unless federal or state law or a federal or state agency preempt the city's right to require the utility to place facilities underground or unless it is technically or economically impossible to do so. (5) Conduits shall be stacked or bundled so as to occupy as little space as possible in the rights-of-way. (6) Except as otherwise provided by state or federal law or a state or federal agency with jurisdiction over the utility, poles that meet the definition of new facilities shall not be placed in the rights-of-way by a utility. (7) If any underground facilities are to be constructed under pavement in the right-of-way, the utility constructing said facilities shall use a boring technique. If boring is economically or technically impossible, the utility may seek approval from the city staff to cut any pavement or excavate in order to construct facilities. Pavement shall not be cut unless no other reasonable construction alternative is available and no alternative exists as to the desired route that will avoid the cutting of the pavement. (8) If there is an active plan to resurface any right-of-way within 12 months, a utility may cut the pavement of a right-of-way despite the provisions of subparagraph (7). (9) Prior to the commencement of any construction, the utility shall obtain all required permits from the city engineering, building, or other appropriate departments prior to any construction being performed in the city's rights-of-way. Permits will be issued to a utility or its qualified contractors only on approved plans, which shall be submitted on or before the request for construction permit. All work shall be done in accordance with the city's specifications. (10) The city reserves the right to require relocation and construction of such portions of the utility's facilities as public safety may dictate. (11) A city public works inspector shall be present at various times during construction of facilities in order to assure compliance with any permits or approvals issued. The utility and/or its contractor is responsible for safety and is required to meet all federal, state, and local construction standards. (12) At all times, at least one individual performing construction on facilities shall speak English. (13) If any terminals, cross-connect boxes, pedestals, junction boxes or other like facilities are to be placed in the rights-of-way, they shall be placed as close to the property lines of adjacent private property as possible. Unless otherwise required by state or federal law or state or federal agency, and unless technically or economically impossible, all new construction of terminals, cross-connect boxes, pedestals, junction boxes or other like facilities shall be placed at or below grade. The smallest and least obtrusive terminals, cross-connect boxes, pedestals, junction boxes or other like facilities shall be exclusively used. (14) Storm sewer inlets shall be protected from siltation at all times. (15) Following construction all disturbed areas must be stabilized with sod, grass, mulch or other means approved by city staff. (16) Soil stockpiles to remain for more than 24 hours must be protected by measures which prevent wind or water erosion. (17) When work is adjacent to surface water bodies or wetlands silt fences must be provided. (18) If a utility seeks to permanently or temporarily remove any greenery from the rights-of-way, the utility seeking to remove the greenery shall consult with the city's public services department. (19) Any permanent removal of greenery from rights-of-way or public land is specifically prohibited unless it is necessary. Permanent removal of greenery is presumed unnecessary and specific facts regarding the necessity of removal shall be provided to the public services department. For purposes of this subparagraph, necessity shall mean that the wires or cables cannot pass clearly without any branches or roots touching them and that the branches or roots threatening to touch the wires or cables are major structural branches or roots that may cause a safety hazard or the death of the tree if removed. (20) If any utility seeks to temporarily remove greenery from rights-of-way or public lands to install underground facilities or otherwise construct facilities, the utility shall submit a plan to the public services department that proposes to restore the disturbed area to its previous state, or as close as possible to its previous state. If the plan is acceptable, the utility may remove the greenery and restore the area according to its plans. If the plan is unacceptable, the public services department shall state the defects in the plan within 30 days of the proposed construction. If the utility resubmits a plan for restoration correcting the defects, the public services department shall approve the plan, unless the city has inappropriately applied its requirements. (21) If any utility finds it necessary to trim or remove trees or greenery in the rights-of-way or on public land in order to avoid contact between wires or cables and branches, the utility shall notify the Urban Forestry Division at least 48 hours prior to the proposed trimming. At the option of the city, the greenery may be trimmed either by the city at the expense and under the supervision of the utility or by the utility under the supervision of the city. When authorized, trimming of greenery shall be limited to the area required for clear cable passage and shall not include major structural branches which materially alter the appearance and natural growth habits of the tree. Any greenery may not be trimmed in a manner that would be in violation of Article 3 of the Clearwater Community Development Code. The utility shall be responsible for any and all damages to any greenery as a result of trimming or to the land surrounding any tree or greenery. (22) The requirements for barricading, root pruning, and proper pruning of protected trees, as contained in Article 3 of the Clearwater Community Development Code, apply to all construction covered by this section.
(Ord. No. 6637-00, § 1, 12-12-00)
Ask a question about Clearwater law
Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.
