For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-904 — Mobility management system

Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Community Development Code § 4-904

Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/dd91d536-3c24-4898-aa53-a50c29a9abf0

Section 4-904. - Mobility management system.

A. Purpose and intent. The purpose of this section is to provide a more flexible and efficient alternative to the traditional form of transportation concurrency management, which ties development approvals to maintaining adopted roadway level of service standards, while facilitating multi-modal transportation solutions. B. Applicability. The mobility management system shall apply to all developments in the City of Clearwater, pursuant to the requirements of 4-904.C. C. General requirements. All development projects within the City of Clearwater that generate new peak hour trips are subject to the provisions of this section to address their development impacts. Determination of trip generation associated with an application for development shall be based on Schedule A or B in Section 150-40 of Pinellas County Land Development Code, or the latest edition of the Institute of Transportation Engineers Trip Generation Manual. As an alternative to the fee schedule and Trip Generation Manual, the applicant may submit a trip generation study in accordance with Section 4-905.C.4.a. and b. 1. Deficient road corridors include parcels, all or a portion of which lie within a corridor, and are defined as: a. Sole direct access. A condition where the only means of site ingress/egress is directly onto the road facility, regardless of the distance of that site from the facility; b. Direct access. A condition in which one or more existing or potential site ingress/egress points makes a direct connection to the road facility and the site is within one-half mile of the road facility; and c. Sole indirect access. A condition where the only point of site ingress/egress is onto a public non-arterial roadway which makes its first and shortest arterial level connection onto a road facility regardless of the distance of that site from the facility. 2. Deficient road corridors are listed within the most recent Pinellas County Metropolitan Planning Organization's annual Level of Service Report. 3. Development projects that generate less than 51 new peak hour trips are required to pay a multi-modal impact fee in accordance with Section 4-905. They are not required to submit a transportation management plan or study. 4. Tier 1 projects. Tier 1 projects are development projects that generate between 51 and 300 new peak hour trips. a. Developers of Tier 1 projects located within deficient road corridors are required to submit a transportation management plan designed to address their impacts while increasing mobility and reducing the demand for single occupant vehicle travel. b. The cost of transportation management strategies implemented for Tier 1 projects are creditable toward their multi-modal impact fee assessment. If the cost of the improvement exceeds the assessment, the development project would not be subject to payment of the fee. 5. Tier 2 projects. Tier 2 projects are development projects that generate more than 300 new peak hour trips. a. Developers of Tier 2 projects within deficient road corridors are required to conduct a traffic study and submit an accompanying report. The report shall include the results of the traffic study and a transportation management plan identifying improvements necessary to mitigate the impacts of the project. b. The cost of transportation management strategies implemented for Tier 2 projects may be applied as credit toward the project's multi-modal impact fee assessment or payment of the fee could be included as part of a transportation management plan. 6. Development projects that generate more than 50 new peak hour trips on non-deficient road corridors shall be reviewed by the city to determine if the impacts of the project adversely affect the level of service of the surrounding road network. If it is determined that approval of the development project reduces the level of service of the adjacent road(s) to peak hour level of service E or F or would cause the volume-to-capacity ratio to reach or exceed 0.9, a transportation management plan is required. The applicant may submit a traffic study to verify whether their project would affect the level of service of adjacent road(s). A transportation management plan is required if the results of the traffic study confirm the finding of the city, and the transportation management plan for such developments shall comply with the requirements of Tier 1 or Tier 2 projects, as described in Sections 4-904.C.2. and 3. 7. Transportation management plans. At the time of site plan review, the city shall analyze the development impacts of a project. A transportation management plan is required for development applications subject to Sections 4-904C.3, 4, and 5, utilizing transportation management strategies/improvements to address their development impacts. The extent of the strategies/improvements included in an approved transportation management plan in terms of the scale of the project(s) and roadway capacity and/or mobility benefits provided shall be based primarily on the project(s) impact on the surrounding traffic circulation system. Specific conditions of the deficient road corridor impacted by the development shall also be considered. Transportation management plans must be developed by the applicant and accepted by the city. If the project impacts a State road, the applicant shall also submit the transportation management plan to the Florida Department of Transportation District 7 Office. Transportation management plans seeking to implement strategies that do not involve structural improvements, such as ride sharing and transit incentive programs, must include a monitoring program to ensure the strategies are carried out in accordance with the plan. Site-related improvements are not eligible for inclusion in transportation management plans. Transportation management plan strategies/improvements include, but are not limited to, those listed below: a. Intensity reduction. The intensity of the proposal may be reduced through an across-the-board reduction of the permitted floor area ratio, as it would otherwise normally apply to the proposal. Other such corrective actions that would reduce the intensity of the proposal may also apply. b. Density reduction. The density of the proposal may be decreased by a reduction in the number of units per acre below that which would otherwise normally apply to the proposal. c. Project phasing. A project may be divided into logical phases of development by area, with later phases of the development proposal's approval withheld until the needed facilities are available. d. Outparcel deletion. Those portions of the proposal characterized as outparcels that create separate and unique impacts may be deleted from the total proposal. e. Physical highway improvements. A project may construct link capacity improvements, acceleration/deceleration lanes, intersection improvements, or frontage roads. f. Operational improvements (signal). This includes efforts involving signal removal or signal timing improvements. g. Access management strategies. These include access management controls such as the preclusion of a direct connection to a level of service deficient facility, right-in/right-out driveways, alternative driveway locations, reduction of a driveway, single point access, shared access, or the implementation of median controls. h. Mass transit initiatives. A project may implement a plan to encourage transit (e.g., employer-issued bus passes). Other mass transit initiatives may include, but are not limited to, the construction of bus stop amenities, bus pull-off areas, and dedication of park and ride parking spaces. i. Demand management/commuter assistance. These include efforts to encourage ride-sharing (e.g., designated parking spaces for carpools, employer-sponsored carpool programs, participation in transportation management organization/initiative programs), and implementing flexible work hour and telecommuting programs. j. Bicycle/pedestrian improvements. These would involve structural improvements or construction of a bikeway or sidewalk connecting an existing bikeway/sidewalk network or providing access to a school, park, shopping center, etc. These improvements may also include pedestrian treatments in parking areas, sidewalks connecting developments with adjacent land uses, trail improvements and bicycle rack and on-street bicycle lane installations, and the planting of trees to provide shade canopy along sidewalks. k. Intelligent transportation system improvements. This includes improvements pertaining to computerized traffic signal systems that automatically adjust to maximize traffic flow and to permit emergency vehicles to pass through intersections quickly. It also includes freeway management systems, such as electronic message signs, and electronic fare payment on public buses that reduce passenger boarding time. l. Livable community site design features. These include, but are not limited to, implementation of pedestrian friendly site design features such as orienting buildings toward the street and parking lots to the side or rear of buildings.

(Ord. No. 8806-16, § 7, 5-5-16)

Ask a question about Clearwater law

Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.