For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 4-905 — Multi-modal impact fee

Code of Ordinances of the City of Clearwater, Florida (Supp. No. 90: codified through Ordinance No. 9859-26, enacted January 15, 2026) · Clearwater Community Development Code § 4-905

Corpus is an independent public-information project, not the official City of Clearwater website. Stable reference: corpuslaw.us/code/f05850be-ee41-4b50-ae02-918e47c767b2

Section 4-905. - Multi-modal impact fee.

A. Purpose and intent. The purpose of this section is to establish the required payment of multi-modal impact fees, the computation of those fees, fee credits, disposition of funds, refunding of fees, and exemptions of fees. B. Fee required. The payment of a multi-modal impact fee shall be required in the manner and amount set forth in this section. 1. Any person who seeks a certificate of occupancy for any land development activity or seeks to change a use by applying for issuance of a building permit which will generate additional traffic shall be required to pay a multi-modal impact fee. 2. No certificate of occupancy or building permit requiring payment of a multi-modal impact fee pursuant to Section 4-905.C. shall be issued unless and until the multi-modal impact fee has been paid. 3. Any person who has submitted a site plan or building permit application in accordance with land development codes prior to the adoption of Ord. No. 8806-16 shall be subject to the terms of the ordinance that was in effect at the time the site plan or building permit application was submitted. C. Computation of amount. The amount of the multi-modal impact fees imposed under this section will depend on a number of factors, including the type of land development activity, and several fixed elements, such as the average cost to construct one lane-mile of roadway ($2,216,466.00) and the average capacity of one lane-mile of roadway (6,900 vehicles per day). 1. The following formula shall be used by the city to determine the impact fee per unit of development: TGR × %NT × TL × CST (RF) CAP × 2 WHERE: TGR = Trip generation rate, as per fee schedule %NT = percent new trips TL = Average trip length, varies by land use CST = The cost to construct one lane-mile of roadway ($2,216,466.00) CAP = The capacity of one lane-mile of roadway (6,900 vehicles per lane, per day) 2 = Allocation of one-half the impact to the origin and one-half to the destination RF = Reduction factor (0.268) 2. At the option of the feepayer, the amount of the multi-modal impact fee may be determined by the Impact Fee Schedule A or B in Section 150-40 of the Pinellas Land Development Code. 3. In the case of a new use, redevelopment, or modification of an existing use, the impact fee shall be based upon the net increase in the impact fee for the new use as compared to the impact fee for the highest previous use in existence on or after the adoption of the ordinance from which this section derives. The city shall be guided in this determination by the County's transportation impact fee study (February 1990), independent study trip generation data, or the Institute of Transportation Engineers Trip Generation, sixth (or successor) edition. 4. If a feepayer opts to not have the impact fee determined according to subsections 1 or 2 of this section, then the feepayer shall prepare and submit to the city for approval of an independent fee calculation study for the land development activity for which a certificate of occupancy or building permit is sought. The traffic engineering and/or economic documentation submitted, which will require a pre-application meeting with the city, shall show the basis upon which the independent fee calculation was made, including, but not limited to the following: a. Traffic engineering studies: 1. Documentation of trip generation rates appropriate for the proposed land development activity. 2. Documentation of trip length appropriate for the proposed land development activity. 3. Documentation of the cost per land mile for roadway construction for the proposed land development activity. b. Economic documentation studies: 1. Documentation of the cost per lane per mile for roadway construction for the proposed land development activity. 2. Documentation of credits attributable to the proposed land development activity which the feepayer will make available to replace the portion of the service volume used by the traffic generated by the proposed land development activity. 5. Trip generation documentation other than traffic engineering or economic documentation studies, as described in Section 4-905.C.4.a and b may be submitted by the applicant in consideration of an independent fee calculation. D. Payment of fees and credits. The person applying for the issuance of a certificate of occupancy or building permit shall pay the multi-modal impact fee to the city prior to the issuance of such permit. Fees for mobile homes shall be payable prior to issuance of the permits which allow the mobile home to move on to a lot. Fees shall be collected as part of the normal permitting process of the city. The city manager or his designee shall have full collection authority as well as full discretion for approval of alternative methods for calculation of impact fees on a case-by-case basis. All funds collected under this section shall be promptly transferred for deposit into the appropriate impact fee trust account. E. Fee credits. The following improvements to the transportation system may be eligible for credit against the multi-modal impact fee or an impact fee adjustment or reduction. Certain site related improvements or land dedicated for related right-of-way shall not be given any credit towards the impact fee. 1. Construction of on-site trail, pedestrian, or bicycle facility if part of a trail, bicycle, or pedestrian network identified in Metropolitan Planning Organization Long Range Transportation Plan or the Clearwater Comprehensive Plan is eligible for credit against impact fee assessment. 2. All transportation improvements required under a city approved development order issued for a new development or a development of regional impact approved prior to the adoption date [May 5, 2016] of the ordinance from which this section derives shall be credited against multi-modal impact fees up to the total amount of the impact fee. Those improvements deemed as site-related or on-site, shall not be credited against the multi-modal impact fee. 3. Mixed-use developments consisting of complementary land uses that are designed with connectivity to allow for a reduction in trip lengths and/or percent new trips are eligible for an impact fee rate adjustment based on trip generation data for similar uses. 4. Commuter assistance programs with long-term contract(s) facilitating ride sharing activity are eligible for an impact fee rate reduction based on the reduction in the number of single-occupant vehicle trips that would otherwise be associated with the project. 5. Bus stop shelters, including pads, are eligible for a credit against the impact fee assessment in an amount equal to the cost of the improvement or one percent of the fee, whichever is greater. 6. Construction of shared driveway(s) between adjacent properties is eligible for a credit against the impact fee assessment in the amount that is 50 percent of the construction cost for the portion of the driveway that is located off-site. 7. Construction of shared inter-connecting parking lots is eligible for a credit against the impact fee assessment in an amount that is 50 percent of the construction cost for the portion of the parking area located off-site. 8. Sidewalks constructed for credit against impact fee assessments must provide connection between the site and surrounding sidewalk network and/or major destination point such as a park, shopping center, school, community center, etc. 9. Pedestrian and bicycle facilities connecting neighboring properties may be eligible for credit against impact fees for the portion of the construction that is off-site. 10. Off-site crosswalk enhancements, including curb bulb-out at intersection, pavement marking, or raised crossings are eligible for credit against impact fee assessment. 11. The city manager or his or her designee may accept an offer by the feepayer to implement all or part of a transportation improvement project consistent with the Clearwater Comprehensive Plan or the metropolitan planning organization's long range transportation plan. The project(s) may be for any mode of transportation, including rail, transit, pedestrian, or bicycle, providing that it serves to add to the capacity of the surrounding transportation circulation system or to increase mobility and reduce the dependence on automobile travel. This offer shall not include site-related or on-site improvements. These transportation improvements must be in accordance with city, county, or state requirements, whichever are applicable. The feepayer shall provide the following to the city manager or his designee to determine consistency with city requirements: a. Submit an offer to make improvements in lieu of a fee payment; and b. A letter detailing the improvements to be made, improvement plans, and a construction cost estimate in sufficient detail. If the city manager or his designee accepts such an offer, the cost of the improvement project, except for the improvements identified in Sections 4-905.E.5, 6, and 7, shall be credited against the multi-modal impact fee assessed on the proposed development. Upon satisfactory completion and construction approval of the transportation improvement made in lieu of all or a portion of the impact fee due, the improvement shall be accepted by the city for future maintenance. If the certificate of occupancy is requested prior to the completion of the approved project, then a performance bond shall be provided to the city manager or his designee to cover the balance of all work required following issuance of the certificate of occupancy. 12. Sections 4-905.E.1 through 11 do not apply to development projects that are subject to the requirements of Sections 4-904.C.4 and 5. F. Disposition of funds. Funds collected from multi-modal impact fees shall be used exclusively for the purpose of projects that improve the capacity of the surrounding traffic circulation system. These projects may involve improvements to transportation modes such as transit, pedestrian, and bicycle travel as well as roadway expansion. Such improvements shall be of the type as are made necessary by the new development. Specific projects to receive funds from impact fees collected shall be determined by city council. Priorities for impact fee funded transportation improvements shall be established by city council in compliance with adopted plans and the transportation improvement program of the metropolitan planning organization. 1. No funds collected under this article shall be used for periodic maintenance, as defined in F.S. Chapter 334, as amended. 2. Fees collected within a community development or tax increment financing district shall be expended within such district. If the project(s) benefit the district from where the fees were collected, the fees can be expended in a neighboring district. Parking garages for general public purposes shall be considered eligible transportation improvements within such areas or districts. 3. Multi-modal impact fees collected by the city shall be held by the city until the end of the fiscal year in which collected. At the beginning of each new fiscal year, one-half of all fees collected, and the accrued interest thereon, less the four percent retained from the total fee collected for administrative costs, shall be forwarded to the board of county commissioners for placement in the appropriate trust account. The remaining one-half shall be deposited in the city's multi-modal impact fee trust account. All fees must be disbursed, encumbered, or refunded by the city in a manner consistent with this section. 4. If the city wishes to expend the portion of the fees which are due to the county, the city may do so with the approval of the county administrator and the city manager or his or her designee. 5. Multi-modal impact fees collected on the state road network within the city may be made available for construction of improvements on the state road network within the city. 6. Multi-modal impact fee funds shall be administered as an independent component of the capital improvement element of the Clearwater Comprehensive Plan, as required by F.S. Chapter 163. Each fiscal year, the city manager or his or her designee shall present to city council the district improvement programs for transportation expenditures. These programs shall assign transportation improvement costs and related expenses to the trust account for specific transportation improvement projects. Monies, including any accrued interest not assigned in any fiscal year, shall be retained in the same impact fee trust account until the next fiscal year, except as provided by the refund provisions of this section. The city shall retain four percent of the fees collected for administrative costs. G. Refund of fee paid. Any funds not expended or encumbered by the end of the calendar quarter immediately following ten years from the date that the multi-modal impact fee was paid, upon application of the feepayer, within 180 days of that date, be returned to the feepayer with interest at a yearly rate to be determined by the Consumer Price Index effective January 1, which is to be applied to the preceding year for each year the deposit is held. H. Exemptions. The following shall be exempted from payment of the multi-modal impact fee: 1. Alteration or expansion of an existing building where no additional units or floor area are created, use is not changed, and where no additional vehicular trips will be produced over and above that produced by the existing use; 2. The construction of accessory buildings or structures which will not produce additional vehicular trips over and above that produced by the principal building or use of the land; 3. The replacement of a building or structure with a new building or structure of the same use provided that no additional trips will be produced over and above those produced by the original building or structure; and 4. The construction of publicly-owned facilities used primarily for traditional government uses.

(Ord. No. 8806-16, § 8, 5-5-16)

Ask a question about Clearwater law

Corpus searches the Clearwater sections it holds and shows the ones that match, with their citations. Free, no sign-in.