Sec. 13-140. - Consistency and concurrency determination standards; consistency with city/county comprehensive plan.

(a) Generally. No development activity may be approved unless it is found that the development is consistent with the city/county comprehensive plan and that the provision of certain public facilities will be available at prescribed levels of service concurrent with the impact of the development on those facilities. (b) Definitions relating to plan implementation. (1) Administrative rules document means a publication containing rules, guidelines, procedures, and methodologies reviewed, revised, adopted and amended by the Broward County Planning Council and Board of County Commissioners for the purpose of providing assistance and guidance to local governmental entities and providing direction to council staff in implementing the Broward County Land Use Plan. (2) Amendment means any change to an adopted comprehensive plan exception corrections, updates and modifications of the capital improvements element concerning costs, revenue services, acceptance of facilities or facility construction dates consistent with the plan as provided in Subsection 163.3177(3)(b), Florida Statutes, and corrections, updates or modifications of current costs in other elements, as provided in Section 163.3187(2), Florida Statutes. (3) Broward County Land Use Plan means the future land use plan element for all of Broward County adopted by the Broward County Commission in conformance with the requirements of the Broward County Charter and the Local Government Comprehensive Planning and Land Development Regulation Act. (4) Broward County Trafficways Plan means the plan promulgated by the Broward County Planning Council pursuant to Chapter 59-1154, Laws of Florida, as amended, and the Broward County Charter, which depicts a network of trafficways for Broward County (also known as the Broward County Planning Council Trafficways Plan). (5) Building permit means: a. Any permit for the erection or construction of a new building required by Section 104.1 of the Florida Building Code. b. Any permit for an addition to an existing building which would: 1. Create one (1) or more additional dwelling units; or 2. Involve a change in the occupancy of a building as described in Section 104 of the Florida Building Code. c. Any permit which would be required for the nonresidential operations included in Section 104.1 of the Florida Building Code. (6) Capital budget means the portion of each local government's budget which reflects capital improvements scheduled for a fiscal year. (7) Capital improvement means physical assets constructed or purchased to provide, improve or replace a public facility and which are large scale and high in cost. The cost of a capital improvement is generally nonrecurring and may require multi-year financing. For the purpose of this rule, physical assets which have been identified existing or projected needs in the individual comprehensive plan elements shall be considered capital improvements. (8) Certified land use plan means a local land use plan which has been certified by the Broward County Planning Council as being in substantial conformity with the Broward County Land Use Plan and which has been adopted by a unit of local government in conformance with the requirements of the Local Government Comprehensive Planning and Land Development Regulation Act. (9) Comprehensive plan means a plan that meets the requirements of Sections 163.3177 and 163.3178, Florida Statutes. (10) Concurrence means public facilities and services needed to support development shall be available at the same time or coincidental with the impacts of such development. (11) Concurrence management system means the provisions in the local government comprehensive plan including implementation regulations, encompassing the restrictions, methods, resources, timing and solutions intended to be compatible with and further compliance with the statutory requirement to provide public facilities and services needed to support development concurrent with the impacts of such development. (12) Consistent means compatible with and furthers. "Compatible with" means not in conflict with. "Further" means to take action in the direction of realizing the goals and policies. As applied to the local plan, a local plan shall be consistent with the state plan and the regional plan. (13) Developer means any person, including a governmental agency, undertaking any development. (14) Development. The term "development" means: a. The carrying out of any building activity or mining operation, the making of any material change in the use of appearance of any structure of land, or the dividing of land into two (2) or more parcels. b. The following activities or uses shall be taken for the purposes of this chapter to involve "development", as defined in this section: 1. A reconstruction, alteration of the size, or material change in the external appearance of a structure on land. 2. A change in the intensity of use of land, such as an increase in the number of dwelling units in a structure or on land or a material increase in the number of businesses, manufacturing establishments, offices, or dwelling units in a structure or on land. 3. Alteration of a shore or bank of a seacoast, river, stream, lake, pond, or canal, including any "coastal constructure" as defined in Section 161.021. 4. Commencement of drilling, except to obtain soil samples, mining, or excavation on a parcel of land. 5. Demolition of a structure. 6. Clearing of land as an adjunct of construction. 7. Deposit of refuse, solid or liquid waste, or fill on a parcel of land. c. The following operations or uses shall not be taken for the purpose of this chapter to involve "development" as defined herein: 1. Work by a highway or road agency or railroad company for the maintenance or improvement of a road or railroad track, if the work is carried out on land within the boundaries of the right-of-way. 2. Work by any utility and other persons engaged in the distribution or transmission of gas or water, for the purpose of inspecting, repairing, renewing, or constructing on established rights-of-way any sewer. 3. Work for the maintenance, renewal, improvement, or alteration of any structure, if the work affects only the interior or the color of the structure or the decoration of the exterior of the structure. 4. The use of any structure or land devoted to dwelling uses or any purpose customarily incidental to enjoyment of the dwelling. 5. The use of any land for the purpose of growing plants, crops, trees, and other agricultural or forestry products; raising livestock; or for other agricultural purposes. 6. A change in use of land or structure from a use within a class specified in an ordinance or rule to another use in the same class. 7. A change in the ownership or form of ownership of any parcel or structure. 8. The creation or termination of rights of access, riparian rights, easements, covenants concerning development of land, or other rights of land. d. "Development," as designated in an ordinance, rule, or development rule includes all other development customarily associated with it unless otherwise specified. When appropriate to the context, "development" refers to the act of developing to the result of development. Reference to any specific operation is not intended to mean that the operation or activity, when part of other operations or activities, is not development. Reference to particular operations is not intended to limit the generality of subsection (a). (15) Development order means any order, ordinance, resolution, or administrative approval issued pursuant to this chapter, granting, denying, or granting with conditions, an application for a development permit. (16) Development permit includes any building permit, zoning certificate, plat approval, or rezoning, certification, variance, or other action having the effect of permitting development. (17) Drainage facilities means a system of manmade structures designed to collect, convey, hold, divert or discharge stormwater, and includes stormwater sewers, canals, detention structures, and retention structures. (18) Improvements may include, but are not limited to, street pavements, curbs and gutters, sidewalks, alley pavements, walkway pavements, water mains, sanitary sewers, storm sewers or drains, street names, signs, landscaping, permanent reference monuments, permanent control points, or any other improvement required by a governing body. (19) Infrastructure means those manmade structures which serve the common needs of the population, such as: Sewage disposal systems; potable water systems; potable water wells serving a system; solid waste disposal sites or retention area; stormwater systems; utilities; piers; docks; wharves; breakwaters; bulkheads; seawalls; bulwarks; revetments; causeways; marinas; navigation channels; bridges; and roadways. (20) Land development code means the various types of regulations for the development of land within the jurisdiction of a unit of local government when combined into a single document. (21) Land development regulation means ordinances enacted by governing bodies for the regulation of any aspect of development and includes any local government zoning, rezoning, subdivision, building construction, or sign regulations or any other regulations controlling the development of land. (22) Land use means the development that has occurred on the land, the development that is proposed by a developer on the land, or the use that is permitted or permissible on the land under an adopted comprehensive plan or element or portion thereof, land development regulations, or a land development code, as the context may indicate. (23) Level of service means an indicator of the extent or degree of service provided by, or proposed to be provided by a facility based on and regulated to the operational characteristics of the facility. Level of service shall indicate the capacity per unit of demand for each public facility. (24) Local comprehensive plan means any or all local comprehensive plans or elements or portions thereof prepared, adopted, or amended pursuant to the Local Government Comprehensive Planning and Land Development Regulation Act. (25) Neighborhood park means a park which serves the population of a neighborhood and is generally accessible by bicycle or pedestrian ways. (26) Park means a community, or regional park. (27) Planning Act means the Local Government Comprehensive Planning and Land Development Regulation Act, Sections 163.3161 et seq., Florida Statutes. (28) Plat means a map or delineated representation of the subdivision of lands, being a complete exact representation of the subdivision and other information in compliance with the requirement of all applicable sections of this chapter and of any local ordinances, and may include the terms "replat," "amended plat," or "revised plat." (29) Potable water facilities means a system of structures designed to collect, treat, or distribute potable water, and includes water wells, treatment plants, reservoirs, and distribution mains. (30) Principal building means a building which is occupied by, devoted to, a principal use or an addition to an existing principal building which is larger than the original existing building. In determining whether a building is of primary importance, the use of the entire parcel shall be considered. There may be more than one (1) principal building on a parcel. (31) Principal use means the primary or main use of a parcel of land as distinguished from any accessory use. There may be more than one (1) principal or main use on a parcel of land. (32) Private recreation sites means sites owned by private, commercial or non-profit entities available to the public for purposes of recreational use. (33) Public facilities means major capital improvements, including, but not limited to, transportation, sanitary, solid waste, drainage, potable water, educational, parks and recreational, and health systems and facilities. (34) Public recreation sites means sites owned or leased on a long-term basis by a federal, state, regional or local government agency for purposes of recreational use. (35) Public utility includes any public or private utility, such as, but not limited to, storm drainage, sanitary sewers, electric power, water service, gas service, or telephone line, whether underground or overhead. (36) Recreation means a local land use plan which has previously been certified by the Broward County Planning Council, but because of amendments, decertification, or amendment to the Broward County Land Use Plan, is no longer in conformity, and must be recertified by the Broward County Planning Council as being in substantial conformity with the Broward County Land Use Plan. (37) Recreational facility means a component of a recreation site used by the public such as a trial, court, athletic field or swimming pool. (38) Regional roadway network means the roads contained within the Broward County Metropolitan Planning Organization's adopted Year 2010 Highway Network, except for those roads functionally classified as city collector roads. (39) Resident population means inhabitants counted in the same manner utilized by the United States Bureau of the Census, in the category of total population. Resident population does not include seasonal population. (40) Sanitary sewer facilities means structures or systems designed for the collection, transmission, treatment, or disposal of sewage and includes trunk mains, interceptors, treatment plants and disposal systems. (41) Seasonal population means part-time inhabitants who utilize, or may be expected to utilize, public facilities or services, but are not residents. Seasonal population shall include tourists, migrant farmworkers, and other short-term and long-term visitors. (42) Services means the program and employees determined necessary by local government to provide adequate operation and maintenance of public facilities and infrastructure as well as those educational, health care, social and other programs necessary to support the programs, public facilities, and infrastructure set out in the local plan or required by local, state, or federal law. (43) Solid waste means sludge from a waste treatment works, water supply treatment plant, or air pollution control facility or garbage, rubbish, refuse, or other discarded material, including solid, liquified, semisolid, or contained gaseous material resulting from domestic, industrial, commercial, mining, agricultural, or governmental operations. (44) Solid waste facilities means structures or systems designed for the collection, processing or disposal of solid wastes, including hazardous wastes, and includes transfer stations, processing plants, recycling plants, and disposal systems. (45) State Comprehensive Plan means the goals and policies contained within the state comprehensive plan, Section 187.201, F.S. (46) State land planning agency means the agency or department designated as the state land planning agency by the State of Florida. (47) Structure means anything constructed, installed or portable, the use of which requires a location on a parcel of land. It includes a movable structure while it is located on land which can be used for housing, business, commercial, agricultural, or office purposes either temporarily or permanently. "Structure" also includes fences, billboards, swimming pools, poles, pipelines, transmission lines, tracks, and advertising signs. (48) Subdivision means the platting or real property into two (2) or more lots, parcels, tracts, tiers, blocks, sites, units, or any other division of land; and includes establishment of new streets and alleys, additions, and resubdivisions; and, when appropriate to the context, relates to the process of subdividing or to the lands or area subdivided. (49) Substantial conformity refers to the Broward County Charter requirements contained in Article VI, Section 6.05 D and E that local governmental future land use plans shall be materially and pertinently compatible with and further the Broward County Land Use Plan in order to be certified or recertified. (50) Vested rights means rights which have so completely and definitely accrued to or settled in a person, which is right and equitable that government should recognize and protect, as being lawful in themselves, and settled according to then current law. (c) Determining consistency with the city/county comprehensive plan. If a development proposal is found to meet all the requirements of chapter 13, City of Coconut Creek Code of Ordinances entitled "Land Development Code," it shall be presumed to be consistent with the comprehensive plan in all respects except for compliance with the concurrency requirement. The land development code shall be amended from time to time to implement the effective comprehensive plan. The director of sustainable development, other public official or any citizen may, however, question the consistency of a development proposal with the comprehensive plan. If a question of consistency is raised, the director of sustainable development, with a technical evaluation from the director of utilities and engineering, and/or finance and administrative services director, shall make a determination of consistency or inconsistency and support that determination with written findings. If an appeal is made of findings, the city manager may review the determination and render a decision. An appeal after the city manager shall be in accordance with section 13-34, "Administrative appeals," of the City of Coconut Creek Code of Ordinances. (d) Development subject to adequacy determination. (1) For plats or replats, or for site plans or building permits where the property is unplatted or was platted, with plat approval received before March 20, 1979, all development of previously vacant land except that specified in subsection (3) below, shall be subject to adequacy determination unless a site plan has been approved prior to November 1, 1989 and development activity has occurred within the plat or replat area. (2) For plats or replats, or for site plans or building permits in Coconut Creek where the property is unplatted or was platted, with plat approval received before March 20, 1989, all development of previously improved lands shall be subject to an adequacy determination for the additional capacity that equal the difference between the capacity to be generated or consumed by the development specified in the proposed note on the plat and the capacity generated or consumed by the existing development. Existing development shall be construed to include previous development demolished no earlier than eighteen (18) months previous to the date the final plat is submitted, or the application for a site plan or building permit approval is submitted. (3) For a replat, or an amendment to a note on a plat, or a requirement to place a note on a plat, where property was platted after March 20, 1979, an adequacy determination shall be required for those additional capacities that equal the difference between the previous plat and the replat; or the previous note in the proposed amendment to the note; or the development approved by the county commission at the time of plat approval and the proposed note to be placed on the plat. (4) All plats approved after October 1, 1989 by the Broward County Commission and all development permits (i.e., site plans) approved after November 1, 1989 by the City of Coconut Creek must undergo adequacy determination of concurrency. (e) Measurement of capacities. (1) Water and wastewater. Measurement of water and wastewater facilities will be based on design capacities and service flows. Usage and discharge will be based on adopted level of service standards. These levels may be amended after consideration and substantiation of engineering studies and/or amendment to the Coconut Creek Comprehensive Plan. (2) Roadways. The procedure for the initial measuring of highway capacities is the Florida DOT Table of Generalized Daily level-of-Service Maximum Volumes made available to local government for use from January 1989 through December 1990. Future capacities standards will be issued by FDOT as necessary. The measurement of capacity may also be determined by substantiation in the form of engineering studies or other data. Traffic analysis techniques must be technically sound and justifiable as determined by the Broward County Office of Planning and city engineer. Alterations to capacity on the State Highway Network shall require the opportunity for FDOT review. Measurement of county and state roads shall be in accordance with the development review requirements (section 5-182) of the Broward County Land Development Code. Any developments that are determined to be within or create a compact deferral area shall be reviewed in conjunction with Broward County Office of Planning and any other affected agencies to determine if an action plan can resolve the capacity deficiencies. (3) Drainage. Measurement of drainage facilities will be based on the water management district basin design standards. Variations may exist for specific parcels but the overall effect of an areas drainage system must meet established water management practices criteria. (4) Solid waste. Measurement of solid waste shall be based on assumed generation rates and the design capacity of the landfill. (5) Recreation. Measurement shall be based on net acreage of land that qualifies as fulfilling the public recreation lands requirement of section 13-267 of the Coconut Creek Code of Ordinances. Ten (10) percent of county-owned regional parks and fifteen-percent of private golf courses may be counted towards the local parks requirement. (f) Maintaining level of service standards. (1) Levels of service must be maintained. a. No development activity may be approved unless it meets the following requirements designed to insure that certain public services are available at prescribed levels of service concurrent with the impacts of the development. b. Notwithstanding the foregoing, the prescribed levels of service may be degraded during construction of new facilities in a specific area if upon completion of the new facilities the prescribed levels of service will be met. (2) Determination of available capacity. For purposes of these regulations the available capacity of a facility shall be determined by: a. Adding together: 1. the total design capacity of existing facilities operating at the required level of service; and 2. the total design capacity of new facilities that will come available concurrent with the impact of the development. The capacity of new facilities may be counted only if one (1) or more of the following is shown: i. The necessary facilities are in place at the time a plat approval is issued, or a plat approval is issued subject to the condition that the necessary facilities will be in place when the impacts of development occur. ii. Construction of the new facilities is under way at the time of application. iii. The new facilities are the subject of a binding executed contract for the construction of the facilities to be constructed within a period of time as stipulated in the contract or the provision of services at the time the development permit is issued. iv. The new facilities have been included in the city/county capital improvement program annual budget. v. The new facilities are guaranteed at a specific time in an enforceable development agreement. An enforceable development agreement may include, but is not limited to, development agreements pursuant to Section 163.3220, Florida Statutes, or an agreement or development order pursuant to Chapter 380, Florida Statutes. Such facilities must be consistent with the capital improvements element of the city/county comprehensive plan and approved by the city/county engineer. vi. The developer has contributed funds to the city/county necessary to provide new facilities consistent with the capital improvements element of the city/county comprehensive plan. Commitment that the facilities will be built must be evidenced by an appropriate budget amendment and appropriation by the city/county or other governmental entity. vii. The proposed development does not place any trips on the over capacity roadway link. viii. There is an approved action plan to accommodate the traffic impact of the development. ix. The subject area has been determined to be a special transportation area (STA) relating to roadway concurrency issues. x. The development is authorized by an approved development of regional impact (DRI) development order. xi. The proposed development is found to have vested rights with regard to any effected roadway segments or infrastructure capacity reservations. xii. The proposed development is one (1) single-family or duplex dwellings on a lot, or parcel of record prior to March 1, 1989 and the lot or parcel is in an infill area. xiii. The proposed development is a government facility which the Coconut Creek City commission finds is essential to the health or safety of persons residing in or using previously approved or existing development. xiv. This determination may not be satisfied by the transfer of committed capacity from a previously approved plat or DRI to another parcel of land not included within the previous plat or DRI. xv. The necessary facilities are provided by any of the aforementioned methods (paragraphs i. through xiv.) for the approval of new development orders for lands which are already platted or the subsequent approval of development orders after new plats are approved. b. Subtracting from that number the sum of: 1. The design demand for the service created by existing development; and 2. The new design demand for the service (by phase or otherwise) that will be created concurrent with the impacts of the proposed development by the anticipated completion of other presently approved developments. (g) Burden of showing compliance on developer. The burden of showing compliance with these levels of service requirements shall be upon the developer. In order to be approvable, applications for development approval shall provide sufficient and verifiable information showing compliance with these standards. The department of sustainable development shall supply concurrency management forms to be completed by the developer. (h) Concurrency monitoring system. (1) Responsibility. The director of sustainable development, through his duties and authority of chairman of the development review committee, shall be responsible for monitoring development activity to ensure the development is consistent with the City of Coconut Creek Comprehensive Plan. A concurrency monitoring system is instituted to verify that public facilities and services will be available at adopted levels of service concurrent with the impacts of the development on those prescribed facility or service standards. (2) Development review committee. Applications shall be submitted for all development permits to the department of sustainable development and development review committee (DRC) as noted in sections 13-18 through 13-36. Processing shall be in accordance with regularly scheduled meetings of the DRC, planning and zoning board and city commission. The department of sustainable development shall act as the monitoring entity of the city's comprehensive plan. (3) Required information. At every stage of the development process (including but not limited to development of regional impact applications for development approval, land use plan amendments, rezonings, plats, minor plat resurveys, site plans, final engineering, and building permits) the developer shall provide the required information of their project to the appropriate city department for review and verification. All concurrency monitoring forms shall be forwarded to and collated by the department of sustainable development for determination of comprehensive plan compliance. The department of sustainable development shall provide to the developer a comprehensive plan concurrency monitoring system, including a matrix of required submittals based on the specific chronologic stage of the development in process and the subject level of service standard, a glossary of concurrency related terminology, a standard concurrency monitoring form and other material as may be amended from time to time to verify and monitor concurrency. (4) Concurrency rights and effective period. Compliance will be calculated and capacity reserved at time of final action of an approved site plan or enforceable developers agreement for those concurrency matters within the authority of the City of Coconut Creek. Applications for development approval shall be chronologically logged to determine rights to available capacity. The concurrency time limit for plats after October 1, 1989 will be five (5) years for water, sewer, roadways, drainage, and solid waste. Developers agreements as described in F.S. § 163.3220 shall offer a valid concurrency period for five (5) years or as modified by the "Florida Local Government Development Agreement Act." Site plans or master plans must be submitted for approved plats within two (2) years of plat approval and the effective time limit for concurrency determinations for site plans will be two (2) years. An extension of one (1) year may be issued by administrative approval. At each annual renewal of public performance bonds, the city shall make a determination if the bonds shall be drawn upon for construction. Recreation concurrency shall be in effect forever. Building and engineering permits will have a concurrency time limit of one hundred eighty (180) days with renewals of one hundred eighty (180) days as long as construction and inspections continues. (5) Infrastructure construction. If infrastructure is necessary to meet adopted levels of service, the developer must complete construction and issue performance bonds to insure completion of work within the concurrency time limit or risk forfeiture of favorable concurrency status. If a developer in the area wishes to complete off-site infrastructure construction that may or may not be part of other effective developers agreements, he may do so in accordance with a new developers agreement that may entail reimbursable clauses for off-site work and facility oversizing to meet area needs. The original developer will be contacted concerning the potential of work being deleted from his developers agreement. It shall be determined by the city that modifying the original developers agreement is in the best interests of the city. In this case, the original developer must pay reasonable infrastructure costs to new developer under the terms of the original or modified developers agreement. (6) Development permit approval or disapproval. Development permits shall be processed to the furthest degree possible. If adequacy determinations of a project show unacceptable levels of service in any one of the necessary public facility or service standards, the project shall be tabled during final action of the development permit approval. If capacity conditions change at some time in the future, concurrency shall be rechecked to verify compliance with adopted levels of service. If compliance is found the development shall be rescheduled for final action. (7) Intergovernmental coordination. The department of sustainable development shall coordinate concurrency activities within and outside the city. The department of sustainable development, public works department, utilities and engineering department, finance and administrative services, police, and fire, shall act as liaisons depending on the specific level of service standard with the South Florida Regional Planning Council, Broward County and/or any other municipality or governmental entity to review technical issues of development approval.

(Ord. No. 163-89, § 1, 10-26-89; Ord. No. 2001-042, § 5, 2-28-02; Ord. No. 2024-012, § 2, 4-11-24)