Sec. 13-190. - Release procedure.
The procedure for release of the improvement bond shall be as follows: (1) Upon completion and acceptance of all improvements by the city engineer after final inspection, the developer shall submit to the city engineer record drawings and certified actual costs together with its request for release of the improvement bond. A registered engineer shall certify all actual costs. (2) Within thirty (30) working days of receipt of a request for release of an improvement bond meeting the requirements of subsection (1) above, the city engineer shall either: a. Approve the improvements in writing and notify the developer to deliver the twenty-five-percent maintenance bond. Upon receipt by city of the maintenance bond the city engineer shall release the improvement bond; or b. Inform the developer in writing of any discrepancies in the improvements related to the approved engineering drawings and related documents or any faults with the record drawings in which case the city engineer shall inform the developer in writing if the improvement bond must be extended due to incomplete and/or unapproved improvements or required record documentation and the time frame during which the improvements are to be completed. (3) If subsection (2)b. occurs, the developer shall make the necessary corrections and upon completion, request an inspection by the city engineer for verification that the corrections have been made and submit the corrected record drawings and or documents. Inspection for the performance bond release shall include but not be limited to visual inspection, operating valves and hydrants; lamping and/or television inspection of the drainage and television inspection of the sewer lines; start-up of pump station and other equipment; and other tests or reports as requested by the city engineer. Television inspection must be performed and approved by the city engineer on all gravity sewer mains prior to release of the performance bond after repairs have been conducted to correct deficiencies. (4) Upon approval of the improvement, a twenty-five-percent maintenance bond shall be submitted concurrently with the release of the performance bond. A bill of sale referencing the transfer of the facilities to the city shall be furnished prior to the release of the performance bond. (5) The twenty-five-percent maintenance bond shall stand against all insufficiencies, including, but not limited to, design, workmanship and materials included in the accepted improvements as shown on the record drawings and detailed specifications discovered within one (1) year of the date the work has been accepted by the city engineer, provided a minimum of ninety (90) percent of the certificates of occupancy for the buildings in the area covered by the bonded improvements have been issued or ninety (90) percent of the building floor area has been completed. If less than ninety (90) percent of the certificates of occupancy or building floor area have been completed at the end of the one-year maintenance period, then the maintenance period will extend for one (1) additional year or the completion of ninety (90) percent of the certificates of occupancy or building floor area, whichever occurs first. The developer shall request the city engineer to reinspect such improvements prior to the expiration date of the maintenance bond. Reinspection shall include, but not be limited to, visual inspection of the improvements, operation of valves, hydrants, pump station and other equipment; and other tests as requested by the city engineer. If reinspection shows deficiencies, the developer shall make necessary repair to correct such deficiencies as determined by the city engineer. The developer shall extend the maintenance bond until said deficiencies are corrected. If inspection is satisfactory to the city engineer as evidenced by a maintenance bond release report, the maintenance bond shall be released.
(Ord. No. 115-86, § 208.06, 7-10-86; Ord. No. 159-87, § 208.06, 6-11-87; Ord. No. 138-90, § 3, 1-10-91; Ord. No. 113-94, § 2, 3-10-94; Ord. No. 2004-032, § 1, 8-26-04)
Ask a question about Coconut Creek law
Corpus searches the Coconut Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.