§ 13-211 — General requirements
Code of Ordinances of the City of Coconut Creek, Florida (Codified through Ordinance No. 2026-016, enacted June 25, 2026. (Supp. No. 6)) · Coconut Creek Code of Ordinances § 13-211
Corpus is an independent public-information project, not the official City of Coconut Creek website. Stable reference: corpuslaw.us/code/7eaa694e-076a-463c-9eb8-23dcee326c1e
Sec. 13-211. - General requirements.
(a) All record drawings shall be prepared on twenty-four-inch by thirty-six-inch size sheets unless otherwise approved by the city engineer. The minimum allowable scale shall be one (1) inch for each fifty (50) feet. (b) The developer shall engage the engineer of record to prepare record drawings, as described in this division, which shall clearly indicate any deviations from the approved engineering drawings for all public and private improvements. Preliminary record drawing submittals shall consist of four (4) sets of prints submitted prior to placement of any and all surface course pavement. The final submittal which shall include paving record drawings, shall consist of four (4) sets of prints and one (1) mylar sepia set. All record drawing submittals shall be signed by the engineer of record. (c) Preliminary record drawings of all underground installations, consisting of four (4) sets of prints, shall be provided to the city engineer and his/her approval must be obtained prior to any and all limerock base course construction. If preliminary record drawings are approved by the city engineer, then limerock base course construction may commence, after notification of such approval. If the city engineer finds any or all of the work not constructed in accordance with city ordinances or the approved plan, then it shall be the responsibility of the developer to correct such work and provide new record drawings, as described below. Within ten (10) working days, the city engineer will either: (1) Accept the record drawings in writing; or (2) Inform the developer, in writing, of any discrepancies or any faults with the information shown on the record drawings. (d) The public improvement bond shall not be released until the city engineer has approved the final record drawings for the improvements. In addition, release of the bond shall be contingent upon receipt by the city engineer of a certificate in which the engineer of record certifies that the completed improvements are in compliance with the applicable city ordinances; will function as designed; and are installed in accordance with manufacturers' recommendations and approved plans. Such certificate shall also state that the engineer of record has witnessed all tests, i.e., pressure testing and bacteriological sampling for water distribution, infiltration, exfiltration, lamping and/or television inspection, equipment start-up operations for wastewater collection and density tests for backfills, subgrade and limerock, etc.; that such testing has been conducted in accordance with the appropriate standard and; that the system in question has passed such testing. (e) In phased projects the limit of the as-built information supplied must be clearly shown. (f) Upon completion of construction and prior to final inspection or commencement of any bonded maintenance period, the engineer of record shall furnish to the engineering division full print sets of the record drawing submitted. As-built information must be shown on the design drawings which were submitted for final engineering approval. The record drawing submitted shall also include approved detail drawings. All drawing sheets must clearly be marked "Record drawings." (g) Information must be clearly shown and shall include any deviations from the approved drawings including but not limited to line lengths, materials, invert and rim elevations, grades, additional structures, conflicts, cross sections, sizes, slopes, deleted structures, revised locations and the additional information necessary to clearly depict the as-built field conditions. (h) Information must clearly show that the facilities to be dedicated to the city for maintenance have been constructed within dedicated rights-of-way or easements as shown on the plat. If the facilities have been constructed outside of a dedicated right-of-way or easement, legal descriptions and sketches of additional easements must be submitted in recordable form for approval by the city attorney.
(Ord. No. 115-86, § 209.01, 7-10-86; Ord. No. 159-87, § 209.01, 6-11-87; Ord. No. 122-94, § 4, 5-26-94)
Ask a question about Coconut Creek law
Corpus searches the Coconut Creek sections it holds and shows the ones that match, with their citations. Free, no sign-in.
