Sec. 12-110. - Miscellaneous requirements.
(A) Bonds to ensure completion. If the landscaping requirements of this division have not been met at the time that a certificate of occupancy or a certificate of completion is requested, the Town, for good cause, may accept a cash bond or letter of credit of one hundred and ten (110) percent of the cost to ensure completion. (B) Irrigation system coverage. In all districts, pervious areas shall be provided with an automatic underground irrigation system, adequate to service the landscape areas, except when not required under the provisions of this division. All common open space or landscaped areas shall be provided with an underground irrigation system. All irrigation systems shall be designed to provide one hundred (100) percent coverage with one hundred (100) percent overlap. (C) Maintenance. The landowner shall be responsible for the maintenance of all landscaping, which shall be maintained in good condition so as to present a healthy, neat and orderly appearance and shall be kept free from refuse and debris. Maintenance shall include the replacement of all dead plant material. (D) Maintenance of right-of-way. The owner of real property shall at all times be responsible for the maintenance of the unpaved portion of the public right-of-way between the paved portion of the public right-of-way and the boundary of the owner's property. (E) Irrigation system verification. The irrigation system shall be in working condition prior to a certificate of occupancy or completion being issued. The system must be able to be turned on at the time of the final landscape inspection to ensure proper overlap is provided. No individual pump shall exceed twenty-five (25) horsepower. (F) As-built irrigation plan. An "as-built" landscape and irrigation document shall be submitted to the Town prior to the issuance of Certificate of Occupancy if changes were made between plans approval, installation and final sign off. A copy of the final plans, either "as-built" or approved plans, shall be delivered by the applicant to the homeowner, when applicable. The purpose of this provision is to help avoid damage to underground irrigation systems.
(Ord. No. 2010-020, § 2(Exh. A), 9-7-10; Ord. No. 2016-014, § 2(Exh. A), 7-27-16)
Ask a question about Davie law
Corpus searches the Davie sections it holds and shows the ones that match, with their citations. Free, no sign-in.