§ 6-32 — Vacant land parcel maintenance requirements
Code of Ordinances of the City of Davie, Florida (Codified through Ordinance No. O2026-016, enacted September 3, 2026 (Supp. No. 76)) · Davie Code of Ordinances § 6-32
Corpus is an independent public-information project, not the official City of Davie website. Stable reference: corpuslaw.us/code/1f43d33c-a3a3-4043-9bd5-62c94fbd6d96
Sec. 6-32. - Vacant land parcel maintenance requirements.
(a) The following maintenance requirements shall apply to a vacant property or vacant land parcel that is being prepared for development when a hiatus in construction or development shall occur that exceeds one hundred twenty (120) days and where the following conditions, individually or in combination, may be found to exist: (1) Any trees, shrubs or vegetation uprooted during clearing, excavation or development activities kept on the property shall be removed; (2) Trenches excavated for water and sewer pipes that remain unfilled shall be safely cordoned off or refilled; (3) Any conduit or pipes for water, sewer, and/or electrical repairs or installation deposited on the property which has not been installed and buried as part of such installation shall be removed; (4) Any asphalt or concrete debris from construction or excavation on the property shall be removed from the property; and, (5) Pre-construction materials kept or stored on the property shall be removed; (6) Open spaces or parks and recreational areas without structures on the property that have been designated for general public use are not considered vacant property for purposes of enforcing this section. (b) Ground cover shall be required to stabilize soil in vacant land parcels. (1) In addition to erosion control requirements found in the Town's Code and engineering best practice standards, a vacant land parcel that results from approved clearing, construction or demolition activity and which contains more than twenty-five hundred (2,500) square feet of unstabilized soil, as defined herein, shall within one hundred twenty (120) days of the cessation of construction or similar activities associated with any development order including but not limited to a site plan approval, building permit or special permit, be stabilized with bahia sod, native seed grass, or similarly approved ground cover, until such time that approved development or redevelopment of the parcel commences. The date of cessation of construction activities may be determined by the last occurrence of a documented inspection, issuance of any development order or the decision of the enforcing agency. (2) This requirement shall not apply to vacant public lands, medians, or rights-of-way, any vacant land parcels in the A-1 or AG zoning districts, or the M-1, M-2, or M-3 industrial zoning districts; for purposes of this section, "unstabilized soil" shall mean soil surfaces which are either devoid of vegetation or only sparsely vegetated with natural seed growth and subject to erosion. (3) Any sod, seed grasses or approved ground covers shall be properly maintained so as to promote a healthy appearance at all times up to the completion of approved development activities.
(Ord. No. 2010-9, § 2(6-15.10.1), 4-7-10)
Ask a question about Davie law
Corpus searches the Davie sections it holds and shows the ones that match, with their citations. Free, no sign-in.
