Sec. 86-136. - Application for NCF permit; review.

(a) In general. No NCF permit shall be issued unless a written application for a permit is submitted to the city in accordance with this article. (b) Information required. An application for an NCF permit shall be filed in the form and manner specified by the city (e.g., the city may require that any or all parts of such requests be filed in an electronic form of the city's choosing) and contain such information as may be required by the city, including, at a minimum, the following information, except where waived by the city as unnecessary: (1) The name and address of the applicant who is requesting the permit and written evidence that such applicant has legal authority to place, maintain, or remove the equipment or facilities covered by the requested permit in the public right-of-way and shall own and control all such equipment and facilities after completion of construction. (2) A description of the functions, dimensions, and proposed locations of all equipment and facilities covered by the requested permit. (3) The specific location, depth, and dimensions of all such equipment and facilities proposed to be installed in or removed from the right-of-way; including as applicable length and depth of each proposed new or replacement duct, conduit, or other underground facility; and the depth, width, and height of any utility pole or other above-grade facilities covered by the requested permit. (4) A description of the length of time that the applicant proposes to have the subject equipment and facilities located within the right-of-way. (5) A description of the manner in which the work covered by the requested permit is to be undertaken (i.e., proposed construction methods and techniques) and a proposed date for commencement of work and an estimate of the time required to complete all such work. (6) Identification and description of any utility or other distribution or transmission system to which any equipment or facility covered by the requested permit is to be connected or attached. (7) Maps (in such detail and form as may be specified by the city) which show: a. Public right-of-way in the area of the proposed construction; b. Locations of all existing equipment and facilities in the area of proposed construction; c. Where the proposal is for an above-grade installation of eight feet or more, the height of all existing above-grade equipment and facilities located within the public right-of-way up to a distance of 250 feet from the proposed installation; d. All equipment and facilities to be installed or removed; and e. The routes of all transmission and distribution lines to be installed or removed and the sites of all other equipment and facilities to be installed or removed in the public right-of-way. (8) As-built maps (in such detail and form as may be specified by the city) which show the locations of all the applicant's existing equipment and facilities in the public right-of-way. (9) Construction maps (in such detail and form as may be specified by the city) which show the locations of all new equipment and facilities in the city which the applicant plans to place in the public right-of-way in the next 12 months or such other time period as may be specified by the city. (10) If the applicant is proposing an underground installation within new ducts or conduits to be constructed within the right-of-way, a statement that the applicant has verified that it is not feasible to locate its facilities in existing ducts and conduits; and a description of the excess space that may be available for use by other utilities after installation of the new facilities. (11) All money for which payment is currently due to the city, without offset or dispute, including permit application fees. (c) Additional information. The city may require the applicant to provide such additional information as the city deems necessary to complete its review of a requested permit, including the following: (1) A videotape (or other visual record in a format of the city's choosing) which shows in such form and detail as may be required by the city the condition of the right-of-way in the area to be affected by the proposed work; and (2) A traffic control plan for vehicular and pedestrian traffic in the area to be affected by the proposed work; and (3) A written estimate of the cost of restoring any city facilities that may be damaged by the work proposed, certified by such qualified persons as a civil engineer licensed in Florida or a Florida licensed contractor; and (4) Proof of insurance.

(Ord. No. 01-73, § 1, 2-21-2001; Ord. No. 18-17, § 1, 1-3-2018)