Sec. 14.5-155. - Tests and performance monitoring.
(a) System completion test. Not later than 30 days after any new or rebuilt portion of the system is made available for service to subscribers, the grantee shall conduct technical performance tests to demonstrate full compliance with all technical standards contained in this article, the franchise, and the technical standards and guidelines of the FCC. (b) Report. Such tests shall be performed by a qualified technician. A report shall be submitted to the city, describing test results, instrumentation, calibration and test procedures. (c) Test points. System monitoring test points shall be established, and such periodic tests shall be made at the test points as shall be required by the FCC. (d) On-going performance tests. In addition to the performance test reports required herein, a copy of any performance test reports required by the FCC shall be submitted to the city within 30 days of a request for such copy. (e) City requested tests. If the city has a reasonable basis to believe that a grantee is not complying with one or more performance standards specified in rules or regulations promulgated by the FCC, it may provide notice of such noncompliance to the grantee. The grantee shall have 30 days after such notice to demonstrate that it is complying with applicable FCC standards. Thereafter, the city may conduct proof-of-performance tests to determine if the grantee is in compliance with FCC performance standards. The grantee shall have the right to conduct such proof-of-performance tests jointly with the city; provided, however, that the grantee's participation shall not unreasonably delay the testing. If the city's proof-of-performance testing demonstrates that the grantee does not comply with any performance standard, the grantee shall bring the cable system into compliance with such standards within 30 days. (f) Consultants to the city. The city shall have the right to employ qualified consultants if necessary or desirable to assist in the review, evaluation, and monitoring of the grantee's performance under this section or any other section of this article or the franchise.
(Ord. No. 040116, § 2, 7-26-04)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.