§ 27-121 — Deferred payment for residential water service
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 27-121
Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/edbd8fcd-5f00-4376-9016-78feb5f07af0
Sec. 27-121. - Deferred payment for residential water service.
Notwithstanding the provisions of sections 27-126.1 and 27-129, entitled respectively "(Water Meter) Installation Charges," and "Water Flow-based Connection Charges," if the criteria listed below are met, each applicant for residential water meter installation and/or water service shall have the option to defer payment of water meter installation charges, water transmission and distribution connection charges and water treatment plant connection charges during construction for a period of not more than six (6) months from the date of application. If payment is deferred, the city will install one (1) five-eighths-inch water meter for each single-family dwelling or residential building with multiple-dwelling units which ultimately will be individually metered. Only one (1) water meter will be installed at each building. The utility shall determine the meter location for residential buildings with multiple dwelling units. This section does not apply to applications for master water meters. (1) Criteria for deferring payment: a. Applicant must request a five-eighths-inch residential meter for a single-family dwelling or a residential building with multiple dwelling units. b. All dwelling units to be served by the residential meter must be unoccupied at time of application and applicant must agree that no dwelling unit shall be occupied until all deferred charges have been paid. c. Inspection for permanent electrical service must not have been made. d. Permanent electric service must not have been installed. e. Applicant must present service location addresses for all buildings at the time of application. f. Application must be made pursuant to procedures established by the city and any required deposit must be paid. g. Applicant must request payment deferral. (2) Payment of deferred fees. No permanent electric power will be provided by the city to any single-family dwelling or to any unit in a residential building with multiple-dwelling units until all water meter installation charges, water transmission and distribution connection charges and water treatment plant connection charges have been paid. (3) Nonpayment. All fees and charges must be paid within six (6) months of the meter application date. If the fees and charges are not paid within such period, the water meter will be removed, a water meter installation and removal charge as set out in the schedule in Appendix A will be assessed and the account will be closed. Service shall not be restored at such location until all applicable fees and charges have been paid.
(Ord. No. 3428, § 2, 4-4-88; Ord. No. 3740, § 2, 9-30-91; Ord. No. 3754, § 80, 1-27-92)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
