§ 27-129 — Water connection charges
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 27-129
Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/1e2d3101-ea6b-4026-a911-f652831f1b80
Sec. 27-129. - Water connection charges.
(a) Identification of water connection charges. The water connection charges specified in this section shall consist of a transmission and distribution connection charge and a water treatment plant connection charge. The water connection charge shall be assessed prior to the meter installation. The following categories of applicants shall pay the minimum connection charge according to the schedule set out in Appendix A: single family connections without fire sprinkler system with three-quarters inch or smaller meter; single family residential connections with fire sprinkler system with one inch or smaller water meter; and/or nonresidential connections with an estimated annual average daily flow (ADF) of less than or equal to 280 gallons per day (GPD). All other applicants shall pay the flow based connection charges according to the schedule set out in Appendix A. Each applicant for water service shall pay to the city, prior to services being rendered, the applicable water connection charges in accordance with the schedule set out in Appendix A. The connection charges shall not be applicable to any property that has been duly designated by the general manager for utilities or the general manager's designee, as having had the city's relevant water connection costs recovered previously for such property, provided such property had an active water account with city within the past ten years from the date of application. (b) For water meters larger than one inches. The applicant shall provide the city a detailed estimate of the expected ultimate demand in gallons per day annual average daily flow (GPD-ADF) to be served by the water meter to be installed. It is the applicant's responsibility to coordinate the preparation of this estimate with the city so as to ensure the provision of sufficient detail and proper documentation of estimated demand. Such detail shall include an ultimate site plan for all properties served by the subject water meters. The city reserves the right to perform its own estimate of service demand, which shall take precedence for the purpose of calculating the charge. (c) For nonresidential water meters one inch or smaller. The applicant shall provide the city an ultimate site plan or other documentation to substantiate building size for all properties served by the subject water meter(s). The expected ultimate demand in gallons per day annual average daily flow (GPD-ADF) will be determined by the city based on the site plan and the anticipated use of the facilities being served by the subject meter(s). Alternatively, the applicant may provide the city a detailed estimate of the expected ultimate demand. However, the city reserves the right to perform its own estimate of expected service demand, which shall take precedence for the purpose of calculating the charge. (d) Meter sizing. The city reserves the right to select the most appropriate sized meter to best serve the applicant. (e) Connection charge adjustment. The purpose of this subsection is to provide for adjustment of water connection charges when major and significant changes of water consumption patterns associated with an existing service occur. The purpose of this subsection is not to adjust for insignificant errors in estimates of annual average daily flow, flow changes due to weather variations, or other normal changes in consumptive use of water. The city may use building permits, water consumption records, and other reasonable information to enforce the provisions of this subsection. After meters are installed and whether or not any water connection charge were assessed at the time of installation, an adjustment in the water connection charges paid or a new charge may be assessed if one or more of the following conditions occur: (1) Additional water meter installed. If an additional water meter is installed, the amount charged the applicant shall be calculated according to the schedule set forth in Appendix A. (2) Actual demand exceeds estimated demand or change in use of facility. If the actual annual average daily flow (ADF) measured over a 12-month period should exceed the estimated demand on which a previous connection charge payment was based or if there is a change in use of the facility that is expected to result in a demand greater than the estimated demand on which a previous connection charge payment was based, the city reserves the right to review and revise the previous demand estimate and to assess an additional charge for the increased demand calculated according to the schedule set forth in Appendix A. (3) Actual demand less than estimated. If within the 24-month period following meter installation, the applicant can demonstrate to the city's satisfaction that the applicant's average daily flow (ADF) has been and will continue to be less than the estimate, which estimate was used as a basis for assessing the connection charges, the applicant may request a refund. The request shall include the applicant's copy of the original service demand estimate which shall be annotated and accompanied by sufficient explanation of the lower than estimated demand. If the city approves the request, the city shall pay a refund to the applicant based on the difference between the original service demand estimate and the new service demand estimate, multiplied by the current charge(s) for that demand calculated according to the schedule set forth in Appendix A. (4) Construction of new structures or facilities. If new structures or facilities are constructed causing additional demand for water services and these facilities were not included in or properly described in the applicant's original detailed service demand estimate and/or site plan of service demand, then additional water connection charges shall be assessed by the city based on the estimated additional demand calculated according to the schedule set forth in Appendix A. (f) Irrigation meters. Connections used solely for irrigation purposes are exempt from paying water connection charges.
(Code 1960, § 28-37.2; Ord. No. 3565, § 2, 9-18-89; Ord. No. 3697, § 9, 2-18-91; Ord. No. 3740, § 4, 9-30-91; Ord. No. 3754, § 80, 1-27-92; Ord. No. 3962, § 2, 2-28-94; Ord. No. 150246, § 2, 9-17-15; Ord. No. 211448, § 2, 9-22-22)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
