§ 27-28 — Electric system fuel and purchased power adjustment
Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 27-28
Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/6b6e19ae-e161-45ff-b0b0-ffc0e27f1021
Sec. 27-28. - Electric system fuel and purchased power adjustment.
(a) An electric system fuel and purchased power adjustment shall be added to the base rate for electric service to all customer rate classifications as specified in the schedule set out in Appendix A. The electric system fuel and purchased power adjustment shall be computed to the nearest whole mill ($0.001) per kilowatt hour (kWh) of energy consumed in accordance with the formula specified in subsection (c) of this section. The purposes of the electric system fuel and purchased power adjustment calculation are to allocate the appropriate amount of system fuel cost(s) associated with the electric service to each kWh sold; to specify the amount of such costs that have resulted from increases in the cost of fuel subsequent to October 1, 1973; and, to segregate the remaining fuel recovery that is exempt from utility tax and surcharge. (b) The electric system fuel and purchased power adjustment for each billing month shall be based on fuel cost and energy sales which are estimated by the general manager for utilities or his/her designee. When applicable, a fuel levelization fund amount and a true-up correction factor, which shall be based on the actual system performance in the second month preceding the billing month, as certified by independent certified public accountants, shall be added to the electric system fuel and purchased power adjustment before applying to customer(s) bills. (c) The following formula shall be used in computing the monthly electric system fuel and purchased power adjustment: (1) Projected electric system fuel and purchased power expense for billing month 1 _____ (2) Projected wholesale fuel revenue for billing month 1 _____ (3) Projected other fuel revenue for billing month 1 _____ (4) Projected fuel costs to be recovered by retail sales for billing month _____ Item 1 - Item 2 - Item 3 (5) "True-up" calculation from second month preceding the billing month _____ a. Native load fuel expense for sales from the second preceding month _____ 1. System generation fuel 3 _____ 2. Purchases from interchange and purchased power agreements 4 _____ 3. Fuel portion of interchange sales 4 _____ 4. Native load fuel expense _____ Item 5a1 + Item 5a2 - Item 5a3 b. Total fuel revenue from the second preceding month _____ 1. Electric system fuel and purchased power adjustment revenue 2 _____ 2. Embedded fuel 2, 6 _____ 3. Wholesale fuel revenue 2 _____ 4. Total fuel revenue _____ Item 5b1 + Item 5b2 + Item 5b3 c. True-up from second preceding month _____ d. Fuel levelization amount from second preceding month _____ e. True-up for billing month _____ Item 5a4 - Item 5b4 + Item 5c + Item 5d (6) Calculation of electric system fuel and purchased power adjustment for billing month _____ a. Projected retail sales MWh _____ b. Projected fuel costs to be recovered by retail sales _____ 1. Projected fuel costs 1 _____ Item 4 2. True-up for billing month _____ Item 5e 3. Embedded fuel 6 projected for billing month _____ 4. Fuel levelization amount used or added for billing month 5 _____ 5. Total fuel adjustment revenue requirement for retail sales _____ Item 6b1 + Item 6b2 - Item 6b3 + Item 6b4 c. Fuel adjustment for billing month (mills, $/MWh) _____ Item 6b5/Item 6a Footnotes: 1 Electric system fuel and purchased power adjustment expenses, costs, retail sales, and wholesale sales, and other revenues are to be estimated for the billing month by the general manager for utilities or his/her designee. For the purposes of this section, wholesale sales are total requirements sales for resale that are not interchange sales. 2 Fuel and purchased power adjustment revenues, other fuel revenues, retail, and/or wholesale sales from the second month preceding the billing month shall be actual data as billed to the city's electric customers. 3 System fuel costs for the second month preceding the billing month shall be based on actual system fuel costs. 4 The fuel cost portion of interchange sales for the second month preceding the billing month shall be the cost of fuel applicable to such sales as determined by the general manager for utilities or his/her designee. The fuel cost portion of interchange purchases for the second month preceding the billing month is determined from invoice(s) received for such purchases. In the case of interchange purchases, the entire cost including transmission charges, if any, will be included in the fuel cost for such transactions. 5 The fuel levelization fund balance may be used each month to levelize the monthly electric system fuel and purchased power adjustment. At any given point in time, the fuel levelization fund balance shall be no greater than ten percent of the annual fuel budget and no less than negative five percent of the annual fuel budget. In the event that the fuel levelization fund balance varies from the above-identified range, the general manager or his/her delegate will present an information item to the city commission as soon as practicable. 6 Six and one-half mills ($0.0065) per kWh was the cost of fuel, imbedded within base rates for retail service, on October 1, 1973, making it subject to taxation.
(Code 1960, § 28-3.5; Ord. No. 3112, § 1, 2-25-85; Ord. No. 3429, § 1, 4-4-88; Ord. No. 3453, § 1, 8-8-88; Ord. No. 3640, § 1, 7-16-90; Ord. No. 3750, § 1, 11-18-91; Ord. No. 3754, § 80, 1-27-92; Ord. No. 950731, § 1, 10-9-95; Ord. No. 130582, § 2, 8-21-14)
Ask a question about Gainesville law
Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.
