For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 30-8.21 — Avoiding loss or degradation of wetlands

Code of Ordinances, City of Gainesville, Florida (Supp. No. 64, Update 1: codified through Ordinance No. 2024-740, adopted November 6, 2025) · Gainesville City Code § 30-8.21

Corpus is an independent public-information project, not the official City of Gainesville website. Stable reference: corpuslaw.us/code/60e8d7dc-8c5e-41e8-8c2e-79a029245d14

Sec. 30-8.21. - Avoiding loss or degradation of wetlands.

Wetlands within and around the City of Gainesville provide environmental benefits such as water quality improvement, floodplain and erosion control, groundwater recharge and wildlife habitat, especially for species listed as endangered, threatened or of special concern by state and federal agencies, plus recreational, aesthetic and educational opportunities for people. These functions may be provided regardless of wetland size. Wetlands damaged or degraded shall either be restored to their function and condition prior to such damage, or mitigated pursuant to the mitigation requirements in the Comprehensive Plan, this Code, and in accordance with appropriate water management district standards. A. Purpose and intent. The purpose of this section is to avoid loss or degradation of wetland functions, to minimize unavoidable degradation or loss of wetland functions and to require mitigation that fully offsets any unavoidable loss or degradation of wetland functions. In addition, it is the purpose of this section to ensure that development activities that cause the unavoidable degradation or loss of wetland function are clearly in the public interest and fully offset any degradation or loss of wetland functions through sustainable mitigation. This section should contribute to the restoration of wetlands functions in the city. B. Applicability. Except as provided below this section shall be applicable to all wetlands within the City of Gainesville. This section shall not apply to the maintenance of permitted stormwater systems. C. Delineation. Wetlands shall be delineated pursuant to Rule 62-340.300, Florida Administrative Code. Delineations performed by the State of Florida pursuant to Rule 62-340.300, Florida Administrative Code, shall be binding on the city for the purposes of this section. D. Avoidance through minimization. Avoidance of loss of wetland function and wetland habitat is of the highest priority. The owner shall avoid loss of wetland function and wetland habitat by implementing practicable design alternatives to minimize adverse impacts to wetlands, except as permitted in this section. The adverse impacts remaining after practicable design modifications have been made shall be offset by mitigation as provided herein. A development activity cannot cause a net adverse impact on wetland functions, wetland habitat, or surface water functions, if such activity is not offset by mitigation. Avoidance through practicable design modifications is not required when the ecological value of the function provided by the area of wetland is low and the proposed mitigation will provide greater long-term ecological value than the area of wetland to be affected. E. Conditions for the issuance of a development permit for property upon which wetlands are located. The city manager or designee or appropriate reviewing board shall review all permit applications based on the conditions set forth below. No development of property containing wetlands shall be permitted unless the owner provides reasonable assurance that the activity: 1. Will not adversely impact the value of wetland functions provided to fish and wildlife and listed species; 2. Will not cause adverse secondary or cumulative impacts to water and wetland resources; 3. Will be capable, based on generally accepted engineering and scientific principles, of being performed and of functioning as proposed; 4. Will be conducted by an entity with the sufficient financial, legal and administrative capability to ensure that the activity will be undertaken in accordance with the terms and conditions of the permit, if issued; 5. Will comply with criteria for buffer zones set forth herein; 6. Is consistent with the owner's stormwater management permit, if required; and 7. Is clearly in the public interest based on a balancing of the following criteria: a. Whether the development activity requires location in, on, or over wetlands or surface waters in order to fulfill its basic function; b. The effect of the development activity on the public health, safety, or welfare or the property of others; c. The effect of the development activity on fish, wildlife and native plant communities; d. The effect of the development activity on recreation, open space and aesthetic values; e. The effect of the development activity on significant historical and archaeological resources; f. Whether the development activity will be of a temporary or permanent nature; g. The current condition and relative value of wetland functions being performed by areas affected by the proposed activity; h. The type, extent, and geographic location of any mitigation proposed; i. The extent to which the development furthers the goals of the Comprehensive Plan, and the proximity of the development to existing infrastructure. F. Mitigation. This section applies to development activities in wetlands, which cannot be avoided or minimized, as determined by the criteria stated herein. Mitigation means an action or series of actions to offset the adverse impacts that would otherwise cause a regulated activity to fail to meet the criteria set forth herein. 1. Types of mitigation; mitigation ratios. Mitigation consists of creation, preservation, enhancement, restoration, or a combination thereof in accordance with the ratios and preferences set forth in Chapter 62-345, Florida Administrative Code (Uniform Mitigation Assessment Method). a. Preservation means the protection of wetlands, other surface waters or uplands from adverse impacts by placing a conservation easement or other comparable land use restriction over the property, in favor of the governmental entity with the appropriate jurisdiction. b. Enhancement is an improvement in wetland function. c. Restoration means converting existing wetlands, surface waters or uplands from a disturbed or altered condition to a previously existing natural condition to the maximum extent possible. d. Creation means the establishment of new wetlands or surface waters by conversion of other landforms. Wetland creation is the least acceptable mitigation alternative and shall be considered only when preservation, restoration or enhancement within the sub-basin, basin or adjacent basin are infeasible at the ratios provided and when the owner can demonstrate that the proper hydrology and geology exist to make a created wetland sustainable. 2. Location of mitigation. Any mitigation required pursuant to this section shall be performed within the basins and sub-basins described below, and may be performed on-site. These basins and sub-basins shall be specifically delineated on a map in the data and analysis section of the conservation, open space and groundwater recharge element of the Comprehensive Plan. Sub-basins include but are not limited to those drainage units within basins described below and as determined by the city manager or designee. a. Newnans Lake Basin. This basin generally includes the areas east of the Hogtown Creek watershed and the Blues Creek watershed and north and east of the Paynes Prairie watershed. It includes Hatchet Creek, Little Hatchet Creek, Gum Root Swamp, Sunnyland Creek, Lake Forest Creek and the Newnans Lake watershed. b. Paynes Prairie Basin. The Paynes Prairie Basin generally consists of the area west and south of the Newnans Lake Basin and south of the Hogtown Creek watershed flowing to Paynes Prairie and Alachua Sink. The Paynes Prairie Basin includes Sweetwater Branch, Rosewood Lateral, Tumblin Creek, Bivans Arm, Extension Ditch, Calf Pond Creek, Alachua Sink and the Paynes Prairie watershed. c. Hogtown Creek Basin. The Hogtown Creek basin generally includes the watershed for Hogtown Creek and Haile Sink and includes the depression basins that are adjacent to the west side of the watershed and within the Gainesville Community Basin. This Basin includes Hogtown Creek, Rattle Snake Creek, Springstead Creek, Pine Forest Creek, Ridge View Creek, Glenn Springs Creek, Possum Creek, Three Lakes Creek, Millhopper Creek, Monterey Creek, Royal Park Creek, Beville Creek, and the Lake Alice watershed, Lake Kanapaha, Rutledge Drain, Liberty Drain, Unnamed Branch and Unnamed Drain. d. Blues Creek Basin. The Blues Creek Basin generally includes the area northwest of the Hogtown Creek Basin. The basin includes Blues Creek, Alachua Slough and Sanchez Prairie. e. Sub-basins may be delineated for each basin. G. Order of mitigation preference. The order of preference for the location of the mitigation area in relation to the impacted area is as follows: 1. In the same sub-basin; 2. In the same basin; 3. In another listed basin. The appropriate reviewing board or city manager or designee, in writing, may approve a deviation from this order of preference if greater ecological benefits would be achieved with another order. H. Mitigation plan. Owners shall submit to the city manager or designee detailed plans describing proposed construction, establishment, and management of mitigation areas. These plans shall include the following information, as appropriate for the type of mitigation proposed by the owner: 1. A soils map of the mitigation area and other soils information pertinent to the specific mitigation actions proposed; 2. A topographic map of the mitigation area and adjacent hydrologic contributing and receiving areas; 3. A hydrologic features map of the mitigation area and adjacent hydrologic contributing and receiving areas; 4. A description of current hydrologic conditions affecting the mitigation area; 5. A map of plant communities in and around the mitigation area, including buffer areas; 6. Construction drawings detailing proposed topographic alterations and all structural components associated with proposed activities; 7. Proposed construction activities, including a detailed schedule for implementation; 8. Vegetation planting scheme and schedule for implementation, if planting is proposed; 9. Sources of plants and soils used in wetland creation; 10. Measures to be implemented during and after construction to avoid adverse impacts related to proposed activities; 11. A management plan comprising all aspects of operation and maintenance, including water management practices, plant establishment, exotic and nuisance species control, fire management, and control of access; 12. A proposed monitoring plan to demonstrate mitigation success; 13. A description of the activities proposed to control exotic and nuisance species should these become established in the mitigation area. The mitigation proposal shall include reasonable measures to assure that these species do not invade the mitigation area in such numbers as to affect the likelihood of success of the project; 14. A description of anticipated site conditions in and around the mitigation area after the mitigation plan is successfully implemented; 15. A comparison of current fish and wildlife habitat to expected habitat after the mitigation plan is successfully implemented; and 16. An itemized estimate of the cost of implementing mitigation, if applicable, as set forth herein. I. Monitoring requirements for mitigation areas. The owner shall monitor the progress of mitigation areas until success can be demonstrated as provided herein. Monitoring parameters, methods, schedules, and reporting requirements shall be specified as conditions within the appropriate permit. At a minimum, the owner shall transmit to the city manager or designee monitoring reports certified by an environmental scientist, biologist, registered engineer or registered landscape architect. These reports shall be submitted no less frequently than every 12 months for at least three years, except as provided herein. At a minimum, the monitoring reports shall include the following: 1. An executive summary; 2. A table of contents; 3. A map of the site; 4. Color photographs of the site and its important features; 5. A description and analysis of water levels; 6. A description and analysis of water quality; 7. A description and analysis of the amount and types of nuisance and exotic plants; 8. A description and analysis of the amount and types of intended and native plants; 9. The survival rates of installed plants; 10. Wildlife observations; and 11. A description of mitigating activities by owner or agent. Pursuant to the requirements of the Comprehensive Plan, regulatory fees for mitigation plan review and mitigation plan implementation shall be borne by the owner. Similar reporting to and review by the water management district shall be acceptable in lieu of this review. J. Protection of mitigation areas. The owner shall propose and be responsible for implementing methods to assure that mitigation areas will not be adversely impacted by incidental encroachment or secondary activities which might compromise mitigation success. K. Mitigation success. After three years of monitoring, the owner shall provide to the city manager or designee a written certification by an environmental scientist, biologist or registered engineer or registered landscape architect that the mitigation meets applicable success criteria as described below. If certification of success is not submitted or is not approved by the city manager or designee, then monitoring shall continue and monitoring reports shall be submitted until the city manager or designee deems the mitigation successful. 1. Mitigation success criteria. Mitigation success will be measured in terms of whether the objectives of the mitigation are realized. The success criteria to be included in permit conditions will specify the minimum requirements necessary to attain a determination of success. The city manager or designee shall deem the mitigation successful when all applicable water quality standards are met, the mitigation area has achieved viable and sustainable ecological and hydrological functions, and the specific success criteria contained in the permit are met. If success is not achieved within the time frame specified within the permit, remedial measures shall be required. Monitoring and maintenance requirements shall remain in effect until success is achieved. L. Financial assurances. As part of compliance with this section, the owner shall provide proof of financial assurance when: 1) conducting the mitigation activities; 2) conducting any necessary management of the mitigation site; 3) conducting monitoring of the mitigation; and 4) conducting any necessary corrective action indicated by the monitoring. 1. Cost estimates. The amount of financial assurance provided by the owner shall be an amount equal to 120 percent of the cost estimate for each phase of the mitigation plan. For the purposes of determining the amount of financial assurance that is required by this subsection, the owner shall submit a detailed written estimate, in current dollars, of the total cost of conducting the mitigation, including any maintenance and monitoring activities, and the owner shall comply with the following: a. The cost estimate for conducting the mitigation and monitoring shall include all associated costs for each phase thereof, including earthmoving, planting, structure installation, maintaining and operating any structures, controlling nuisance or exotic species, fire management, consultant fees, monitoring activities and reports. b. The owner shall submit the estimates, together with comprehensive and verifiable documentation, to the city manager or designee along with the draft of the financial assurance. c. The costs shall be estimated based upon a qualified third party performing the work and supplying services and materials at fair market value. All cost estimates shall be supported by comprehensive and verifiable documentation. 2. Financial responsibility assurances. Financial responsibility for the mitigation, monitoring, and corrective action for each phase of the project may be established by any of the following methods, at the discretion of the owner: a. Bond. A performance bond shall be filed with the city manager or designee which is executed by a surety company authorized to do business in the state with a rating of not lower or less than A-XII as rated by A.M. Best Company, Inc., an independent national rating service for performance companies, which bond shall be conditioned to secure the required mitigation, monitoring, and corrective action in a satisfactory manner within 12 months from final plat approval and any extension of such period approved by the city commission, or, in the case of development (site) plan review, prior to final development plan approval. The bond shall be enforceable by and payable to the city in a sum at least equal to 120 percent of the total cost of the required mitigation, monitoring, and corrective action as estimated by the project engineer and verified and approved by the city manager or designee. The bond shall be first approved by the city attorney as to form and legality prior to its submission with the proposed final plat to the city commission for approval and shall be executed by both the owner and the party or parties with whom the owner has contracted to perform the required mitigation, monitoring, and corrective action. In the case of development (site) plan review, the bond shall be first approved by the city attorney as to form and legality prior to submission of the proposed final development plan to the appropriate reviewing entity (board or city manager or designee) and shall be executed by the developer and the party or parties with whom the developer has contracted to perform the required mitigation, monitoring, and corrective action; or b. Irrevocable letter of credit. Deposit with the city manager or designee an irrevocable and unconditional letter of credit by a Florida bank that has authority to issue letters of credit and whose letter of credit operations are regulated and examined by a federal or state agency. The letter of credit shall be for an amount equal to 120 percent of the estimated costs of the required mitigation, monitoring, and corrective action. The letter of credit shall remain with the city as a valid letter of credit until the city is satisfied that all of the required mitigation, monitoring, and corrective action has been completed in accordance with plans and specifications, that mitigation success as provided herein has been achieved, and that all other provisions of this chapter relating thereto have been fully complied with; or c. Insurance certificate. An insurance certificate from a company authorized to do business in the state and which has a rating of not lower or less than A-XII as rated by A.M. Best Company, Inc. The insurance certificate and its associated insurance policy shall be reviewed and approved by the city manager or designee before the city can accept the certificate as a financial responsibility assurance to secure the mitigation, monitoring and corrective action. The insurance certificate shall name the city named as an additional insured and shall provide not less than 30 calendar days' notice to the city of cancellation; or d. Cash deposit. A cash deposit in an amount equal to 120 percent of the estimated costs of the required mitigation, monitoring, and corrective action. The cash deposit shall remain with the city until the city is satisfied that all of the required mitigation, monitoring, and corrective action has been completed in accordance with plans and specifications, that mitigation success as provided herein has been achieved, and that all other provisions of this chapter relating thereto have been fully complied with. 3. Owners not subject to financial assurance requirements. Owners whose mitigation is deemed successful pursuant to the mitigation success criteria provided herein prior to undertaking the construction activities authorized under their permit, or owners who purchase credits in a mitigation bank to offset the adverse impacts as required herein, are not subject to the financial assurance requirements of this section. 4. General terms for financial assurances. In addition to the specific provisions regarding financial assurances set forth herein, the following shall be complied with: a. The city attorney shall approve the form and content of all financial assurances prior to the commencement date of the activity authorized by the permit. b. The financial assurance(s) shall name the city as sole beneficiary or shall be payable solely to the city. If the financial assurance is of a type that is retained by the beneficiary according to industry standards, the city shall retain the original financial assurance. For mitigation projects required both by the city and the water management district, the financial assurance(s) shall name the city and the water management district as joint beneficiaries or shall be payable to the city and the water management district jointly, unless the city and the water management district establish an alternative arrangement in writing with respect to the designated beneficiary or payee. c. The financial assurances shall be effective on or prior to the date that the activity authorized by the permit commences and shall continue to be effective through the date of notification of final release by the city, which shall occur within 30 calendar days of the determination that the mitigation is successful. d. The financial assurances cannot be revoked, terminated, or canceled without the owner first providing an alternative financial assurance that meets the requirements of this Code. Once the owner receives actual or constructive notice of revocation, termination, or cancellation of a financial assurance or other actual or constructive notice of cancellation, the owner shall provide such an alternate financial assurance prior to expiration of the financial assurance. 5. Financial assurance conditions. For owners subject to the financial assurance requirements of this section, the city manager or designee will include the following conditions in the permit: a. An owner shall notify the city attorney by certified mail of the commencement of a voluntary or involuntary proceeding under Title XI (Bankruptcy), U.S. Code naming the permittee as debtor within ten business days of the owner filing of the petition. b. An owner who fulfills the requirements of this section by obtaining a letter of credit or bond will be deemed to be without the required financial assurance in the event of bankruptcy, insolvency or suspension or revocation of the license or charter of the issuing institution. The owner shall reestablish a financial assurance in accordance with this section within 60 calendar days after such event. c. When transferring a permit, the new owner or person with legal control shall submit documentation to satisfy the financial assurance requirements of this section. The prior owner or person with legal control of the project shall continue financial assurance until the city manager or designee has approved the permit transfer and substitute financial assurance. 6. Releases. a. Partial releases. The owner may request the city attorney to release portions of the financial assurance as phases of the mitigation plan, such as earth moving or other construction activities for which cost estimates were submitted in accordance with this section, are successfully completed. The request shall be in writing and include documentation that the phase or phases have been completed and have been paid for, or will be paid for, upon release of the applicable portion of the financial assurance. The city attorney shall authorize the release of the portion requested upon verification that the construction or activities has been completed in accordance with the mitigation plan. b. Final release. Within 30 calendar days of successful mitigation, as determined by the city manager or designee and based on the criteria stated herein, the city shall notify the owner and shall authorize the return and release of all funds held or give written authorization to the appropriate party of the cancellation or termination of the financial assurance. M. Application procedure. An owner seeking a permit for a development activity in an area containing wetlands shall adhere to the application procedure set forth in the development review process provisions of the Land Development Code. N. Density transfers. The Land Development Code provisions relevant to onsite transfer of development intensity and density shall apply to the transfer of intensity and density of developments within or in an area containing wetlands. O. Exemptions. The wetlands protection regulations do not apply to owners and applications exempted pursuant to section 30-8.18.

Ask a question about Gainesville law

Corpus searches the Gainesville sections it holds and shows the ones that match, with their citations. Free, no sign-in.