§ 4.2 — ACCESS MANAGEMENT

Code of Ordinances of the City of Lakeland, Florida (Supp. No. 22: codified through Ordinance No. 6121, enacted December 1, 2025) · Lakeland Land Development Code § 4.2

Corpus is an independent public-information project, not the official City of Lakeland website. Stable reference: corpuslaw.us/code/e07811a5-ae61-40ff-936d-0d10345788aa

4.2 - ACCESS MANAGEMENT

4.2.1 INTENT AND APPLICABILITY 4.2.1.1 Intent The intent of this section is to provide and manage access to properties while preserving the operating efficiency of the roadway system, to improve the safety of motorists and non-motorists, reduce traffic congestion and delay associated with poor access location and design, to coordinate access management with the Florida Department of Transportation (FDOT) and Polk County, and to support a multi-modal transportation system. This section is also intended to help implement the access management policies of the US Highway 98 South Corridor Access Management Plan. 4.2.1.2 Applicability This section shall apply to all arterial and collector roadways within the city limits, and to all properties that abut or have access to these roadways. 4.2.2 DEFINITIONS Access Classification: A system for assigning the appropriate degree of access control to roadways, based upon roadway function, traffic characteristics, and community development objectives. Access Management: The process of providing and managing access to land development, while preserving the safety and efficiency of travel on the surrounding roadway system. Arterial Roadways: Routes that provide service that is relatively continuous and of relatively high traffic volume, long average trip length, high operating speed, and high mobility importance. In addition, every United States numbered highway is an arterial road. Arterial roadways are given the highest capacities since they are designed to carry the greatest amount of through-traffic while generally providing a lower amount of access to adjacent land uses. Central City Transit Supportive Area (CCTSA): Area within which roadway levels-of-service are less stringent due to the presence of a traditional street grid network, extensive bicycle and pedestrian networks and transit services and facilities. Collector Roadways: Routes which provide service which is of moderately average traffic volume, moderately average trip length, and moderately average operating speed. Such a route also collects and distributes traffic between local roads or arterial roads and serves as a linkage between land access and mobility needs. Connection: A driveway, street, turnout, or other means of providing for the right of vehicle access to or from transportation facilities. For the purpose of this section, two one-way connections to a property may constitute a single connection. Corner Clearance: The distance from an intersection of a public or private road to the nearest connection along the public roadway. The distance is measured from the closest edge of pavement of the intersecting road to the closest edge of the pavement of the connection. The projected future edge of pavement of the intersecting road should be used, where available. (See Figure 4.2-1.) Cross Access: An easement or service drive providing vehicular access between two or more contiguous sites. Directional Median Opening: An opening in a restrictive median that provides for specific traffic movements and physically restricts other movements. Edge of Pavement: The physical existing edge of a paved road or the future edge. Future edge shall be used for the measurement where the associated capacity improvements are within an adopted five-year capital improvements program or within the Polk Long Range Transportation Plan short-term, financially feasible work program. Full Median Opening: An opening in a restrictive median designed to allow all turning movements to take place from the public road system and the adjacent connection, and which therefore is intended for signalization. Functional Area (of an intersection): That area beyond the physical intersection of two roadways that comprises decision and maneuver distance, plus any required vehicle storage length, and is protected through corner clearance standards and connection spacing standards. Functional Classification: A system used to group public roadways into classes according to their purpose in moving vehicles and providing access. Joint Access (or Shared Access): A driveway connecting two or more contiguous sites to the public street system. Local Roads: Routes providing service that is of relatively low average traffic volume, short average trip length or minimal through-traffic movements, and high land access for abutting property. Local roads provide the greatest amount of access to adjacent properties and have the lowest vehicle capacities. Lot Frontage: The linear portion of property that directly abuts a roadway. Minimum Connection Spacing: The minimum allowable distance between conforming connections, measured from the closest edge of the pavement of the first connection to the closest edge of the pavement of the second connection along the edge of the traveled way. Minimum Median Opening Spacing: The minimum allowable spacing between openings in a restrictive median to allow for crossing the opposite traffic lanes to access property or for crossing the median to travel in the opposite direction (U-turn). The minimum spacing or distance is measured from centerline to centerline of the openings along the traveled way. Minimum Signal Spacing: The minimum spacing or distance between adjacent traffic signals on a public roadway measured from centerline to centerline of the signalized intersections along the traveled way. Multi-Modal Transportation Level of Service: Refers to minimum level of service standards for roadways outlined in the Comprehensive Plan, in the Transportation Element, whereby the standards will vary based upon transit service frequency, bicycle amenities and pedestrian facilities. M-3 Level of Service District: The geographic area, adopted in the Comprehensive Plan, which provides a multi-modal level of service standard for transportation facilities. The M-3 District is where the local bicycle-accommodated bus system provides service at least every 30 minutes and where there is a substantial sidewalk system present within ¼ mile of those 30-minute routes. Non-Restrictive Median: A median or painted centerline that does not provide a physical barrier between center traffic turning lanes or traffic lanes traveling in opposite directions. This includes highways with continuous center turn lanes and undivided highways. Outparcel: A lot identified on a site plan or subdivision plan that is owned by a party other than the primary owner of the parent property, and is intended to be developed separately from the parent property and/or is intended to be developed for a different use (e.g., a non-residential use vs. residential use). Peak Hour: The highest hour of vehicular traffic volume on the adjacent public street network as measured for the city's level of service standards for transportation. In some instances, the peak hour of the development is evaluated for access management purposes when the project could create an operational or safety problem on the public road network during an off-peak time for adjacent street traffic. Reasonable Access: The minimum number of connections, direct or indirect, necessary to provide safe ingress and egress to the public road system based on the access management classification (if any), the proposed connection(s) and projected roadway traffic volumes, posted speeds, and the type and intensity of the land use. Restrictive Median: The portion of a divided highway physically separating vehicular traffic traveling opposite directions. Restrictive medians include physical barriers that restrict movement of traffic across the median such as a concrete barrier, a raised concrete curb and/or island, and a grass or a swaled median. Service Road: A public or private street or road, auxiliary to a controlled access facility, which has as its purpose the maintenance of local road continuity and provision of access to parcels adjacent to the controlled access facility. Stub-Out (Stub Street): A portion of a street or cross access drive used as an extension to an abutting property that may be developed in the future. Throat Length: The distance parallel to the centerline of a driveway to the first on-site location at which a driver can make a right turn or a left turn. On roadways with curb and gutter, the throat length shall be measured from the face of the curb to the end of the physical barrier. On roadways without a curb and gutter, the throat length shall be measured from the edge of the paved shoulder to the end of the physical barrier. Transit Oriented Corridors (TOC): See definition in Article 1. 4.2.3 CONNECTION LOCATION STANDARDS 4.2.3.1 Connection Spacing a. Roadways classified under the State Access Classification System shall, at a minimum, meet FDOT Access Management Standards for the roadway as prescribed by Florida Statutes and Florida Administrative Code, unless waived by the FDOT. Driveway connections within the US Highway 98 South corridor must meet the FDOT adopted spacing criteria as outlined in the US Highway 98 South Corridor Access Management Plan. Any existing substandard connections within the US Highway 98 South corridor shall be removed at the time of re-development where alternate access to the property exists or is feasible. b. Roadways operated/maintained by Polk County shall, at a minimum, meet the standards that are outlined in the Polk County Land Development Code, unless waived by the County. c. Separation between access connections on all collector and arterial roadways under the jurisdiction of the City of Lakeland shall meet the minimum connection requirements set forth in Table 4.2-1. Table 4.2-1 Minimum Connection Spacing Standards Posted Speed Limit | Arterial | Collector 35 mph | 245' | 125' 40 to 45 mph | 440' | 245' > 45 mph | 660' | 440 ' d. Connection spacing shall be measured from the closest edge of the pavement of one connection to the next closest edge of the pavement of the next connection. (See Figure 4.2-1.) Figure 4.2-1 Corner Clearance and Connection Spacing [image omitted; see the official code] e. The minimum lot frontage for all newly created lots on public arterial or collector roadways shall not be less than the applicable minimum connection spacing standards of this section, unless the property is served by an internal road system. f. Existing individual or assembled lots with less than the required frontage may be permitted individual access where the Director of Public Works determines joint or cross access is infeasible. g. Adjacent properties under the same ownership shall be considered as a single property for application of connection spacing or for connection permits. h. Applications for multiple connections for a single development shall conform to the spacing standards of this section. Multiple connections shall be considered by the Director of Public Works for approval based on the following criteria: 1. Separation of standard vehicles from heavy trucks or emergency vehicles; 2. Two one-way connections that in combination serve ingress and egress to the development; 3. Multiple connections enhance the safety of the abutting roadway and improve the on-site traffic circulation. i. To reduce turning movement conflicts, connections on undivided arterial and collector roadways should be aligned with those connections across the roadway. If such alignment is not possible, connections on opposite sides of the undivided roadway shall be designed to meet the standards shown in Table 4.2-2 to ensure safety in traffic and turning movements. Table 4.2-2 Connection Offsets Posted Speed | Minimum Offset < 35 mph | 125' 35 to 40 mph | 450' > 40 mph | 600' 4.2.3.2 Connections at Intersections a. General 1. New connections shall not be permitted within the functional area of an intersection, as illustrated in Figure 4.2-2, unless: (a) No other reasonable access to the property is available, and (b) The connection does not create a potential safety or operational problem as determined by the Director of Public Works, and (c) A condition is included in the permit that the applicant shall agree to close the access if and when alternative access becomes available that is more consistent with the corner clearance standards for the abutting roadways. Figure 4.2-2 Functional and Physical Area of the Intersection [image omitted; see the official code] 2. Where no other alternatives exist, construction of an access connection may be allowed along the property line farthest from the functional area of the roadway intersection as a non-conforming access. Property access will be restricted to the roadway with the lower functional classification and shall be closed within six months of when any conforming access becomes available. b. Limited Access Interchange Areas 1. Connections and median openings on arterial and collector roadways located up to 1,320 feet (1/4 mile) from an interchange area or up to the first intersection, whichever distance is less, shall be regulated to protect the safety and operational efficiency of the limited access facility and the interchange area. (See Figure 4.2-3.) Figure 4.2-3 Interchange Area Connections [image omitted; see the official code] 2. The minimum distance to the first connection from the terminus of the exit ramp shall be at least 660 feet (1/8 mile). (See Figure 4.2-3.) 3. The city may require the use of service roads for direct access to property within the area abutting freeway interchanges. These roads shall be designed to connect to more than one other roadway, wherever feasible, to enhance the overall accessibility of interchange development to the surrounding area. 4. The minimum distance to the first full median opening shall meet FDOT connection spacing standards. 4.2.3.3 Connection to Lower Classification Roadway a. Where property is served by roads of different functional classifications, the City may require development to provide primary access on the road with the lower functional classification in order to minimize access and traffic congestion on the primary roadway. b. Access to through lots shall be required on the street with the lower functional classification (See Figure 4.2-4). Access onto the higher functional classification roadway may be approved by the Director of Public Works. Figure 4.2-4 Double Frontage Lot Access [image omitted; see the official code] 4.2.3.4 Service Roads a. Service roads and/or shared access roads may be required on roadways operating below acceptable level-of-service standards to help mitigate the adverse impact of access on roadway safety and efficiency for concurrency purposes. b. Parcels that abut service roads must provide a primary connection to the service road. Secondary driveways to the public road system shall be prohibited. In instances where a connection cannot be made to a service road (for example, the planned service road has not yet been constructed to the subject property), a temporary connection to the public road system may be granted by the proper permitting authority (City, County or State). This temporary connection must be removed within six months from the time that a service road is constructed to or adjacent to the subject property. c. Service roads shall not access any roadway within the functional area of an existing intersection and shall not create a new access point that violates the connection spacing criteria in this section. d. All service roads shall be constructed to public street standards. 4.2.3.5 Cross Access and Joint Access a. If the connection spacing standards of this section cannot be achieved, then joint use connections and/or cross access easements shall be required. b. Applicants for all non-residential developments may be required to use cross access easements and joint use connections to connect adjacent properties in order to reduce curb cuts, to increase the area for parking and landscaping, and to preserve the capacity and safety of the roadway system. c. Property owners utilizing joint and/or cross access shall record with the Polk County Clerk of Court: 1. An easement allowing cross access to and from the adjacent properties; 2. A joint maintenance agreement defining maintenance responsibility of property owners that share the joint use connection and cross access system. d. Property owners that provide for joint and cross access may be granted a temporary connection permit, where necessary, to provide reasonable access until such time as the joint use connection and cross access connections are provided with adjacent properties. e. Within six months after construction of a joint use or cross access connection, property owners utilizing such access shall close and remove any existing temporary connections provided for access in the interim. f. Development may be required to construct a paved stub-out to the property line in anticipation of a future cross access connection. (See Figure 4.2-5.) Figure 4.2-5 Cross Access Stub-Outs [image omitted; see the official code] g. The design of the cross access corridor or joint connection including driveway apron shall conform to the Engineering Standards. The design shall ensure efficient and safe vehicular operation and pedestrian movements for internal traffic circulation and for traffic mobility on the adjacent roadway. h. Cross access easements are not intended to be publicly maintained. i. Properties that provide for joint use driveways under this section shall be eligible for a reduction in the number of required off-street parking spaces of up to 15 percent, subject to review and approval of the Director of Community Development. 4.2.3.6 Unified Access a. In the interest of promoting unified access and circulation systems, development sites under the same ownership or consolidated for the purposes of development and comprised of more than one building site shall be considered unified parcels for purposes of this section. This shall also apply to phased development plans and master developments such as Planned Unit Developments that contain a mix of land uses. Accordingly, the following requirements shall apply: 1. The number of connections permitted shall be the minimum number necessary to provide reasonable access to the overall site and not the maximum available for that frontage. 2. All easements and agreements required under Sub-Section 4.2.3.5 shall be provided. 3. Access to outparcels shall be internalized using the shared circulation system (See Figure 4.2-6). Internal connections (vehicular and non-vehicular) shall be made between different land uses within a master or planned development. The shared internal circulation system shall be designed to avoid excessive movement across parking aisles or queuing across surrounding parking and driving aisles and shall encourage pedestrian and bicyclist safety. Figure 4.2-6 Internalized Access to Out-Parcels [image omitted; see the official code] b. Where abutting properties are in different ownership and not part of an overall development plan, cooperation among the various owners in development of a unified access and circulation system is encouraged; this includes pedestrian connections. Such coordinated access may qualify for impact fee credits where it in effect creates a reliever road system and provides at least two points of connection to the public road network. Only the building sites under consideration for development approval shall be subject to the requirements of this section. Abutting properties shall not be required to provide unified access and circulation until they are developed or are redeveloped. c. Access to an outparcel shall be appropriately designed and marked with pavement markings, signage, and similar appropriate guidance to maximize the efficiency of the internal traffic circulation. d. An adequately demarcated pedestrian pathway shall provide a safe route for pedestrians between the outparcel and the primary development. e. Outparcels for land uses with connection volumes exceeding 100 peak hour trips may be considered for a single right-in access point. This access shall not be within the functional area of an existing intersection. The Director of Public Works shall determine whether or not the proposed right-in access point is appropriate, based upon the roadway characteristics, relevant traffic data, and the existing and proposed land uses. 4.2.4 CORRIDOR MANAGEMENT FOR "TYPE I" ROADWAYS 4.2.4.1 General a. The Comprehensive Plan identifies "Type I" roadways that are of particular significance for freight movement and high capacity connectivity to Lakeland's urban core. Type I roadways include: US 98, County Line Road, SR 548 (George Jenkins Boulevard from Sloan to US 98), SR 563 (Harden Boulevard from Ariana to SR 570/Polk Parkway), State Road 33 (north of Granada Street), West Pipkin Road (west of Old Highway 37 to County Line Road) and SR 546 (Memorial Boulevard between US 92/Wabash Avenue and Interstate 4). b. To minimize local traffic and improve corridor efficiency and safety, access to development sites on Type I roadways shall be controlled and cross-access and/or service roads to adjacent properties and improvements to adjacent corridors shall be required. c. Access from development sites to County Line Road shall be restricted to the minimum amount necessary to provide safe ingress/egress. Driveway connections shall be coordinated with Polk County as the permitting agency. 4.2.5 CONNECTION DESIGN STANDARDS 4.2.5.1 General a. Connections shall not be designed to require vehicles to back out directly onto the abutting roadway except for driveways serving single-family detached or two-family dwellings on individual lots. b. Where the roadway is undivided or where there is no signal control, and when existing or projected connection volumes exceed 75 vehicles in the peak hour or 500 vehicles per day, a 3-lane connection typical section may be required. (See Figure 4.2-7.) Figure 4.2-7 Large Volume Connection Diagram [image omitted; see the official code] c. Where there is no traffic signal, raised traffic separators may be required when connection volumes exceed 200 vehicles in the peak hour or 1,000 vehicles per day. Channelization islands shall conform to appropriate City, County or State design standards and shall be reviewed by the Director of Public Works (See Figure 4.2-8). Small "pork chop" raised islands are not an appropriate design alternative. Figure 4.2-8 Traffic Separators [image omitted; see the official code] 4.2.5.2 Throat Length a. The minimum throat length for unsignalized driveway connections to arterial and collector roadways shall, at a minimum, meet the following standards shown in Table 4.2-3 and Figure 4.2-9. However, deviations may be allowed by the Director of Public Works for all constrained development sites on a Transit Oriented Corridor or within the Central City Transit Supportive Area. Table 4.2-3 Connection Throat Length - Unsignalized Connection Peak Hour Volume | Throat Length Up to 25 | 25'/30' 26 to 50 | 40'/55' 51 to 99 | 75'/100' 100 or more | 150'/200' b. Connection throat lengths for signalized driveways shall meet the minimum standards shown in Table 4.2-4 (See also Figure 4.2-9). Deviations shall be allowed by the Director of Public Works for all sites within the M-3 Level of Service District. Table 4.2-4 Connection Throat Length - Signalized Number of Exit Lanes (left, through, right) | Throat Length 2 | 75' 3 | 200' 4 | 300' Figure 4.2-9 Throat Length [image omitted; see the official code] Figure 4.2-10 Number of Exit Lanes [image omitted; see the official code] 4.2.5.3 Turn Lanes a. Exclusive turn lanes for connections required on divided or undivided arterials or collector roadways shall not violate any spacing standards that have been established by City, County or State. Exclusive left turn lanes if the following conditions are met: 1. Posted roadway speed limit 35 mph or more and 40 or more existing and/or projected left turns in the peak hour. b. Exclusive right turn lanes for connections may be required if any of the following conditions are met: 1. Posted roadway speed limit equal to or greater than 45 mph and 50 or more right turns in the peak hour, or 2. Posted roadway speed limit less than 45 mph and 80 or more right turns in the peak hour. c. The left turn storage lengths and deceleration lengths are required in accordance with the FDOT Plans Preparation Manual. d. Queue (storage) and taper plus deceleration lane lengths for right turn lanes shall, at a minimum, meet the standards set forth in Table 4.2-5. (See also Figure 4.2-11.) Table 4.2-5 Right Turn Lane Taper and Storage Posted Speed | Taper & Decel Length (TL) | Storage Lane Length (SL) Stop Condition | Free Right 35 mph | 145' | 105' | 80' 40 mph | 155' | 135' | 110' 45 mph | 185' | 165' | 140' 50 mph | 240' | 195' | 170' 55 mph or greater | 385' | 210' | 200' Figure 4.2-11 Right Turn Storage and Taper Lanes [image omitted; see the official code] e. Continuous right turn lanes shall be prohibited. f. Turn lane warrant requirements may be modified for a development based on factors including, but not limited to, higher peak period traffic volumes, higher operating speeds, localized roadway congestion, pedestrian volume, crash experience (especially rear-end crashes) and facilities that have a larger number of heavy trucks or similar vehicles. Modifications to requirements shall be supported by traffic operations data and approved by the Director of Public Works. 4.2.6 INTERNAL SITE CIRCULATION a. For non-residential developments that are projected to generate 300 or more total peak hour trips and that are located along a roadway that has public transit service, the following internal traffic circulation features shall be included in the development plans. These features are in addition to other site plan requirements in the Land Development Regulations. 1. Internal service roads to serve as internal collectors and which can accommodate transit vehicles shall be defined through the use of pavement markings/striping and if possible, via physical delineation techniques such as curbing of landscaped areas in the parking lot. (See Figure 4.2-12.) Figure 4.2-12 Service Road [image omitted; see the official code] 2. Coordination with the local transit system and Director of Public Works or their designee(s) regarding the feasibility of a transit circulation route that allows for a transit stop within the site and near or along the front of the principal building(s). 3. Separation of heavy trucks routed to the side or rear of the principal building(s) including use of appropriate directional signage, as necessary. b. Non-residential developments that are adjacent to a public sidewalk and projected to generate less than 300 peak hour trips shall provide an adequately marked pedestrian pathway between the building entrance and the adjacent sidewalk. For projects located on corner parcels fronting more than one public street with a sidewalk, the number of dedicated pedestrian pathways shall correspond to the number of project driveways onto the public street system, with a maximum of one such connection per frontage. Additional connections may be required for large retail and employment center projects, including those within Developments of Regional Impact or Planned Unit Developments (See Figure 4.2-13). Marking for the pedestrian pathway may include pavement striping, landscaping, bollards, or similar markings and appropriate directional signage, as needed. Figure 4.2-13 Pedestrian Crossing within a Site [image omitted; see the official code] c. Residential developments shall provide internal Americans with Disabilities Act (ADA)-compliant pedestrian connectivity within the development with special emphasis on access to on-site recreational amenities, trails, clubhouses and open spaces. d. The internal road networks for new or redevelopment plans shall include, at minimum, a mainline internal roadway that maximizes on-site connectivity and shall also include, wherever possible, a system of internal grid or modified grid connections throughout the plan. This provision shall not be interpreted to prevent all use of the cul-de-sac but shall promote internal connections for vehicular traffic to the degree such is reasonable and possible. Where cul-de-sacs or other street terminations are used, sidewalk extensions or other such pathway connections to adjacent streets may be required to maintain or enhance overall network connectivity. e. Developments with drive-through facilities shall have adequate space to store the projected peak demand of vehicles off the public rights-of-way and off public and private streets. The minimum vehicle queue storage lengths for developments with drive-through facilities that have direct access to arterial or collector roadways shall, at a minimum, meet the standards set forth in Table 4.2-6. Table 4.2-6 Drive-Through Queues Development | Queue length Fast-food | 200' Bank | 150' Day care | 200' Pharmacy | 100' Note: The length of multiple queue lanes, such as at a bank, may be added together to meet the total required queue length. 4.2.7 DEVIATION FROM CONNECTION STANDARDS a. Meeting the standards of this section may not always be possible. Therefore, the following process is available to evaluate requested deviations from the standards of this section. In all cases, however, safety for the driving public and pedestrians shall be the primary consideration. b. The Director of Public Works may make a determination to modify or waive the requirements of Sub-Section 4.2.3.5 (Cross Access and Joint Access) where the characteristics of abutting parcels would make adherence to the standards infeasible. This determination shall be made in consultation with the Director of Community Development. c. Deviations of up to 10 percent of the connection standards in this section or deviations of up to 100 feet, whichever is less, are considered Minor Deviations. The Director of Public Works may grant such deviations based on roadway characteristics, land use, traffic operations, and safety. d. Except where otherwise provided for in this section for determination by the Director of Public Works, other requests for deviations are considered Major Deviations and shall be considered by the Zoning Board of Adjustment and Appeals (ZBAA) in accordance with the standards for variances contained in Article 12. e. In addition to the general requirements for a variance contained in Article 12, the applicant for a variance (major deviation) from the terms of this section shall provide adequate data and analysis to the Director of Public Works to demonstrate how the proposed alternate access management and/or site circulation plan is equal to or better than the relevant required access management and internal circulation provisions of this section. A staff report and recommendation from the Director of Public Works, prepared in consultation with the Director of Community Development, shall accompany the major deviation request to the ZBAA. Applicants for major deviations from access spacing standards shall submit an access management plan to the Director of Public Works as follows: 1. Encompasses a study area that includes the length of the property frontage on all abutting roadways, plus the distance established by access spacing standards on either side of the property lines, and the corresponding area on the opposite side of undivided roadways or divided roadways where a median opening is present. 2. Addresses existing and future access for study area properties. 3. Evaluates impacts of the proposed plan versus impacts of adherence to adopted standards. 4. Includes all improvements and recommendations necessary to implement the proposed plan.

(Ord. No. 5455, 07-21-14) (Ord. No. 5455, 07-21-14)