§ 4.7 — PEDESTRIAN, BICYCLE AND TRANSIT FACILITIES
Code of Ordinances of the City of Lakeland, Florida (Supp. No. 22: codified through Ordinance No. 6121, enacted December 1, 2025) · Lakeland Land Development Code § 4.7
Corpus is an independent public-information project, not the official City of Lakeland website. Stable reference: corpuslaw.us/code/ca7d0477-8635-45e1-a24b-9ba4a202f841
4.7 - PEDESTRIAN, BICYCLE AND TRANSIT FACILITIES
4.7.1 INTENT It is the intent of this section to establish minimum standards for pedestrian, bicycle and transit facilities, to reduce reliance on the automobile by promoting safe and efficient mobility by other modes of travel, to establish connections between different modes of travel, to implement the transportation policies of the Comprehensive Plan. 4.7.2 SIDEWALKS 4.7.2.1 Applicability a. Principal Structure on Lot or Parcel Prior to the issuance of a Certificate of Occupancy for any residential or non-residential principal structure, the developer or property owner shall construct sidewalks along roadways adjacent to all front and street side lot lines where sidewalks do not presently exist, except for any new single-family or two-family structure on any local street where a sidewalk presently exists directly on the opposite side of the street. Such sidewalks shall not be required for the enlargement, alteration or reconstruction of existing single-family or two-family structures, provided that a building permit for reconstruction is pulled within 12 months of the demolition of the existing single-family or two-family principal structure. In the case of new principal structures in existing multi-building complexes, such sidewalks shall only be required when the aggregate cost of the improvements exceeds 50 percent of the total assessed value of all structures located on the same lot or parcel. b. Enlarged, Altered or reconstructed Multi-Family or Non-Residential Principal Structure on Lot or Parcel Prior to the issuance of a Certificate of Occupancy for any enlarged, altered or reconstructed multi-family or non-residential principal structure on a lot or parcel, the developer or property owner shall construct sidewalks along roadways adjacent to all front and street side lot lines where sidewalks do not presently exist when the aggregate cost of the improvements exceeds 50 percent of the total assessed value of all structures located on the same parcel. c. Subdivisions (including Mobile Home Subdivisions). 1. Abutting Streets: Upon the construction of roadways for any new subdivision or resubdivision, the developer shall construct sidewalks along the subdivision side of each roadway abutting the subdivision where sidewalks do not presently exist, except that in the case of abutting local streets, no sidewalk shall be required where a sidewalk presently exists directly on the side opposite the subdivision and, if no sidewalk presently exists on either side, the required sidewalk may be constructed on the side opposite the subdivision if it results in better pedestrian connectivity. 2. Internal Streets: Upon the construction of roadways for any new subdivision or resubdivision, the developer shall construct sidewalks along both sides of arterial and collector roadways internal to the subdivision, and along at least one side of local streets internal to the subdivision. As an alternative, required sidewalks on internal local streets adjacent to building sites may be constructed on a lot by lot basis prior to the issuance of a Certificate of Occupancy for a structure on each respective lot. If this alternative is used, the developer shall construct sidewalks on arterial roadways, collector roadways, and on local streets adjacent to common areas that are not building sites at the time of roadway construction. If the developer elects to have sidewalks on only one side of any internal local street, he shall indicate on the plat the side of the street on which the sidewalk will be constructed. Such sidewalks shall be continuous on one side of the street within the same block but may cross to the other side on the next block. In the case of through lots, the Director of Community Development shall determine which yards function as rear yards and which functions as front yards and the developer shall constructed sidewalks adjacent to any yards that function as rear yards at the time of roadway construction. Sidewalks adjacent to through lot yards that function as front yards may be constructed on a lot by lot basis as above. d. Multi-family Developments Prior to the issuance of a Certificate of Occupancy for the first unit in any new multi-family residential development, the developer or property owner shall construct sidewalks along the development side of each roadway abutting the development where sidewalks do not presently exist, except on any local street where a sidewalk presently exists directly on the opposite side of the street, and along at least one side of all internal roadways. Internal sidewalks shall connect all buildings, on-site amenities and any existing or planned external sidewalks along the project frontage. e. Mobile Home Parks Prior to the issuance of a Certificate of Occupancy for any new mobile home park, the developer or property owner shall construct sidewalks along the development side of each roadway abutting the development where sidewalks do not presently exist, except on any local street where a sidewalk presently exists directly on the opposite side of the street, and along at least one side of all entrance roadways. f. Shopping Centers Prior to the issuance of a Certificate of Occupancy for the first unit in any new shopping center, the developer or property owner shall construct sidewalks along the development side of each roadway abutting the shopping center where sidewalks do not presently exist. g. Multi-Unit Industrial or Office Park Developments Prior to the issuance of a Certificate of Occupancy for the first unit in any new multi-unit industrial or office park development, the developer or property owner shall construct sidewalks along the development side of each roadway abutting the development where sidewalks do not presently exist, except on any local street where a sidewalk presently exists directly on the opposite side of the street, and along at least one side of the principal entrance roadway. Sidewalks shall be constructed between the principal customer entrances of each building entrance within an office park campus. h. On Designated Main Streets within Urban Neighborhood (UNH), Center (UCT), Corridor (UCO) and Special Purpose (USP) Context Districts For new or reconstructed multi-family or non-residential principal structures, the developer or property owner shall construct six- to twelve-foot wide sidewalks along frontages of designated Main streets as illustrated in Figure 3.3-1 (Street Types), with right-of-way or easements being dedicated to the City for any portions of required sidewalks that would otherwise extend outside of public right-of-way. The final sidewalk width shall be determined by the City Engineer prior to engineered site or construction plan approval. 4.7.2.2 Exceptions a. Payment in Lieu of Construction 1. Local Streets, Where Sidewalk Network Does Not Exist: In the case of new single-family and two-family infill development or infill redevelopment on a local street where there is no existing sidewalk on the same side of the street and no existing sidewalk directly on the opposite side of the street, the developer or property owner shall make a payment into the Sidewalk Construction Fund in lieu of constructing sidewalks along local streets. Such payment shall be equivalent to one-hundred percent of the per linear foot cost to the City for installing the sidewalk based upon the current market price as determined by the City Engineer. In those instances where sidewalk segments exist on both sides of a street, then the City Engineer shall determine the preferred side of the street where sidewalk construction will be required by new development or redevelopment based on such factors as amount of existing sidewalk, physical impediments and right-of-way restrictions that cannot be mitigated. Payment shall be made prior to the issuance of a building permit for the structure. This exception shall not apply in the case of lots in subdivisions where the developer has chosen to construct sidewalks on a lot-by-lot basis in accordance with Sub-Section 4.7.2.1.c.2. 2. Any Street, Regardless of Classification, Where Sidewalk Not Feasible: The City Engineer shall be authorized to determine if the construction of sidewalks required by this section is infeasible, impractical, unsafe or otherwise undesirable in a particular case due to topographic conditions, right-of-way restrictions that cannot be mitigated, the presence of existing physical impediments including trees, impending roadway or utility construction, or other circumstances that the City Engineer shall deem appropriate. In such case, the developer or property owner shall make a payment into the City of Lakeland Sidewalk Construction Fund in lieu of constructing the required sidewalks. Such payment shall be equivalent to one-hundred percent of the cost to the city for installing the sidewalk, including design, earthwork and drainage costs, based upon the current market price as determined by the City Engineer. Payment shall be made prior to the issuance of any building permit for the development, or in the case of a subdivision, prior to final plat approval. b. Sidewalks shall not be required along roads that are specifically exempted as part of an approved Alternative Pedestrian Circulation System Plan pursuant to Sub-Section 4.7.2.3. c. The Director of Community Development may grant relief from some or all of the requirements of this section for qualified affordable housing developments including single-family, two-family and multi-family developments, in accordance with administrative policies for affordable housing. In granting such relief, the Director may propose a plan to fund the construction of sidewalks from other sources, including but not limited to the City of Lakeland Sidewalk Construction Fund. 4.7.2.3 Alternative Pedestrian Circulation System Plan To allow for flexibility and to encourage innovative design, the developer may submit an alternative pedestrian circulation system plan as part of a Planned Unit Development, conditional use or subdivision plat. The city may also initiate an alternative pedestrian circulation system plan as part of a Special Public Interest District. Such plan may incorporate paths, trails, overpasses, underpasses or other design features that provide equal or greater pedestrian mobility to the requirements of this section. If the site design elements of the plan are approved, relief may be granted from some or all of the requirements of this section. Facilities that are part of an alternative pedestrian circulation system that are not conventional sidewalks to be dedicated for public maintenance shall be privately maintained. All components of an alternative pedestrian network shall be located within a dedicated access easement approved by the Director of Public Works. 4.7.2.4 Sidewalk Construction Standards All required sidewalks shall meet requirements of the City of Lakeland Engineering Standards Manual regardless of whether they are located in a public right-of-way, private right-of-way, or easement. 4.7.2.5 Donation of Right-of-Way or Easement Sidewalks may be constructed within public road rights-of-way, private road rights-of-way, or within suitable easements. Where sidewalks required by this section are to be publicly maintained and sufficient public right-of-way does not exist to construct the sidewalks, the property owner shall donate the right-of-way or shall provide easements to allow the sidewalks to be constructed. The City Engineer shall determine the amount of right-of-way or easement needed in each case. Where the donation of additional right-of-way would cause unnecessary hardship with respect to minimum building setbacks, the Zoning Board of Adjustment and Appeals may issue a variance. A private entity such as a developer or property owners association may construct required sidewalks on private property without donating land for public right-of-way, provided that the sidewalks are privately maintained. 4.7.2.6 Protection of Street Trees Where possible, sidewalks shall be routed to avoid existing street trees and root zones of street trees. Sidewalk construction that will involve the removal of street trees or paving over or grading within 30 percent or more of the root zone of street trees shall require authorization of the City Arborist in accordance with Section 4.5 (Landscaping, Trees and Buffering). 4.7.2.7 Construction Bond Construction plans shall include sufficient detail for the construction of required sidewalks. Except as noted herein, construction of sidewalks shall be completed prior to the issuance of a Certificate of Occupancy, provided, however, that in instances where completion of sidewalk construction is delayed due to circumstances beyond the reasonable control of the developer or property owner, and all other requirements for a Certificate of Occupancy have been met, the Building Official shall be authorized to issue the Certificate of Occupancy upon receipt of a cash bond in the amount of 110 percent of the cost of the sidewalk construction. Such bond shall be held for a period not to exceed four weeks from date of receipt; after which if the sidewalk construction has not been started by the developer or property owner, the bond shall be applied toward construction of the sidewalk by the city. 4.7.2.8 Maintenance Sidewalks within public rights-of-way shall be maintained by the City of Lakeland. The City of Lakeland shall repair defects caused by normal deterioration in accordance with Public Works Department policy, provided, however, that in the event any sidewalk is damaged by the act or omission of the abutting property owner or one acting by, through or with the permission of the abutting property owner, including lack of maintenance of vegetation that causes damage or slippery conditions to the sidewalk, then the cost of repairing any damage occasioned by the act or omission of the abutting property owner or the act or omission of other person acting by, through or with the permission of the abutting property owner shall be borne by such abutting property owner. If the abutting property owner fails to cause such repairs to be made, the City of Lakeland shall repair or restore the sidewalk and shall assess the cost of such repair or restoration against such abutting property owner in the manner prescribed for the assessment of local improvements. 4.7.3 MULTI-USE PATHWAYS AND BIKE LANES 4.7.3.1 Applicability a. Prior to the issuance of a first Certificate of Occupancy, development located on any Priority Pathways Corridor, as designated in the Transportation Element of the Comprehensive Plan, and which generates more than 120 daily automobile trips, shall construct the appropriate pathway or bike lane segment in accordance with the following: 1. The type of pathway or bike lane shall be in accordance with Table III-17 of the Comprehensive Plan Transportation Element and constructed in accordance with Sub-Section 4.7.3.2. 2. The pathway or bike lane shall provide a continuous route that connects with existing or future segments of the Priority Pathways Corridor and shall be routed along the project frontage or within or through the development as the Director of Public Works may determine is most appropriate. 3. If construction of the Priority Pathway segment is not feasible, with the approval of the Director of Public Works the developer may pay a fee in lieu of construction into the Transportation Fund for Pathways Projects. The fee shall be based on a signed and sealed cost estimate prepared by a registered professional engineer in the State of Florida. If the pathway facility is not necessary to achieve a favorable transportation concurrency determination, the development may provide a payment to the Pathways Fund equivalent to the Sidewalk Construction Fund payment otherwise allowed under Sub-Section 4.7.2.2. b. Any subdivision or development proposing a multi-use pathway as part of an Alternative Pedestrian Circulation System Plan shall do so in accordance with the requirements of Sub-Section 4.7.3.2 for the appropriate pathway type. c. Any development not located on a Priority Pathways Corridor which voluntarily provides multi-use pathways or bike lanes, shall do so in accordance with the requirements of Sub-Section 4.7.3.2 for the appropriate pathway type. 4.7.3.2 Standards a. General 1. Pathways not located within a public right-of-way shall be within a minimum 20-foot wide easement and shall be privately maintained unless a public agency agrees to maintain the facility. 2. Design and construction shall be in accordance with the American Association of State Highway and Transportation Officials (AASHTO) Bicycle Facilities Guide. 3. Signage shall be in accordance with the Manual of Uniform Traffic Control Devices (MUTCD). 4. Surfaces shall be paved except that off-road pathways located within any Conservation context, wetland or required minimum setback from a protected lakeshore may have a stabilized, unpaved surface. 5. Site design shall minimize driveway crossings and other conflicts with pathways and bike lanes to the greatest practical extent. b. Specific to Type 1. Priority Pathway, Off-Road Minimum 12-foot wide asphalt trail with two-foot shoulder/clear zone on each side. Minimum five-foot separation between pathway and roadway. Minimum 10-foot wide, stabilized, unpaved trail may be used in bona fide conservation areas such a wetlands. 2. Priority Pathway, On-Road Minimum five-foot wide designated bicycle lane on curbed roadway section without gutter. Minimum four-foot wide with curb-and-gutter. A minimum four-foot wide paved shoulder may be used where roadway is constrained, subject to appropriate signage and striping. 3. Alternative Pedestrian Routes Minimum eight-foot wide asphalt or concrete off-road pathway. Stabilized, unpaved trail may be used in bona fide conservation areas such a wetlands. 4.7.4 TRANSIT FACILITIES 4.7.4.1 Applicability a. Development that is required to incorporate transit facilities as part of transportation concurrency mitigation requirements of Article 10, or in accordance with any other provision of this Code, shall do so in accordance with the standards and requirements of this section. b. Development which voluntarily provides transit facilities shall do so in accordance with the standards and requirements of this section. 4.7.4.2 Standards a. The location of transit stops on the public street system or internal to a development site shall be as approved by the Lakeland Area Mass Transit District or successor agency (transit agency). b. Transit stops shall be designed in accordance with the Engineering Standards Manual and shall comply with Americans with Disabilities Act (ADA) standards. c. Transit stops shall be placed within a right-of-way or recorded easement. Easements shall be executed prior to the issuance of a first Certificate of Occupancy for the development. d. Transit shelter pads and associated structures shall require a building permit. Transit shelter pads constructed within public rights-of-way shall require a right-of-way use permit. Site plans for transit shelters, including those submitted by the transit agency, shall be reviewed by the Development Review Team. e. Transit stops shall provide connections to the nearest sidewalk or pedestrian pathway. f. Where a transit stop is required to be located internal to a development, to the greatest practical extent the site shall be designed to minimize conflicts between transit vehicles and off-street parking areas and shall be located to minimize pedestrian travel distance between the transit stop and principal building entrances.
(Ord. No 6054, § 2(Att. A), 9-16-24) (Ord. No. 5455, 07-21-14; Ord. No 6054, § 2(Att. A), 9-16-24) (Ord. No. 5455, 07-21-14)
Ask a question about Lakeland law
Corpus searches the Lakeland sections it holds and shows the ones that match, with their citations. Free, no sign-in.
