§ 5-5 — Load tests
Code of the City of Miramar, Florida (Supp. No. 105: codified through Ordinance No. 26-10, adopted July 8, 2026) · Miramar City Code § 5-5
Corpus is an independent public-information project, not the official City of Miramar website. Stable reference: corpuslaw.us/code/e19ec5c5-ea13-4393-a279-65c6098dc376
Sec. 5-5. - Load tests.
(a) Test required. No passenger-carrying amusement devices of the following types shall be used or put into normal operation until they have withstood a load test without failure in any material respect: (1) Devices having suspended passenger seats or spaces. (2) Devices normally operated at speeds or with movements creating centrifugal forces. (3) Devices so elevated that structural failure is likely to cause passengers to be injured by falling. (4) Devices as to which the building official has ordered such a test upon finding it necessary to assure safety. A load test shall be required at least once each year and at the time of the first assembly in the city. This test shall be made in the presence of the inspector. (b) Nature of test. Each passenger seat or space shall be weighted with at least three hundred (300) pounds of dead weight, except that in a device intended only for small children each seat or space shall be weighted with at least one hundred fifty (150) pounds. While so loaded, the device shall be so operated at maximum normal speed for a period of twenty (20) minutes to test the full operation of all control devices, speed-limiting devices, brakes and other equipment provided for safety. Upon completion of the test, units shall be disassembled for inspection. As an alternate procedure, each alternate seat or space, or grouping of seats or spaces, such as a car in a ferris wheel, shall be weighted as above. While so loaded, the device shall be operated at maximum normal speed for a period of ten (10) minutes. Then the device shall be unloaded and the other alternate units loaded as above, and the device shall be operated at maximum normal speed for a period of ten (10) minutes. Upon completion of this two-step test, the units shall be disassembled for inspection. (c) Note. Practical difficulties or unnecessary hardship in special cases will be considered by the building official if a petition for a variation is presented, provided it can be proven that the device in question can be operated safely within the intent and purpose of this chapter. (d) Other tests. The building official may require other tests, such as magna flux or x-ray, which in his/her judgment are warranted under the circumstances, to assure the operational safety of a particular device. (e) Effect of test. If the device fails to withstand a load test, it shall be deemed unsafe and shall not be used until and unless it has been repaired and has withstood a subsequent load test without failure in any material respect.
(Code 1964, § 3A-6)
Ask a question about Miramar law
Corpus searches the Miramar sections it holds and shows the ones that match, with their citations. Free, no sign-in.