For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.70.030.1.9 — Sign permit

Code of Ordinances, City of St. Petersburg, Florida (Supp. No. 55, Update 2: codified through Ordinance No. 646-H, adopted August 27, 2026) · St. Petersburg City Code § 16.70.030.1.9

Corpus is an independent public-information project, not the official City of St. Petersburg website. Stable reference: corpuslaw.us/code/c5e5b3fb-c541-460c-a74d-4f40694f985a

16.70.030.1.9. - Sign permit.

A. Applicability. No sign shall be created, erected, changed, converted, altered or enlarged, wholly or in part, without a sign permit, except for exempt signs. Signs shall comply with all applicable building, electrical, maintenance and other applicable codes. In the event of a conflict between this section and other applicable codes, the more stringent code will prevail. B. Application. An application shall include the following information in addition to the information that the POD may generally require for a zoning permit application: 1. For freestanding signs, a site plan of the subject property. The number of copies required shall be established by the POD; 2. Detailed drawings to show the dimensions, design, structure and location of each particular sign; 3. Computation of the maximum total sign area, the maximum area for individual signs, the height of the signs and the number of freestanding signs allowed on the site; 4. Name of person erecting the sign; 5. Signs taller than six feet and within ten feet of the public right-of-way shall provide a letter of no objection from the local power company to ensure current and future compliance to applicable codes and to protect the safety of the public; 6. Where applicable, a copy of the staff report and meeting minutes resulting from the action of any Commission or City Council relating to the proposed development or redevelopment. C. Scope of approval. The applicant shall apply for and obtain a certificate of completion after construction is completed. D. Expiration. A sign permit shall be valid for a maximum 180 days after issuance unless the sign is constructed and the building permit finalized during such time, in which event the permit shall be deemed to have an indefinite term, provided that the sign continues to comply with all applicable requirements, conditions and restrictions. If construction has begun, one 30-day extension may be approved by the POD. If the sign is not constructed before the expiration of the permit, the permit shall become null and void. E. Time for review and decisions; right to judicial review; sign permit applications. The deadlines for the review of, and decisions upon, sign permit applications shall be as provided for building permits generally; see section 104.4.1 of the standard Florida Building Code as adopted by the City, and the directive of the Mayor issued on or about September 18, 2001, with respect to the timely processing of building permit applications. More specifically, the aspirational goal for the plan review and a decision upon each complete application for a sign permit which is accompanied by the applicable plan review fee and signage plan shall be the same as the goal for "commercial construction" permits (without necessarily categorizing sign permit applications as "commercial construction permit" applications for other purposes). The aspirational goal for plan review and a decision upon a sign permit application shall be 12 business days. A failure to make a decision upon a sign permit application within such time shall not be determinative of the ultimate approval or disapproval of the application. However, a failure to decide upon a sign permit application within 30 calendar days following the date of receipt of the application, plan review fee, and signage plan, not counting the day of receipt and not counting any Saturday, Sunday, or legal holiday which falls upon the first or the 30th day after the date of receipt, shall be deemed a disapproval of the application, subject to the exceptions set forth herein. A sign permit application shall be either approved, approved with conditions, or disapproved, and the decision shall be reduced to writing. An approval with conditions shall include or be accompanied by a statement explaining the purpose of each condition. A disapproval shall include or be accompanied by a statement of the reason for the disapproval. If disapproval is the consequence of a failure to decide upon the application within the deadline set forth herein, the POD shall in such instances give to the applicant a written statement of the reason for such failure, and shall refund the plan review fee to the person who paid the fee. 1. An approval, an approval with conditions, or a disapproval by the POD shall be deemed the final decision of the City upon the application. 2. In the case of an approval with conditions or a disapproval, an applicant may seek reconsideration of the decision on the grounds that the POD may have overlooked or failed to consider any fact that would support a different decision. A written request for reconsideration, accompanied by such additional factual information which the applicant may desire the POD to consider, shall be filed with the POD within ten calendar days after receipt of the decision. No fee shall be required for a request for reconsideration. Upon the timely filing of a request for reconsideration, the decision of the POD shall be deemed stayed and not a final decision, until the request for reconsideration is decided. The request for reconsideration shall be decided within seven calendar days after the filing of the request for reconsideration. Such decision shall be in writing and shall include a statement of the reason for the decision. If the disapproval was a consequence of a failure to decide upon the application within the deadline set forth herein, the POD shall verify that the plan review fee was refunded even if the POD approves the application upon reconsideration. 3. All decisions shall be mailed, transmitted electronically, or hand delivered to the applicant. A record shall be kept of the date of mailing, electronic transmittal, or hand delivery. For the purposes of calculating compliance with the 30-day deadline for a decision upon an application or the seven-day deadline for a decision upon a request for reconsideration, the decision shall be deemed made when deposited in the mail, transmitted electronically, or hand-delivered to the applicant. 4. As exceptions to the foregoing, the 30-day deadline for approval and the seven day deadline for a decision upon a request for reconsideration shall not apply (that is, the time shall be suspended): a. In any case in which the application requires a variance from any provision of the Code, a rezoning of the property, or an amendment to the Comprehensive Plan of the City. In such cases, the time shall be suspended until a final decision is made upon the application for the variance, rezoning, or Comprehensive Plan amendment. b. If an applicant is required to make any change to the application in order to obtain an unconditional approval, the time shall be suspended while the applicant makes such change. c. If an applicant is required to obtain an approval from any other governmental agency, the time shall be suspended until such approval is obtained. d. In any of the foregoing cases, the applicant may elect to seek no variance, make no change to the application, or obtain no approval that may be required by another governmental agency, as the case may be, and to demand a decision upon the sign permit application as filed. In such event, the POD shall make a decision on the application as appropriate within two business days after receiving such demand. If a decision is not made in such time, the application shall be deemed denied and the POD shall verify that the plan review fee was refunded to the person who paid the fee. e. An application which is materially incomplete or which is not accompanied by the required fee and signage plan shall not be deemed to be accepted and the time for review of the application shall not commence until a complete application accompanied by the required fee and signage plan is filed with the POD. 5. Any person aggrieved by the decision shall have the right to seek judicial review by a circuit court of the Sixth Judicial Circuit in and for Pinellas County, Florida, filed in accordance with the requirements of law, seeking such appropriate remedy as may be available. F. Variances. 1. A complete application for a variance from any of the provisions of this section, accompanied by the fee for such application, shall be processed and reviewed by the commission designated in the Decisions and Appeals Table. In such cases, the following deadlines shall apply: a. A decision approving, approving with conditions, or denying the request shall be rendered within 60 days after receipt by the POD of the application for the variance. If a decision is not made within such time, the application shall be deemed denied. b. A decision of the commission designated in the Decisions and Appeals Table on an application for a variance from any of the provisions of this section, which does not include an application for a variance from any other provision of the Code, shall not be subject to review by the City Council. 2. Other variances. If the application includes a request for one or more variances from another provision of the Code, the decision of the commission designated in the Decisions and Appeals Table shall be subject to review by the City Council as is otherwise provided in this Code upon the timely filing of a notice of appeal. 3. Any decision of the commission designated in the Decisions and Appeals Table as provided in this section shall be deemed a final, quasi-judicial decision of the City. Any person aggrieved by the decision shall have the right to seek judicial review by a circuit court of the Sixth Judicial Circuit in and for Pinellas County, Florida, filed in accordance with the requirements of law, seeking such appropriate remedy as may be available. G. Request for interpretation. A written request for an interpretation pursuant to the sign section shall be answered within ten business days following receipt by the POD. If the POD fails to provide an interpretation within such time, the request shall be deemed denied. Neither an interpretation nor a denial of a request for an interpretation shall be deemed a final decision of the City unless such action is taken in conjunction with an approval or a disapproval of a sign permit, or an approval of a sign permit application subject to conditions, in which case the decision upon the sign permit application shall be deemed to be the final decision of the City, subject to judicial review as provided herein. H. Identification. Every sign erected, constructed, altered or enlarged, for which a permit is required, shall be plainly marked with the name of the person, firm or corporation erecting and maintaining such sign and shall have affixed on the front thereof the permit number issued for the sign by the Building Official.

(Code 1992, § 16.70.030.1.9; Ord. No. 100-H, §§ 5, 20, 12-19-2013)

Ask a question about St. Petersburg law

Corpus searches the St. Petersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.