For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 16.70.040.1.4 — Site plan review

Code of Ordinances, City of St. Petersburg, Florida (Supp. No. 55, Update 2: codified through Ordinance No. 646-H, adopted August 27, 2026) · St. Petersburg City Code § 16.70.040.1.4

Corpus is an independent public-information project, not the official City of St. Petersburg website. Stable reference: corpuslaw.us/code/5c836813-f4bc-4009-80db-a4c80e8d66a4

16.70.040.1.4. - Site plan review.

A. Applicability. In neighborhood zoning districts, site plan review (SPR) approval by the DRC is required for all projects in excess of 50,000 square feet of gross floor area for nonresidential or mixed-use projects or 60 dwelling units for residential projects. In all other districts SPR approval by the DRC is required for all projects in excess of 250,000 square feet of gross floor area except in the EC-2 district or the DC districts. In addition, SPR approval by the DRC is required for all projects located within or partially located within the Coastal High Hazard Area in excess of 60 dwelling units, regardless of the zoning district. B. Application. An application shall include the following information in addition to the information that the POD may generally require for a planning and zoning decision application: 1. A site plan of the subject property. The number of copies required shall be established by the POD: a. All site plans shall include information required by the POD. (1) Elevations depicting architectural details and materials for all sides of each structure shall be provided. (2) The POD may require a surveyor's certificate to determine location of the proposed structure relative to the lot lines involved. b. If the proposed development or redevelopment requests modification of the minimum number of parking spaces or the parking layout, the site plan shall include required parking information. c. If the proposed development or redevelopment requests modification of the existing landscaping or installation of new landscaping, the site plan shall include required landscaping information. 2. Data sheet. 3. Application for certificate of concurrency. 4. If a variance request is included, a written demonstration that the existing conditions and circumstances are such that strict application of the provisions of the Land Development Regulations would deprive the applicant of reasonable use of said land, building or structure, equivalent to the use made of lands, buildings, or structures in the same district and that the peculiar conditions and circumstances are not the result of the actions of the applicant. 5. Public participation report or a statement that public participation was not performed. C. Procedures. The site plan review process is a one or two-step process. The applicant may include conceptual plan review as a preparatory step in the development process, or may apply for final approval as follows: 1. Staff review and recommendation. Upon receipt of a site plan review application, the POD shall determine whether the application complies with all submittal requirements and standards for review. a. Streamline approval. If the POD determines that the application complies with all submittal requirements and standards for review and is less than the threshold square footage requirements, the POD may approve such application with or without conditions. The POD shall provide notice as required. b. Appeals. A decision of the POD to approve, approve with conditions or deny an application may be appealed to the commission designated in the Decisions and Appeals Table, whose decision shall be deemed the final decision of the City. 2. Commission review and decision. a. Public hearing. If the POD determines that because of new or unusual circumstances the application requires review by the commission designated in the Decisions and Appeals Table or that the application does not comply with all submittal requirements and standards for review or exceeds the threshold square footage requirements, the POD shall send a report to the commission designated in the Decisions and Appeals Table, with a copy to the applicant, if any, recommending whether the application should be approved, approved with conditions or denied and the grounds for such recommendation. b. Commission decision. Upon receipt of the recommendation from the POD, the Commission shall conduct a public hearing on the application and shall approve, approve with conditions or deny the requested site plan. After considering the application and evidence, the Commission may defer action for no more than 60 days to obtain additional information. D. Standards for review. In addition to the standards of review for a zoning and planning decision generally, a decision shall be guided by the following factors: 1. The use is consistent with the Comprehensive Plan; 2. The property for which a site plan review is requested shall have valid land use and zoning for the proposed use prior to site plan approval; 3. Ingress and egress to the property and proposed structures with particular emphasis on automotive and pedestrian safety, separation of automotive and bicycle traffic and control, provision of services and servicing of utilities and refuse collection, and access in case of fire, catastrophe and emergency. Access management standards on state and county roads shall be based on the latest access management standards of FDOT or the county, respectively; 4. Location and relationship of off-street parking, bicycle parking, and off-street loading facilities to driveways and internal traffic patterns within the proposed development with particular reference to automotive, bicycle, and pedestrian safety, traffic flow and control, access in case of fire or catastrophe, and screening and landscaping; 5. Traffic impact report describing how this project will impact the adjacent streets and intersections. A detailed traffic report may be required to determine the project impact on the level of service of adjacent streets and intersections. Transportation system management techniques may be required where necessary to offset the traffic impacts; 6. Drainage of the property with particular reference to the effect of provisions for drainage on adjacent and nearby properties and the use of on-site retention systems. The Commission may grant approval of a drainage plan as required by City ordinance, county ordinance, or SWFWMD; 7. Signs, if any, and proposed exterior lighting with reference to glare, traffic safety and compatibility and harmony with adjacent properties; 8. Orientation and location of buildings, recreational facilities and open space in relation to the physical characteristics of the site, the character of the neighborhood and the appearance and harmony of the building with adjacent development and surrounding landscape; 9. Compatibility of the use with the existing natural environment of the site, historic and archaeological sites, and with properties in the neighborhood as outlined in the City's Comprehensive Plan; 10. Substantial detrimental effects of the use, including evaluating the impacts of a concentration of similar or the same uses and structures, on property values in the neighborhood; 11. Sufficiency of setbacks, screens, buffers and general amenities to preserve internal and external harmony and compatibility with uses inside and outside the proposed development and to control adverse effects of noise, lights, dust, fumes and other nuisances; 12. Land area is sufficient, appropriate and adequate for the use and reasonably anticipated operations and expansion thereof; 13. Landscaping and preservation of natural manmade features of the site including trees, wetlands, and other vegetation; 14. Sensitivity of the development to on-site and adjacent (within 200 feet) historic or archaeological resources related to scale, mass, building materials, and other impacts; 15. Availability of hurricane evacuation facilities for developments located in the hurricane vulnerability zones; 16. Meets adopted levels of service and the requirements for a certificate of concurrency by complying with the adopted levels of service for: a. Water. b. Sewer. c. Sanitation. d. Parks and recreation. e. Drainage. E. Variances. Requests for variances shall be reviewed by the commission designated in the Decisions and Appeals Table.

(Code 1992, § 16.70.040.1.4; Ord. No. 876-G, § 30, 2-21-2008; Ord. No. 892-G, § 5(16.70.040.1.4), 9-4-2008; Ord. No. 985-G, § 114, 7-15-2010; Ord. No. 100-H, § 9, 12-19-2013; Ord. No. 214-H, § 3, 3-3-2016; Ord. No. 346-H, § 17, 3-14-2019; Ord. No. 428-H, § 7, 10-8-2020; Ord. No. 544-H, § 5, 4-20-2023)

Ask a question about St. Petersburg law

Corpus searches the St. Petersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.