For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 25-308 — Construction permits

Code of Ordinances, City of St. Petersburg, Florida (Supp. No. 55, Update 2: codified through Ordinance No. 646-H, adopted August 27, 2026) · St. Petersburg City Code § 25-308

Corpus is an independent public-information project, not the official City of St. Petersburg website. Stable reference: corpuslaw.us/code/c80d15d3-d45b-40d9-8e7d-c68ad040d0c8

Sec. 25-308. - Construction permits.

(a) Generally. (1) No person may construct any facility for use by any provider in any right-of-way without first having obtained a construction permit for the work. Provided, however, that any person constructing any facility in a right-of-way for use by any pass-through carrier or for use as a private or substitute communications system shall comply with the requirements of article VII of this chapter, and shall obtain a minor easement permit and a construction permit before commencing such work. The requirements of this article do not apply to facilities constructed for use by any pass-through carrier or for use as a private or substitute communications system, except the requirements of section 25-315. (2) A construction permit allows the permit holder to construct in that part of the right-of-way described in such permit. (3) A construction permit is valid only for the dates and the area of right-of-way specified in the permit. (4) No permit holder may construct in the rights-of-way beyond the date specified in the permit or outside the area of the right-of-way described in the permit unless such permit holder: a. Submits a supplementary application for another permit before the expiration of the initial permit; and b. Obtains a new permit or a permit extension. (5) Original permits shall be conspicuously displayed at all times at the indicated work site and shall be available for inspection by inspectors and authorized City personnel. If the original permit involves work conducted simultaneously at multiple locations, each location shall display a photocopy of the original permit. (6) A permit holder shall provide notification to all adjacent property owners. The notification shall include a description of the work and the provider's telephone number for citizen inquires. (7) All providers must register with the City and update registration annually prior to applying for a permit to place or maintain facilities in the City right-of-way. The registration process includes: a. The name and address of the provider. b. Provide a certificate of franchise authority issued by the State of Florida pursuant to F.S. Ch. 610, and verify that the City is listed as a service area; or provide evidence of a certificate of authorization from the Florida Public Service Commission; or provide applicant's Florida Department of Revenue Telecom Tax registration number. Also, provide a copy of the current Florida Annual Resale Certificate for Communications Services Tax. If none of the requirements of this subsection are applicable to the provider, then provider shall submit a written response indicating the intent to pay permit fees. c. Provide a certificate of insurance on which the City is named as an additional insured, providing comprehensive general liability coverage, property damage liability coverage, automobile liability coverage, and umbrella coverage as required by City of St. Petersburg Municipal Code (see City Code section 25-304(b), indemnification and hold harmless; insurance). d. Furnish a continuing security fund in the amount of $25,000.00 per the requirements of City of St. Petersburg Municipal Code section 25-311 (Security Fund Requirements). The continuing security fund may be accepted from the provider or its parent company. The continuing security fund will be applicable for all construction permits issued to the provider during the year. e. Provide the name, telephone number and e-mail address of the person who is responsible for providing information on the status of the active work, restoration, and warranty information related to the facility. f. Provide verification that the provider has paid applicable business taxes required per City of St. Petersburg Municipal Code Section 17-124, to the extent permitted by F.S. § 202.24(2)(c)3. (b) Construction permit applications. (1) Application for a construction permit shall be made to the POD using a form to be provided by the POD. (2) The application shall contain, and will be considered complete only upon compliance with the requirements of the following provisions: a. Evidence that the applicant has obtained written authority to apply for a construction permit on behalf of a provider, when applicable; b. All required attachments and dated drawings showing the location and area of the proposed project and the location of all existing and proposed facilities, accompanied by the certification of a registered professional engineer that the drawings, plans and specifications submitted with the application comply with applicable technical codes, rules and regulations. However, per sections 471.003 and 471.037, State statutes (F.S. §§ 471.003 and 471.037), drawings, plans and specifications prepared by regular full-time employees of a provider regulated by the Florida Public Service Commission, Federal Energy Regulatory Commission, or Federal Communications Commission are not required to be sealed and certified by a professional engineer unless required by the Florida Department of Transportation Utility Accommodation Manual Guidelines, as amended; c. Payment of all money lawfully due to the City for: 1. Prior construction permits issued to applicant; and 2. Any loss, damage, or expense suffered by the City as a result of applicant's prior construction in the rights-of-way or any emergency actions taken by the City. (c) Construction permit application for small wireless facilities. (1) Application for a construction permit for wireless systems shall be made to the POD using a form to be provided by the POD. (2) The application shall contain, and will be considered complete only upon compliance with the requirements of the following provisions: a. Evidence that the applicant has obtained written authority to apply for a construction permit on behalf of a provider, when applicable; b. Three sets of plans drawn to a standard engineering scale showing proposed small wireless facilities and all existing facilities. Plans shall include: 1. Latitude/longitude coordinates of site and site address. 2. Current photo documentation of the existing site and immediate surroundings. 3. Rendering showing an in situ stake at the proposed site location on a current site photo, or a typical rendering of the proposed equipment, antenna and pole, when appropriate. 4. Height of pole, height of antenna, and height of tallest existing utility pole as of July 1, 2017 located in the same right-of-way within 500 feet of any proposed new pole or support structure to be placed in the right-of-way. 5. Right-of-way boundaries and width. 6. Width of the parkway. 7. Existing underground and above ground public infrastructure in the vicinity of construction, GIS and/or record drawing data may be provided by the City, subject to disclaimer. 8. A typical utility cross section profile (for all proposed underground work) showing all existing city infrastructure and proposed underground utilities near the work zone with proposed horizontal and vertical utility clearances noted. 9. Adjacent private lot line boundaries near any proposed poles, support structures, or proposed above ground fixed utilities. 10. Location and footage of proposed underground conduit/cable/fiber. 11. Existing public sidewalk and driveway approach locations and width and other surface features in the right-of-way in the vicinity of construction (bicycle paths/trails, poles and/or support structures, signals, utility appurtenances, bus stops, street furnishings/art work, etc.). 12. The roadway clear zone per FDOT Utility Accommodation Manual, and FDOT roadway design standards. 13. Illustration showing the size, height, color, and placement of all proposed and existing above ground fixed utilities or equipment. i. Include a declaration that size, volume, and height of all antennae, ancillary equipment, poles, and support structures meet the requirements of Florida Statutes, and comply with City regulations and design guidelines. ii. For all new above ground facilities provide the equipment designation number which identifies the pole owner, contact information, and location of the equipment. Clarify where this number is found on the infrastructure facility. iii. It is presumed that new poles will not require guy wires. If guy wires are demonstrated by the applicant to be required for above ground facilities they must be shown on the plans when submitted for City review. iv. With the exception of approved ground-mounted equipment installations, all equipment shall be mounted directly to the utility pole unless otherwise directed by the utility pole owner. Show the location and height of any pedestals. 14. The applicant shall provide a description of and sufficient details and specifications to demonstrate compliance with design standards to be utilized to minimize the visual impacts, in accordance with section 25-316 of the City Code. 15. For collocation, provide the name of the owner of the utility pole. i. If the pole is a City owned facility, include a structural plan prepared, signed, and sealed by a professional engineer licensed in the State of Florida certifying that the existing utility pole is structurally sufficient to support the wireless facilities; or, ii. Applicants seeking to collocate a wireless facility on a City owned pole shall provide a make-ready plan for all necessary work to support the small wireless facility, including pole replacement if required, and shall be responsible to perform the make ready work at their sole expense. New poles shall be designed with all conduits internal to the pole, with the exception of wood poles; or, iii. Indicate that the applicant is authorized by the owner of the utility pole to collocate a wireless facility on the owner's utility pole. 16. The applicant shall acknowledge conformance with all standard City engineering right-of-way permit general requirements, city engineering standards and specifications. 17. Include the intended construction schedule for initiation and completion of the work. c. Payment of all money lawfully due to the City for: 1. Prior construction permits issued to applicant; and 2. Any loss, damage, or expense suffered by the City as a result of applicant's prior construction in any rights-of-way of the City or any emergency actions taken by the City. (3) Applicants may file a consolidated application for a single permit for the collocation of up to 30 small wireless facilities. The City retains the authority to separately address small wireless facility collocations within a consolidated application for which incomplete information has been received or which are denied (4) Within 14 days of the filing of a complete application for a small wireless facility construction permit, the POD may request that the proposed location of a small wireless facility be moved to another location in the right-of-way and placed on an alternative utility pole or support structure or may place a new utility pole. If the POD requests an alternative location for a small wireless facility, the City and the applicant may negotiate the alternative location, including any objective design standards, in accordance with section 25-316 of the City Code, and reasonable spacing requirements for ground-based equipment, for 30 days after the POD's request. The alternative location negotiation process described in this subsection shall be implemented and completed in accordance with F.S. § 337.401. (d) Issuance of construction permit; conditions. (1) If the POD determines that the applicant has satisfied the requirements of this article, including but not limited to bonding and insurance requirements, the POD shall issue a construction permit subject to the applicable provisions of the Code. (2) The POD may impose reasonable conditions upon the issuance of the construction permit and the performance of the provider thereunder in order to protect the public health, safety and welfare, to ensure the structural integrity of the rights-of-way, to protect the property and safety of other users of the rights-of-way, and to minimize the disruption and inconvenience to the public. (e) Security funds. When a construction permit is requested, the applicant shall furnish to the POD a security fund meeting the requirements of article VIII of this chapter. (f) Joint applications. Applicants are encouraged to submit joint applications for construction permits to work in the rights-of-way at the same place and time. (g) Annual general permits. The Annual General Permit (AGP) allows a provider to construct, operate, maintain, renew and remove on an annual basis limited facilities as specifically described in the City Operational Standards for AGPs, adopted by the POD, a copy of which shall be made available for public inspection, the terms of which are incorporated by reference with each AGP. The AGCP shall be effective until February 28; however, if a complete and acceptable application is filed after January 1, and an AGCP is issued before February 28 of the same year, the AGCP shall be valid until February 28 of the following calendar year.

(Code 1992, § 25-412; Ord. No. 507-G, § 1, 11-29-2001; Ord. No. 564-G, § 8, 11-7-2002; Ord. No. 570-G, § 1, 12-12-2002; Ord. No. 1001-G, § 13, 11-4-2010; Ord. No. 317-H, § 3, 12-14-2017)

Ask a question about St. Petersburg law

Corpus searches the St. Petersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.