§ 27-311 — Entry, inspection and monitoring
Code of Ordinances, City of St. Petersburg, Florida (Supp. No. 55, Update 2: codified through Ordinance No. 646-H, adopted August 27, 2026) · St. Petersburg City Code § 27-311
Corpus is an independent public-information project, not the official City of St. Petersburg website. Stable reference: corpuslaw.us/code/c0a522da-2222-46cf-8286-736aa56486cd
Sec. 27-311. - Entry, inspection and monitoring.
(a) Entry. All users of the POTW shall allow the POD ready access at all reasonable times to all parts of the premises for the purpose of inspection, observation, records examination, measurement, sampling and testing in accordance with the provisions of this division. The refusal of any user to permit the POD entry to or upon the user's premises for purposes of inspection, sampling effluents or inspecting and copying records or performing such other duties as shall be required by this division shall constitute a significant violation of a condition of the user's IWDP and the terms of this division. Unreasonable delays in allowing the POD access to the user's premises shall be deemed a refusal of entry. (b) Inspection. The POD may inspect the facilities of any user at any time to ascertain whether the intent of this division is being met and all requirements are being complied with. During an inspection, the POD may inquire into the type of industrial processes used to determine the kind and source of discharge to the sewers or receiving waters or facilities for wastewater treatment. Records or information obtained by these inspections shall, in the case of effluent data, be related to any applicable effluent limitations, toxic, pretreatment or IWDP condition and shall be available to the public. (c) Monitoring. The POD shall annually schedule an industrial discharge monitoring program for all SIUs to the POTW. This program shall consist of periodic determinations of the user's wastewater discharge characteristics through the analysis of wastewater samples collected and analyzed by a State certified environmental laboratory utilizing methods outlined in section 27-307(g). (d) Demand monitoring. Demand monitoring of a SIU may be instituted by the City when: (1) City scheduled monitoring indicates a violation of the significant industrial user's IWDP, or there is a significant variation between the results of any City and user analyses of the discharge for any single limited parameter. A significant variation shall be any difference between City and user analyses for the same parameter that is less than half the recorded value (less than 50 percent) or greater than 12 times the recorded value (less than 150 percent). (2) A permittee reports a violation in a periodic compliance report. (3) A periodic compliance report is not submitted within the required time limit. (4) Any other circumstance existing which, reasonably warrants such demand monitoring in order to comply with the objectives of this division. Demand monitoring may continue until the violation or inconsistency has been corrected, or the periodic compliance monitoring has been reported correctly. The costs of all demand monitoring shall be chargeable and billed to the SIU concerned. (e) Monitoring operations. Whenever required to carry out the objectives of this division, the POD shall have the right to set up on the user's property such devices as are reasonably necessary to conduct sampling, inspection, compliance or demand monitoring and/or metering operations. (f) Monitoring facilities. The POD may require any user to install and maintain at the user's expense a suitable control manhole together with necessary approved meters, flow apparatus and other appurtenances in the building sewer and/or internal drainage systems to facilitate observation, sampling and measurement of the wastestream. All devices used to measure the wastewater flow and quality shall comply with DEP-SOP-001/01 (March 31, 2008). Such facility shall be accessible, safely located and constructed in accordance with plans reviewed and accepted by the POD. The monitoring facility shall be situated on the user's premises unless the use of an existing monitoring facility on City property is approved by the POD in writing. Such approval may be revoked at any time and the user required to provide suitable monitoring facilities on his own property. Any temporary or permanent obstruction to safe and easy access to the facility to be inspected and/or sampled shall be promptly removed by the user at the written or verbal request of the POD and shall not be replaced. The costs of clearing such access shall be borne by the user.
(Code 1992, § 27-215; Ord. No. 296-G, § 1, 10-7-1997; Ord. No. 67-H, § 10, 2-21-2013)
Ask a question about St. Petersburg law
Corpus searches the St. Petersburg sections it holds and shows the ones that match, with their citations. Free, no sign-in.
