§ 10-416 — Transportation right-of-way preservation
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee Land Development Code § 10-416
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/215a46da-bd91-4cbd-a1c3-a6db1d4a5998
Sec. 10-416. - Transportation right-of-way preservation.
(a) Purpose and authority. The purposes of this section, adopted in accordance with F.S. §§ 163.3177(6)(b) and 337.273(6) are to: (1) Implement the Tallahassee-Leon County Comprehensive Plan, especially the long range transportation plan and transportation element objectives and policies for future transportation corridors; (2) Alleviate traffic congestion on major roadways and therefore protect and enhance the economy, the environment, and the public health, safety and welfare of the citizens of the city; (3) Maintain established level of service standards to accommodate planned future growth, minimize impacts to existing development, and to assure a safe, efficient and sustainable transportation system for the citizens of the city; (4) Provide a basis for coordinating the provision of transportation facilities with new development on designated corridors where the construction and improvement of transportation facilities is expected; and (5) Protect the rights of landowners whose land is designated for future transportation use. (b) Applicability. These right-of-way setbacks shall apply to all land within or abutting future transportation corridors designated on/in the future right-of-way needs map and the Tallahassee-Leon County long range transportation plan of the Tallahassee-Leon County Comprehensive Plan, as amended. (c) Consistency with the transportation plan and protection from encroachment. All development on planned future corridors designated for improvement in the Tallahassee-Leon County Comprehensive Plan and identified on the future right-of-way needs map and long range transportation plan shall be consistent with the transportation functions of those corridors. Planned future corridors shall be protected from encroachment by structures, parking areas, or drainage facilities, except as may be allowed on an interim basis in accordance with subsection (g). (d) Right-of-way along designated roadway facilities. The following minimum right-of-way shall be required along arterial and collector roadways designated for improvement on/in the future right-of-way needs map and/or the Tallahassee-Leon County long range transportation plan of the Tallahassee-Leon County Comprehensive Plan, as amended. (1) Future Right-of-Way Needs WITH an Existing Corridor Alignment (Assuming flat terrain without side slopes, and 4 lanes with separate bike lanes provided) Functional Classification | ROW (ft.) Blueprint principal arterial | 230 Principal arterial (with frontage road) | 138 Minor arterial (no parking) | 112 Major collector (with parking) | 120 Minor collector (no parking) | 100 (2) Future Right-of-Way Needs WITHOUT an Existing Corridor Alignment Functional Classification | ROW (ft.) Blueprint principal arterial * | 230 Principal arterial | 200 Minor arterial | 176 Major collector | 146 Minor collector | 100 * Planned right-of-way needs for Capital Circle from Centerview to W. Tennessee, as accepted by the Blueprint Intergovernmental Agency on November 19, 2001. (3) Widths represent maximum anticipated right-of-way needs based on roadway functional classification, typical cross sections, and design standards for a range of potential design alternatives. In addition to the number of travel lanes, the following are important considerations in the determination of right-of-way needs for future corridors: a. Space for sidewalks to provide safe and convenient movement of pedestrians. b. The provision of bike lanes or separate bike paths. c. Space for current or future location of utilities so that, when necessary, they can be safely maintained without undue interference with traffic. The utility strip needs to be of sufficient width to allow placement of a water main so that in the case of rupture, neither the roadway pavement nor adjacent property will be damaged. d. Accommodation of stormwater at the surface or in storm drains. e. Accommodation of auxiliary lanes at intersections. f. Placement of trees to improve the aesthetic qualities of the roadway, to shade pedestrians, and improve community appearance. The space needs to be adequate to accommodate tree growth without damaging sidewalks, abutting development, or curb and gutter. g. Allowing for changes in the paved section, utilities, or other modifications, that may be necessary in order to meet unforeseen changes in vehicular, pedestrian, bicycle, or other transportation needs as a result of changes in land use and activity patterns. (4) Alternative widths may be established by the local government, in consultation with other affected agencies, pursuant to an adopted critical area plan or based upon an analysis of existing constraints, community planning objectives, and other considerations unique to the roadway or surrounding land development. (e) Determination of alignment and setbacks. (1) Where an alignment of a designated corridor has been established by engineering study and/or design, all proposed structural improvements shall conform with the building setbacks in that zoning district and such setbacks shall be measured from the identified right-of-way line for the new alignment. (2) Where an alignment has not been established by engineering study and/or design, the applicant may propose, and the city shall establish, an approximate alignment consistent with the need to avoid development encroachment and provide continuity of the corridor, as well as to meet conceptual site planning needs of the project. The generalized widths indicated on the future right-of-way needs table (subsection 10-416(d), above) shall be used to determine an appropriate alignment, except where the city has designated an alternative width pursuant to an adopted critical area plan, an analysis of existing constraints, or community planning objectives. The following techniques shall be considered for maintaining the continuity of the corridor and protecting the corridor from encroachment: a. For existing roads, the future centerline shall be the centerline of the existing right-of-way, except where an alternative centerline alignment would be clearly less harmful to the environment, would displace fewer residents and businesses, or is more technically or financially feasible. On state roads, the public works department shall solicit comments on the proposed alignment from the state department of transportation and review those comments in evaluating the proposed alignment. b. For new roads on new alignments, the public works director shall establish an approximate alignment that maintains the continuity of the corridor and minimizes adverse social, environmental and economic impacts of the transportation project. On state roads, the public works department shall solicit comments on the proposed alignment from the state department of transportation and review those comments in evaluating the proposed alignment. c. The approximate alignment shall be the basis for applying normal setbacks as specified in that zoning district. When the specific alignment is later established through engineering study and design, the setback may be reduced through the established deviation process, provided that such reduction is necessitated solely by the final alignment of the right-of-way. (3) Reduction of rear- and side-yard setbacks may be considered to ensure that structures do not encroach into future transportation corridors. A reduction of the required setback may be approved through the development review committee (DRC) deviation procedure, provided such reduction is necessitated solely by the proposed alignment of the corridor. In the event that a site plan application would normally qualify as a type A site plan, the request of such setback reduction would elevate the request to a type B site plan review to ensure comprehensive consideration of potential impacts. (f) Right-of-way dedication. (1) A property owner may, at any time during the application process for preliminary, conceptual, or final approval of a project (including site plan or plat), voluntarily dedicate lands within the project site to the city, or to the governmental entity with jurisdiction should it be a non-city roadway, that are in the future corridor or right-of-way. Where an alignment has been established by engineering study or design, lands to be dedicated shall be within the designated future right-of-way. Where an alignment has not been established, an approximate alignment shall be established as provided in subsection 10-416(d). (2) Projects proposed adjacent to or abutting a designated future transportation corridor, shall, as a condition of approval, be required to dedicate lands within the project site that are necessary for that right-of-way to the city, or to the governmental entity with jurisdiction should it be a non-city roadway, provided there is a rational nexus between the required dedication of land, the needs of the community, and the impacts of the project on the transportation network due to development. When a development application proposes to generate trips on adjacent roadway facilities (both existing and proposed), the city will generally presume there is a nexus. The following shall also apply: a. Dedication required under this section shall be shown on the site plan and/or recordation on the face of the plat, deed, grant of easement, or other method acceptable to the city, or to the governmental entity with jurisdiction should it be a non-city roadway. Dedication shall be completed prior to issuance of final development order or recording of the final plat. If final approval of the application is denied, the deed or other instrument of dedication shall be voided and returned to the applicant. b. Where a series of approvals are required for a development project, or in the case of a phased development project, the developer may petition the city, or the governmental entity with jurisdiction should it be a non-city roadway, to defer the obligation to dedicate necessary rights-of-way at the time of granting of a subsequent development order approval. As a condition of deferring the obligation to dedicate rights-of-way, which deferral shall be in the sole discretion of the city (or entity with jurisdiction), the city shall require the developer to execute an agreement specifying the amount and timing of the right-of-way dedication. (g) Interim use of reserved land. Interim use of land within a future transportation corridor may be permitted to preserve some economic use of the land until it is needed for transportation purposes. Such uses shall conform to the use provisions of the zoning district and shall be limited to the following: (1) Green space requirements to support the development on the non-dedicated portion of the parcel; (2) The stormwater retention facility may, at the discretion of city and/or FDOT, be incorporated into the design of the future transportation facility retention facilities. Should this option be chosen by the city and/or FDOT, the developer need not relocate the stormwater retention facility provided that the property for the stormwater facility is dedicated to the local government, which will assume maintenance responsibility for the facility, and/or relocate such facility to a regional facility. (h) Incentives. The incentives below may also be provided to landowners who dedicate property determined by the city as necessary for corridor protection. A landowner is not entitled to all of these incentives on any one project. Instead, it is the intent of this provision that these tools (or a combination thereof) be available to the landowner and city staff for development of a written agreement in which the landowner is compensated for the value of land dedicated to the city (or other applicable jurisdiction). Such written agreement shall be completed as a condition of final site plan approval. Incentive (5), however, shall be granted by right to every applicable application. (1) On-site transfer of development rights. If the right-of-way is dedicated to the city, the city may approve the on-site transfer of development rights, based on the gross density or intensity allowable on the site prior to any set-aside for future right-of-way. The transfer will be from land needed for transportation right-of-way to other portions of the site, excluding any land required to be dedicated for site-related improvements. Approval of transfer of development rights may include consideration of deviations from site design standards necessitated by the increased net density or intensity of the portions of the site receiving the transfer of development rights. (2) Clustering of structures. Clustering of structures may be allowed to preserve the full development rights of the property while siting structures to avoid encroachment into the corridor. Clustering of structures under this provision may include deviations to reduce setbacks between buildings within a project site, reduction of buffers within a project site, or deviations from other related site design requirements. This provision is not intended to reduce perimeter buffers designed to ensure compatibility of proposed development with adjacent uses. (3) Urban forest/landscape area. The acreage of dedicated right-of-way may be included in the calculations of greenspace required under chapter 5 of this Code. This provision is not intended to reduce perimeter buffers designed to ensure compatibility of proposed development with adjacent uses, or to eliminate interior landscaping designed for aesthetics and shade. Related standards for landscaping, urban forest, and tree debits/credits are provided in chapter 5 of this Code. (4) Concurrency and/or impact fee credit. The value of the dedicated right-of-way may be eligible as a credit toward the transportation impact fees and/or cost of concurrency mitigation activities triggered by the project, consistent with the City Concurrency Management System Policy and Procedures Manual. (5) Deviation fees or elevated review fees. In the event that a government request for dedication causes the need for specific deviation and/or elevation from type A to type B review, a waiver of the resultant deviation fees and/or the difference between type A and type B site plan fees shall be provided. (i) Economically beneficial use of property. The city may elect to not apply certain provisions of this section to a particular parcel of property if staff determines that application of such provisions would prevent all economically beneficial use of the property. (j) Exceptions. Sidewalks, bicycle facilities, driveway access facilities and public utilities may be placed within the required right-of-way subject to review and written authorization by the department of public works in coordination with the applicable departments and/or facilities providers. Mailboxes shall not be affected by this section. (k) Appeals. Any aggrieved party adversely affected by this section may seek relief under the procedure provided in subsection 9-155(9)(i), regarding formal proceedings for type B site plans.
(Ord. No. 06-O-07AA, § 5, 1-25-2006)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.