§ 17-401 — Permit requirements

Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 17-401

Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/c541527d-c2e8-4a26-ac1d-cf47cd198fdc

Sec. 17-401. - Permit requirements.

(a) Permit required. A person or registrant shall not commence to place or maintain an at-grade facility, below-grade facility, wireline facility, or utility pole not in the public rights-of-way, including wireline backhaul facilities and coaxial or fiber-optic cable that are between wireless structures or utility poles or that are otherwise not immediately adjacent to or directly associated with a particular antenna, in the public rights-of-way until all applicable permits have been issued by the city. The person acknowledges that as a condition of granting permits, the city may impose reasonable conditions governing the placement or maintenance of an at-grade facility, below-grade facility, wireline facility, or utility pole not used for the collocation of small wireless facilities in the public rights-of-way as set forth in F.S. § 337.401, as amended. Permits shall apply only to the areas of the public rights-of-way specifically identified in the permit. As used in this section, the term "facility" shall be used to collectively refer to at-grade facilities, below-grade facilities, and wireline facilities. (b) Permit not required. (1) A person shall be allowed to perform emergency maintenance within the public rights-of-way without first obtaining a permit, provided such work is performed consistent with the 2017 edition of the Florida Department of Transportation Utility Accommodation Manual and all applicable codes, local laws and regulations, and state and federal laws. However, a registrant shall provide prompt notice to the city of the emergency maintenance and, within 30 days of completing the emergency maintenance, apply for an after-the-fact permit in accordance with subsection (c) herein if such activity required a permit under this article. As used in this section, the term "emergency maintenance" means the repair or replacement of an communications facility as a result of a condition that affects the public health, safety or welfare. (2) A person or registrant shall be allowed to perform service restoration to existing aerial wireline communications facilities within the public rights-of-way without first obtaining a permit provided such work is performed consistent with the 2017 edition of the Florida Department of Transportation Utility Accommodation Manual. However, such person or registrant shall provide prompt notice to the city of the service restoration to existing facilities and, within 30 days of completing the service restoration work, apply for an after-the-fact permit in accordance with subsection (c) of this section if such activity required a permit under this article. (3) A person or registrant shall be allowed to perform routine maintenance within the public rights-of-way without first obtaining a permit if the proposed routine maintenance does not involve excavation, the closure of a vehicle lane, parking lane or sidewalk, upon reasonable advance written notice to the city identifying the areas where such maintenance will occur, scope of maintenance, date(s) and duration of work to be performed. If routine maintenance requires the closure of a vehicle lane, a sidewalk or a parking lane, a maintenance of traffic permit shall be required. (4) A person shall be allowed to place or maintain a service drop within the public rights-of-way without first obtaining a permit if such proposed work does not involve excavation, or the closure of a sidewalk, vehicle lane or parking lane. If such placement or maintenance requires the closure of a sidewalk, vehicle lane or parking lane, a maintenance of traffic permit shall be required. (5) A person or registrant shall be allowed to maintain, repair, replace, extend, upgrade or remove existing aerial wireline communications facilities on utility poles or aerial wireline communication facilities between existing wireline communications facility attachments on utility poles by a provider, provided such proposed removal does not involve excavation, closure of a sidewalk, a vehicle lane or parking lane, upon reasonable advance written notice to the city identifying the areas where such replacement or removal will occur and the date(s) and duration of work to be performed. If such work requires the closure of a vehicle lane, sidewalk or parking lane, a maintenance of traffic permit shall be required. (6) A person or registrant shall be allowed to remove utility poles within the public rights-of-way if such proposed removal does not involve excavation or the closure of a vehicle lane, sidewalk or parking lane, upon reasonable advance written notice to the city identifying the areas where such removal will occur and the date(s) and duration of work to be performed. If the removal of a utility pole requires the closure of a vehicle lane, sidewalk or parking lane, a lane closure permit shall be required. (7) The general manager - UUPI may issue an immediate stop work order where any work poses a serious threat to the health, safety or welfare of the public until such time as such serious threat has been abated. (8) A permit is not required if the proposed work is otherwise authorized to be performed without city approval by applicable state or federal laws or regulations or this article. (9) An application for a right-of-way permit or a maintenance of traffic permit for work that involves excavation, closure of a sidewalk, vehicular lane or parking lane, unless the person is performing service restoration to existing facilities, under this section for the placement of communications facilities shall be processed and acted upon consistent with the same timeframes referenced in subsection 17-502(e). (c) Permit application. As part of any permit application to place or maintain an at-grade facility, below-grade facility, wireline facility or utility pole not used to support a small wireless facility, in the public rights-of-way, the person or registrant shall submit a permit application, and supporting documentation, to demonstrate the applicant's compliance with applicable codes and that sets forth, at a minimum, the following: (1) Engineering plan. An engineering plan that includes: a. The type of proposed facility, location of the proposed facility or utility pole, including the dimensions, height, footprint, stealth design and concealment features of the proposed facility or utility pole; and b. The distances between the proposed facility or utility pole and nearby pavement, sidewalks, driveways, ramps, trees, underground utilities and other at-grade and below-grade structures and utilities located nearby within the public rights-of-way but no less than a 50-foot radius of the facility or utility pole location; and c. For utility poles, the Global Positioning System (GPS) coordinates of the proposed utility pole. The GPS coordinates shall be based on the reading from a handheld mobile GPS unit set to Datum NAD 83 or WGS84. GPS coordinates based on Google Earth or similar application may be used where areas of shading occur due to overhead canopy. GPS coordinates shall be provided in decimal degrees at a six decimal point precision; and d. Sufficient specificity demonstrating the facility's compliance with the Florida Building Code, the Florida Department of Transportation's Manual of Minimum Standards and the Utility Accommodation Guide, National Electrical Safety Code and North American Reliability Corporation standards, as amended and as applicable; and e. Trees or landscaping to be removed or impacted upon the placement or maintenance of the proposed facility or utility pole. To the extent permitted by law, the placement or maintenance of the proposed facility or utility pole that results in a tree removal within the canopy road tree protection zones shall provide additional information and documentation in accordance with city land development code sections 5-56, 5-81, 5-83 and 10-302, as amended. To the extent permitted by law, the placement or maintenance of a facility or utility pole that results in a tree removal outside of the canopy road tree protection zone shall provide additional information and documentation in accordance with city land development code sections 5-56 and 5-83, as amended; and f. Attestation that the proposed facility or utility pole is located within the public rights-of-way unless the general manager - UUPI reasonably disagrees, then the applicant must submit a survey. (2) Description of installation or construction. The applicant shall provide a description of the manner in which the facility or utility pole will be installed and/or modified (i.e. anticipated construction methods or techniques). (3) Temporary sidewalk closure plan. The applicant shall provide a temporary sidewalk closure plan, if applicable, to accommodate placement or maintenance of the facility or utility pole. (4) Temporary maintenance of traffic (MOT) plan. The applicant shall provide a temporary traffic lane closure and maintenance of traffic (MOT) plan, if applicable, to accommodate placement or maintenance of the facility or utility pole. An applicant must apply separately to the city traffic engineering division to obtain a MOT permit. (5) Restoration plan and estimated cost of restoration of the public right-of-way. A restoration plan and a good faith estimate of the cost of restoration of the public rights-of-way to the condition prior to commencing work in the public right-of-way. Such good faith estimate shall be accepted by the city unless the city determines such estimated costs are not representative of the actual costs of the restoration of the public rights-of-way. Estimates of the cost to restore the public rights-of-way shall include all costs necessary to restore the public rights-of-way to the condition at the time immediately before the work. Such good faith estimate may include, but shall not be limited to, costs to restore the paving, curbs/gutters, sidewalks, multi-purpose trails, and landscaping. All planted or naturally occurring shrubbery or vegetation, including sod, damaged or destroyed during work in the public rights-of-way shall be replaced. Tree removal shown on the permit shall not be considered damage or impairment to be restored to the original condition provided the person complies with the approved mitigation plan, if any. (6) Timetable for construction or installation. The timetable for construction, placement or maintenance of the proposed facility or utility pole or each phase of the placement or maintenance thereof. (7) Indemnification. A statement shall be included within the permit application that by execution of the application and by applying for the permit, the applicant shall be bound to the city with respect to the indemnification provisions set forth in section 17-310. (8) Airport airspace protection. Applicant shall comply with F.S. ch. 333, and all federal regulations pertaining to airport airspace protections. (9) Attestation. For utility poles that are intended to support a small wireless facilities, the applicant shall provide an attestation by an officer or director of the registrant that a small wireless facility will be collocated on the utility pole and will be used by a wireless service provider to provide service within nine months after the date the application is approved. (10) Additional information as reasonably required for review of permit application. Such additional information as the general manager - UUPI finds reasonably necessary to demonstrate the applicant's compliance with applicable codes, local laws and regulations, and state and federal law with respect to the placement or maintenance of the facility or utility pole that is the subject of the permit application. (d) Application review time frames. An application for a permit for an at-grade facility, below-grade facility, wireline facility and utility pole not intended to support the collocation of small wireless facilities in the public rights-of-way shall be reviewed by the city as follows: (1) Notice of application deficiency. Within 30 days after the date of filing an application for an at-grade facility, below-grade facility, wireline facility, or utility pole not intended to support a small wireless facility, the general manager - UUPI shall determine whether the application is complete. If an application is deemed incomplete, the general manager - UUPI shall notify the applicant by electronic mail and specifically identify the missing information. (2) Application review period. Within 60 days after the date of filing a complete application for an at-grade facility, below-grade facility, wireline facility, or utility pole, the general manager - UUPI shall approve or deny the application. (3) Notice of denial; resubmission. Should the application be denied, the general manager - UUPI shall notify the applicant by electronic mail and specify in writing the basis for denial, including the specific code provisions on which the denial is based. The applicant may cure the deficiencies identified by the general manager - UUPI and resubmit the application within 30 days after the notice of denial is sent. The general manager - UUPI shall approve or deny the revised application within 30 days after the date of filing the application. A denial of a permit may be appealed pursuant to section 17-308.

(Ord. No. 17-O-33AA, § 2, 1-31-2018; Ord. No. 20-O-45, § 17, 12-9-2020; Ord. No. 25-O-28, § 15, 12-10-2025)

Ask a question about Tallahassee law

Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.