§ 17-404 — Waiver of the objective design standards for at-grade facilities, below-grade facilities, wireline facilities and utility poles
Code of General Ordinances of the City of Tallahassee, Florida (Supp. No. 75: codified through Ordinance No. 25-O-28, enacted December 10, 2025) · Tallahassee City Code § 17-404
Corpus is an independent public-information project, not the official City of Tallahassee website. Stable reference: corpuslaw.us/code/cc3d87b5-f91d-46f3-af95-bb093efb59e3
Sec. 17-404. - Waiver of the objective design standards for at-grade facilities, below-grade facilities, wireline facilities and utility poles.
(a) The waiver provisions listed in this subsection apply in those circumstances where a provider's use of the public rights-of-way is impaired by strict application of the requirements of this article. Objective design standards provided in section 17-305 and section 17-403 may be waived by the general manager - UUPI. (b) A request for a waiver shall be filed contemporaneously with the permit application. The request for waiver shall state each section, or subsection, for which a waiver is being sought. A request for a waiver shall include the following information: (1) A detailed explanation, with supporting engineering or other data, as to why a waiver from the requirements of this article is required, including a detailed explanation addressing the relevant criteria to be considered by the general manager - UUPI as provided in subsection (c) and demonstrating the inability to maintain network communications if the waiver is not granted; (2) Distances of the proposed at-grade facility or utility pole from the edge of pavement, sidewalks, and/or multi-purpose trails; (3) Design of the proposed at-grade facility or utility pole with particular reference to achieving compatibility with the surrounding neighborhood and eliminating adverse visual impacts on the surrounding neighborhood; and (4) Any other information the general manager - UUPI may reasonably require to process the request for waiver. (c) The general manager - UUPI shall grant or deny a request for a waiver within 45 days after receiving the request for waiver. The general manager - UUPI shall consider the following criteria when determining whether to grant or deny a waiver: (1) Any special conditions and circumstances affecting the proposed site which prevent compliance with the section, or subsection, for which a waiver is being sought; (2) The compatibility of the proposed waiver communications facility or utility pole with adjacent properties and the surrounding neighborhood; (3) If there is an excessive expense associated with compliance with the section, or subsection, for which a waiver is being sought; or (4) If the proposed waiver preserves to the city flexibility in its management of its public rights-of-way. (d) In granting any waiver, the general manager - UUPI may impose conditions to the extent the general manager - UUPI concludes such conditions are necessary to minimize any adverse effects of the proposed communications facility or utility pole on the surrounding neighborhood, or to protect the health, safety and welfare of the public. (e) Should a request for waiver, and ultimately a permit, be denied by the general manager - UUPI, the denial of the waiver may be appealed in conjunction with an appeal of the permit denial in accordance with section 17-308.
(Ord. No. 17-O-33AA, § 2, 1-31-2018; Ord. No. 20-O-45, § 20, 12-9-2020; Ord. No. 25-O-28, § 17, 12-10-2025)
Ask a question about Tallahassee law
Corpus searches the Tallahassee sections it holds and shows the ones that match, with their citations. Free, no sign-in.
