Sec. 5-4-6. - Permit procedures and requirements.
It shall be unlawful for any owner or developer to perform any land development activities without first meeting the requirements of this article and obtaining a stormwater permit prior to commencing the proposed activity. (a) Permit application requirements. Unless specifically exempted by this article, any owner or developer proposing a land development activity shall submit to the Department a stormwater permit application on a form provided by the Department for that purpose. Unless otherwise exempted by this article, a permit application shall be accompanied by the following items in order to be considered: (1) Stormwater concept plan and consultation meeting certification in accordance with section 5-4-6(2); (2) Stormwater management plan in accordance with section 5-4-6(3); (3) Inspection and maintenance agreement in accordance with section 5-4-6(4), if applicable; and (4) Permit application and plan review fees in accordance with section 5-4-6(5). (b) Stormwater concept plan and consultation meeting. Before any stormwater management permit application is submitted and prior to the preliminary plan review, as required under Title 9, the developer or the developer's representative shall meet with the Department to review the concept plan and to discuss the post-development stormwater management measures necessary for the proposed project, as well as to discuss and assess constraints, opportunities and potential ideas for stormwater management designs before the formal site design engineering is commenced. The following information shall be included in the concept plan which shall be submitted in advance of the meeting: (1) Existing conditions/proposed site plans. Existing conditions and proposed site layout sketch plans, which illustrate at a minimum: existing and proposed topography; perennial and intermittent streams; mapping of predominant soils from soil surveys (when available); boundaries of existing predominant vegetation and proposed limits of clearing and grading; and location of existing and proposed roads, buildings, parking areas and other impervious surfaces. (2) Natural resources inventory. A written and/or graphic inventory of the natural resources at the site and surrounding area of properties adjoining the site as it exists prior to the commencement of the project. This description should include a discussion of soil conditions, forest cover, topography, wetlands, and other native vegetative areas on the site, as well as the location and boundaries of other natural feature protection and conservation areas such as wetlands, lakes, ponds, floodplains, stream buffers and other setbacks (e.g., drinking water well setbacks, septic setbacks, etc.). Particular attention should be paid to environmentally sensitive features that provide particular opportunities or constraints for development. (3) Stormwater management system concept plan. A written or graphic concept plan of the proposed post-development stormwater management system including: preliminary selection and location of proposed structural stormwater controls; location of existing and proposed conveyance systems such as grass channels, swales, and storm drains; flow paths; location of floodplain/floodway limits; relationship of site to upstream and downstream properties and drainages; and preliminary location of proposed stream channel modifications within the site, such as bridge or culvert crossings. If applicable, local watershed plans, the Athens-Clarke County greenspace program or greenway network plan, any park development, and any relevant resource protection plans will be consulted in the discussion of the concept plan. (c) Stormwater management plan requirements. The stormwater management plan shall detail how post-development stormwater runoff will be controlled or managed and how the proposed project will meet the requirements of this article, including the performance criteria set forth in section 5-4-7. This plan shall be in accordance with the criteria established in this section and must be submitted with the stamp and signature of a professional engineer (PE) or landscape architect licensed in the State of Georgia, who must verify that the design of all stormwater management facilities and practices meet the submittal requirements outlined in the submittal checklist(s) found in the Georgia Stormwater Management Manual or as provided for in the Transportation and Public Works Department Technical Standards. The stormwater management plan must ensure that the requirements and criteria in this article are being complied with and that opportunities are being taken to minimize adverse post-development stormwater runoff impacts from the development. The plan shall consist of maps, narrative, and supporting design calculations (hydrologic and hydraulic) for the proposed stormwater management system. The plan shall include all of the information required in the Stormwater Management Site Plan checklist found in the Georgia Stormwater Management Manual or as provided for in the Transportation and Public Works Department Technical Standards. This includes: (1) Common address and legal description of site. (2) Vicinity map. (3) Existing conditions hydrologic analysis. The existing condition hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of existing site conditions with the drainage area boundaries indicated; acreage, soil types and land cover of areas for each sub-drainage areas affected by the project; all perennial and intermittent streams and other surface water features as noted through field investigation; all existing stormwater conveyances and structural control facilities that impact design and/or construction of proposed development; direction of flow and inputs to and exits from the site; analysis of runoff provided by off-site areas upstream of the project site; and methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. For redevelopment sites, predevelopment conditions shall be modeled using the established guidelines determined by the Department for the portion of the site undergoing land development activities. (4) Post-development hydrologic analysis. The post-development hydrologic analysis for stormwater runoff rates, volumes, and velocities, which shall include: a topographic map of developed site conditions with the post-development drainage area boundaries indicated; total area of post-development impervious surfaces and other land cover areas for each sub-drainage area affected by the project; calculations for determining the runoff volumes that need to be addressed for each sub drainage area for the development project to meet the post-development stormwater management performance criteria in section 5-4-7; location and boundaries of proposed natural feature protection and conservation utilized; methodologies, assumptions, site parameters and supporting design calculations used in analyzing the existing conditions site hydrology. (5) Stormwater management system. The description, scaled drawings and design calculations for the proposed post-development stormwater management system, which shall include: A map and/or drawing or sketch of the stormwater management facilities, including the location of nonstructural site design features and the placement of existing and proposed structural stormwater controls, including design water surface elevations, storage volumes available from zero to maximum head, location of inlet and outlets, location of bypass and discharge systems, and all orifice/restrictor sizes; a narrative describing how the selected structural stormwater controls will be appropriate and effective; cross-section and profile drawings and design details for each of the structural stormwater controls in the system, including supporting calculations to show that the facility is designed according to the applicable design criteria; a hydrologic and hydraulic analysis of the stormwater management system for all applicable design storms (including stage-storage or outlet rating curves, and inflow and outflow hydrographs); documentation and supporting calculations to show that the stormwater management system adequately meets the post-development stormwater management performance criteria in section 5-4-7; drawings, design calculations, elevations and hydraulic grade lines for all existing and proposed stormwater conveyance elements including stormwater drains, pipes, culverts, catch basins, channels, swales and areas of overland flow; and where applicable, a narrative describing how the stormwater management system corresponds with any watershed protection plans and/or local greenspace program, greenway network plan, and park development. (6) Post-development downstream flow analysis. A downstream flow analysis will be prepared by the applicant to provide an overview of potential impacts from post development run-off from the site. At a minimum the downstream flow analysis will include: a. A map of each and every point or area along the project site's boundaries at which runoff will exit the property. b. The analysis shall focus on the portion of the drainage channel or watercourse immediately downstream from the project. This area shall extend downstream from the project to a point in the drainage area where the project area is ten percent of the total downstream drainage area. c. Delineation of all downstream structures and property adjacent or within the flow path of the downstream flow analysis. d. Identification of known flooding problems from Athens-Clarke County Stormwater Master Plan or other sources. e. If determined through this preliminary review of the items above that the potential exists for downstream flooding resulting from post development conditions, the Director of the Department can require the applicant to conduct and submit a downstream hydrologic assessment in accordance with the criteria listed in the Georgia Stormwater Management Manual criteria or as provided for in the Transportation and Public Works Department Technical Standards for post development downstream analysis. (7) Reserved. (8) Landscaping and open space plan. A detailed landscaping and vegetation plan describing the woody and herbaceous vegetation that will be used within and adjacent to stormwater management facilities and practices. The landscaping plan must also include: the arrangement of planted areas, natural and greenspace areas and other landscaped features on the site plan; information necessary to construct the landscaping elements shown on the plan drawings; descriptions and standards for the methods, materials and vegetation that are to be used in the construction; density of plantings; descriptions of the stabilization and management techniques used to establish vegetation; and a description of who will be responsible for ongoing maintenance of vegetation for the stormwater management facility and what practices will be employed to ensure that adequate vegetative cover is preserved. (9) Operations and maintenance plan. Detailed description of ongoing operations and maintenance procedures for stormwater management facilities and practices to ensure their continued function as designed and constructed or preserved. These plans will identify the parts or components of a stormwater management facility or practice that need to be regularly or periodically inspected and maintained, and the equipment and skills or training necessary. The plan shall include an inspection and maintenance schedule, maintenance tasks, responsible parties for maintenance, funding, access and safety issues. Provisions for the periodic review and evaluation of the effectiveness of the maintenance program and the need for revisions or additional maintenance procedures shall be included in the plan. (10) Maintenance access easements. The applicant must ensure access from public right-of-way to stormwater management facilities and practices requiring regular maintenance at the site for the purpose of inspection and repair by securing all the maintenance access easements needed on a permanent basis. Such access shall be sufficient for all necessary equipment for maintenance activities. Upon final inspection and approval, a plat or document indicating that such easements exist shall be recorded and shall remain in effect even with the transfer of title of the property. (11) Inspection and maintenance agreements. Unless an on-site stormwater management facility or practice is dedicated to and accepted by the Unified Government of Athens-Clarke County as provided in section 5-4-6(d), the applicant must execute an easement and an inspection and maintenance agreement binding on all subsequent owners of land served by an on-site stormwater management facility or practice in accordance section 5-4-6(d). (12) Evidence of acquisition of applicable local and non-local permits. The applicant shall certify and provide documentation to the Department that all other applicable environmental permits have been acquired for the site prior to approval of the stormwater management plan. (d) Stormwater management inspection and maintenance agreements. Prior to the issuance of any permit for a land development activity requiring a stormwater management facility or practice hereunder and for which the Department requires ongoing maintenance, the applicant or owner of the site must, unless an on-site stormwater management facility or practice is dedicated to and accepted by the Unified Government of Athens-Clarke County, execute an inspection and maintenance agreement, if applicable, that shall be binding on all subsequent owners of the site. The inspection and maintenance agreement, if applicable, must be approved by the Department prior to plan approval, and recorded in the deed records upon final plat approval. The inspection and maintenance agreement shall identify by name or official title the person(s) responsible for carrying out the inspection and maintenance. Responsibility for the operation and maintenance of the stormwater management facility or practice, unless assumed by a governmental agency, shall remain with the property owner and shall pass to any successor owner. If portions of the land are sold or otherwise transferred, legally binding arrangements shall be made to pass the inspection and maintenance responsibility to the appropriate successors in title. These arrangements shall designate, for each portion of the site, the person to be permanently responsible for its inspection and maintenance. As part of the inspection and maintenance agreement, a schedule shall be developed for when and how often routine inspection and maintenance will occur to ensure proper function of the stormwater management facility or practice. The agreement shall also include plans for annual inspections to ensure proper performance of the facility between scheduled maintenance and shall also include remedies for the default thereof. Copies of routine inspection summaries will be submitted in accordance with approved maintenance plan. In addition to enforcing the terms of the inspection and maintenance agreement, the Department may also enforce all of the provisions for ongoing inspection and maintenance in section 5-4-9 of this article. The Mayor and Commission of Athens-Clarke County, in lieu of an inspection and maintenance agreement, may consider dedication to the Unified Government of Athens-Clarke County of any existing or future stormwater management facility for maintenance, upon recommendation by the Director of the Department, provided such facility meets all the requirements of this article and includes adequate and perpetual access and sufficient area, by easement or otherwise, for inspection and regular maintenance. (e) Application review fees. The fee for review and inspection of any stormwater management application shall be based on the fee schedule in Section 7-1-560. The fee shall be paid by the applicant prior to the issuance of the stormwater management permit for the development. (f) Modifications for off-site facilities. The stormwater management plan for each land development project shall provide for stormwater management measures located on the site of the project, unless provisions are made to manage stormwater by an off-site or regional facility. The off-site or regional facility must be located on property legally dedicated for the purpose, must be designed and adequately sized to provide a level of stormwater quantity and quality control that is equal to or greater than that which would be afforded by on-site practices and there must be a legally-obligated entity responsible for long-term operation and maintenance of the off-site or regional stormwater facility. In addition, on-site measures shall be implemented, where necessary, to protect upstream and downstream properties and drainage channels from the site to the off-site facility. A stormwater management plan must be submitted to the Department, which shows the adequacy of the off-site or regional facility. To be eligible for a modification, the applicant must demonstrate to the satisfaction of the Department that the use of an off-site or regional facility will not result in the following impacts to upstream or downstream areas: (1) Increased threat of flood damage to public health, life, and property; (2) Deterioration of existing culverts, bridges, dams, and other structures; (3) Accelerated streambank or streambed erosion or siltation; (4) Degradation of in-stream biological functions or habitat; or (5) Water quality impairment in violation of state water quality standards, and/or violation of any state or federal regulations.
(Ord. of 6-1-2004, § 1; Ord. of 11-3-2009, § 1; Ord. of 4-7-2020, § 4)
Ask a question about Athens-Clarke County law
Corpus searches the Athens-Clarke County sections it holds and shows the ones that match, with their citations. Free, no sign-in.