Sec. 5-4-7. - Post-development stormwater management performance criteria.

(a) The following performance criteria shall be applicable to all stormwater management plans, unless otherwise provided for in this article: (1) Water quality and runoff reduction. All stormwater runoff generated from a site shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if: a. For projects with a stormwater concept meeting before December 6, 2020, the system is designed to treat the prescribed water quality treatment volume from the site, which is defined as the runoff volume resulting from the first 1.2 inches of rainfall from a site, or it retains the first 1.0 inch of rainfall onsite using approved runoff reduction methods; b. For projects with a stormwater concept meeting on or after December 6, 2020, the stormwater management system shall be designed to retain the first 1.0 inch of rainfall on the site, to the maximum extent practicable. The determination by the MS4 that it is infeasible to apply the runoff reduction standard in part or in whole or that an alternate strategy will reduce pollutant loadings from the site to the maximum extent practicable must be documented with the site plan review documents. If the entire 1.0 inch of rainfall cannot be retained onsite using runoff reduction methods, the remaining runoff from a 1.2 inch rainfall event must be treated to remove at least 80% of the calculated average annual post-development total suspended solids (TSS) load or equivalent as designed in the Georgia Stormwater Management Manual or the Transportation and Public Works Department Technical Standards. Treatment of runoff from hotspots on the site such as fueling stations requires special attention to address the expected pollutants of concern. c. Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual or as provided for in the Transportation and Public Works Department Technical Standards; and d. Runoff from hotspot land uses and activities identified by the Department are adequately treated and addressed through the use of appropriate structural stormwater controls, nonstructural practices and pollution prevention practices. (2) Stream channel and aquatic habitat protection. Protection of stream channels from bank and bed erosion and degradation shall be provided by using all of the following three approaches: a. Preservation, restoration and/or reforestation with native vegetation of the applicable stream buffer; b. Twenty-four-hour extended detention storage of all stormwater runoff generated from a site by the one-year, 24-hour return frequency storm event; and c. Post development erosion prevention measures such as energy dissipation and velocity control. These measures shall take into consideration location and size of outlet control structure. (3) Overbank flood protection. Downstream overbank flood protection and property protection shall be provided by controlling the site's post-development peak discharge rate to the pre-development rate for the 25-year, 24-hour return frequency storm event. If control of the one-year, 24-hour storm under section 5-4-7(3) is exempted, then peak discharge rate attenuation of the two-year through the 25-year return frequency storm event must be provided. (4) Extreme flooding protection. Extreme flood and public safety protection shall be provided by controlling and safely conveying the site's 100-year, 24-hour return frequency storm event such that flooding is not exacerbated. (5) Structural stormwater controls. All structural stormwater management facilities shall be selected and designed using the appropriate criteria from the Georgia Stormwater Management Manual and any local addenda. All structural stormwater controls must be designed appropriately to meet their intended function. For other structural stormwater controls not included in the Georgia Stormwater Management Manual or the Transportation and Public Works Department Technical Standards, or for which pollutant removal rates have not been provided, the effectiveness and pollutant removal of the structural control must be documented through prior studies, literature reviews, or other means and receive approval from the Department before being included in the design of a stormwater management system. Applicants shall consult the Georgia Stormwater Management Manual for guidance on the factors that determine site design feasibility when selecting and locating a structural stormwater control. (6) Stormwater credits for nonstructural measures. The use of one or more site design measures by the applicant may allow for a reduction in the water quality treatment volume required under section 5-4-7(1). The applicant may, if approved by the Department, take credit for the use of stormwater better site design practices and reduce the water quality volume requirement. Credits shall be made available pursuant to the provisions governing credits in the Georgia Stormwater Management Manual or as provided for in the Transportation and Public Works Department Technical Standards. (7) Drainage system guidelines. Stormwater conveyance facilities, which may include, but are not limited to, culverts, stormwater drainage pipes, catch basins, drop inlets, junction boxes, headwalls, gutter, swales, channels, ditches, and energy dissipaters shall be provided when necessary for the protection of public right-of-way, public properties, and private properties adjoining project sites and/or public right-of-ways. Stormwater conveyance facilities that are designed to carry runoff from more than one parcel, existing or proposed, shall meet the following requirements: a. Methods to calculate stormwater flows shall be in accordance with the stormwater design manual; b. All culverts, pipe systems and open channel flow systems shall be sized in accordance with the stormwater management plan using the methods included in the stormwater design manual; and c. Design and construction of stormwater conveyance facilities shall be in accordance with the criteria and specifications found in the stormwater design manual. (8) Dam design guidelines. Any land disturbing activity that involves a site which proposes a dam shall comply with the provisions of O.C.G.A. § 12-5-370 et seq. (the "Georgia Safe Dams Act") and the rules for dam safety promulgated thereunder, as applicable. (b) The Transportation and Public Works Director may determine that redevelopment on a developed site that includes all stormwater management measures necessary to satisfy all of the postdevelopment stormwater management performance criteria as provided in section 5-4-7(a) is fully or partially infeasible. (1) An applicant for such an infeasibility determination shall provide justification demonstrating how the redevelopment satisfies the Better Site Design and smart growth principles, as defined in the Georgia Stormwater Management Manual or as provided for in the Transportation and Public Works Department Technical Standards. The Transportation and Public Works Director shall consider the application and existing site conditions to determine full or partial infeasibility on a site by site basis. At least one of the following criteria shall be satisfied: a. The redevelopment site is situated on parcel(s) with impervious cover in excess of 40 percent of the maximum allowable lot coverage for the applicable zoning category, as calculated considering only the adjusted tract acreage; b. The redevelopment site includes mitigating circumstances including shallow bedrock, contaminated soils, high groundwater, or presence of existing utilities; or c. Conformance with post-development stormwater management performance criteria on the redevelopment site would damage a community resource or impact threatened or endangered species habitat. (2) Only redevelopment sites that satisfy the following additional criteria will be eligible to be determined partially or fully infeasible for post-development performance criteria as provided in section 5-4-7(a). a. The site is situated in an area in the I (Industrial), E (Employment), C (Commercial) or RM (Mixed-Density Residential) zones as designated and established in Title 8, entitled Zoning and Development Standards of this Code together with any churches or schools permitted in any other zone by special use permit; b. The site is not classified as a hotspot; and c. The site is not upstream of a known public flooding problem as identified by the Department of Transportation and Public Works in the Area-Wide Stormwater Master Plan, as amended from time to time, on file and available for public inspection at the Department of Transportation and Public Works. (c) Any site determined to be fully or partially infeasible for post-development performance criteria for post-development performance criteria according to section 5-4-7(b) shall be exempt from satisfying any criteria deemed infeasible by the Transportation and Public Works Director. In such case, and unless otherwise provided for in this article, the following post-development stormwater management performance criteria shall apply at a minimum: (1) Existing deficiencies. The following measures to mitigate existing deficiencies on the parcel(s) shall be part of the stormwater management plan. a. Existing erosional areas shall be stabilized; and b. Existing structural stormwater control(s) shall be restored to conform to the original design or to an alternate design that more closely conforms to current standards. (2) Special standards for replaced impervious surface area. All stormwater runoff generated from the replaced impervious surface shall be adequately treated before discharge. A stormwater management system will be presumed to comply with this standard if: a. It is designed to treat the REIS volume from the site in a way that minimizes this pollutant loading; and b. Appropriate structural stormwater controls or nonstructural practices are selected, designed, constructed or preserved, and maintained according to the specific criteria in the Georgia Stormwater Management Manual or as provided for in the Transportation and Public Works Department Technical Standards. c. The design shall utilize green infrastructure, low impact design, and runoff reduction to the maximum extent practicable. All stormwater runoff that is either infiltrated or evaporated may be counted as double in treating the REIS volume requirements. (3) Reduction of existing impervious surface areas. When the existing impervious surface area of a site is removed and replaced with a predevelopment soil hydrologic equivalent (Type B soil with a curve number equivalent to a meadow or woods in good condition), and a stormwater management permit is obtained for such work under this Chapter, the following standards apply: a. If the site's impervious surface is reduced by 20 percent to any given outlet, the requirements of section 5-4-7(c)(2) do not apply. b. If the site's impervious surface is reduced by less than 20 percent to any given outlet, the requirements of section 5-4-7(c)(2) are applied in proportion to the amount of impervious surface removed. For example, removal of ten percent of the site's impervious surface area to any given outlet would reduce the requirements of section 5-4-7(c)(2) by 50 percent. (4) Additional impervious surface less than 5,000 square feet. Many redevelopment projects involve not only the replacement of impervious surfaces but also the net creation of impervious surfaces. These new surfaces can impact streams and neighboring properties. All stormwater runoff generated from the new impervious surface shall be adequately treated before discharge. It will be presumed that a stormwater management system complies with this requirement if it is sized to provide treatment as defined in subsection (a)(1) of this section. (5) Additional impervious surface greater than 5,000 square feet. If the redevelopment results in a net increase of greater than 5,000 square feet of impervious surface, all stormwater runoff generated from the new impervious surface shall adhere to the post-development stormwater management performance criteria as specified in section 5-4-7(a).

(Ord. of 6-1-2004, § 1; Ord. of 12-5-2017(3), §§ 6—8; Ord. of 2-5-2019(1), § 8; Ord. of 4-7-2020, §§ 5—8)