§ 8-6-6 — Standards for activities within the floodplains
Code of the Unified Government of Athens-Clarke County, Georgia (Supp. No. 48, codified through Ordinance of May 5, 2026) · Athens-Clarke County Code § 8-6-6
Corpus is an independent public-information project, not the official City of Athens-Clarke County website. Stable reference: corpuslaw.us/code/fc39b657-1d14-4fcf-9804-5759632a4e7a
Sec. 8-6-6. - Standards for activities within the floodplains.
(a) Permitted activities. Applications for environmental areas review permits where the proposed activity or activities is proposed to occur within a floodplain shall be evaluated against the following criteria: (1) Subdivisions of land: All lots modified by lot line adjustments or new lots created from existing lots which contain protected environmental areas must demonstrate that the proposed lots contain a buildable area of sufficient size to accommodate a single-family dwelling, regardless of the extent of the uses allowed by the underlying zoning. The demonstration of the buildable area does not establish or secure the ability of the owner or subsequent owners to construct on the site. (2) Standards for water treatment or purification: a. The restoration or enhancement of floodplains must meet the federal and state standards and be conducted in accordance with state and federal standards and guidelines. b. Measures to remove or abate nuisances or any other violation of state or federal statute, administrative rule or Athens-Clarke County ordinance must demonstrate that manner of removal or abatement does not create a further negative impact on the floodplain or violate additional Athens-Clarke County ordinances. (3) New transportation or utility stream crossings must meet the following criteria: a. Water and sewerlines must run parallel to existing streams and rivers. The location of water and sewerlines shall be located as far from the bank as the physical constraints of the site allows. b. All crossings shall be made at a right angle unless demonstrated that a right angle is not feasible. c. An installation and maintenance plan for the transportation or utility stream crossing shall accompany the environmental areas review application. d. Construction of transportation and utilities shall meet all requirements of the Erosion and Sedimentation Control Act as amended. e. Utilities shall not impair the drinking quality of the water, as defined by the Federal Clean Water Act, as amended. (4) Excavation and fill: Any modification to the floodplain that includes excavation and fill must demonstrate that it has satisfied the requirements established in Chapter 8-2 (Flood Protection) including, but not limited to the requirement for adjustments to the FEMA map. a. No net fill in any floodplain is allowed. All fill placed in a floodplain shall be balanced with at least an equal amount of soil material removal. Any modification to the floodplain must satisfy the conditions established in Chapter 8-2 (Flood Protection). b. Excavation areas shall not exceed fill areas by more than 50 percent of the square footage of the proposed improvements. c. Installation and maintenance of the facilities shall be such as to protect the integrity of the floodplain area. d. Excavation to balance a fill shall be located on the same parcel as the fill. If it is demonstrated that if such excavation is not possible, and the director of Athens-Clarke County Public Works Department concurs, then the excavation shall be located in the same drainage basin and as close as possible to the fill site, and the proposed excavation must not increase the flood impacts for surrounding properties as determined through hydrologic and hydraulic analysis. e. Temporary fills which are necessary for construction may be permitted during construction and must be located upslope except in association with permitted uses and removed prior to the issuance of a certificate of occupancy or the initiation of the use of the parcel. f. New culverts, stream crossings and transportation projects shall be designed as balanced cut and fill projects or designed not to raise the design flood elevation. Such projects shall be designed to minimize the area of fill in floodplains and to minimize erosive velocities of water as defined by the Georgia Erosion and Sediment Control Manual. Stream crossings shall be perpendicular to the protected stream. g. Excavation and fill required for the construction of detention facilities, levees, or other such structures shall be designed to reduce or mitigate flood impacts and improve the conditions of the environmental areas. Levees shall not be used to create additional buildable areas. h. These standards are in addition to and do not supersede those actions required in Chapter 8-2 (Floodplain Protection). (5) Buildings and construction: a. Additions to existing buildings or structures must not exceed ten percent of the current square footage of the total square footage of all of the buildings or structures located within the floodplain and must meet the requirements of Chapter 8-2 (Flood Protection). Provided that the applicant demonstrates that the proposed additions and those additions constructed with benefit of all previous environmental areas review permits are less than or equal to ten percent of the square footage of the sum of the square footage of those buildings and structures extant at the time of the first environmental areas review permit. b. The construction of one single-family dwelling on existing lot of record provided that the following criteria are met: 1. The dwelling shall be located within the buildable area on the parcel. The available buildable area on the subject property shall be used for the proposed construction before any construction is permitted in the protected environmental area. 2. Septic tanks shall not be located within the floodplain. 3. Septic tank drainfields and other forms of on-site wastewater treatment shall not be located within the floodplain. 4. Best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resulting sedimentation, which are consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia," published by the State Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity is permitted. 5. The stripping of vegetation, regrading, and other development activities shall be conducted in a manner to minimize erosion and shall be limited to that necessary for the construction of the single-family dwelling. 6. Cut and fill operations shall be limited to that necessary for the construction of the single-family dwelling. 7. Development plans must conform to topography and soil type, so as to create the lowest practicable erosion potential. 8. Whenever feasible, natural vegetation shall be retained, protected and supplemented. 9. The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum. 10. Disturbed soil shall be stabilized as in accordance with Georgia Manual for Sediment and Erosion Control. 11. Temporary vegetation or mulching shall be employed to protect exposed critical areas during the development. 12. To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et seq. 13. Adequate provisions must be provided to minimize damage from surface water to cut face of excavation or the sloping surfaces of fills. 14. Cuts and fills may not endanger adjoining property. 15. Fills may not encroach upon natural watercourses or constructed channels so as to adversely affect other property owners. 16. Grading equipment must cross flowing streams by the means of bridges or culverts, except where such methods are not feasible; provided, in any case, that such crossings must be kept to a minimum. 17. Land-disturbing activity plans for erosion and sedimentation control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on site or preclude sedimentation of adjacent waters beyond the levels specified in O.C.G.A. § 12-7-6(a). 18. The impervious area footprint of the house and accessory structures within a floodplain must be less than 2,500 square feet. (6) Criteria for the clearing of vegetation: a. Native vegetation shall be retained, protected and supplemented within the flood plain. Limited non-mechanical clearing of vegetation is allowed within the flood plain, provided that the vegetation removed is less than six-inch (DBH) and is not within 25 feet of the stream bank. b. No removal of living trees shall be removed within 25 feet of the bank. (7) Impervious surfaces: Increases in impervious surface, including increases to or construction of parking lots, may be located at an elevation no lower than one foot below the elevation of the 100-year floodplain. (b) Prohibited activities within floodplains. (1) Handling areas for the receiving and storage of hazardous waste as defined by the State of Georgia. (2) Hazardous waste and solid waste landfills. (3) Agricultural waste pits. (4) New buildings, new structures or other impervious improvements that encroach into the floodplain that require a grading permit or a building permit except as specified in 8-6-6(a)(5).
(Ord. of 11-3-2004, § 1; Ord. of 8-4-2015, § 3)
Ask a question about Athens-Clarke County law
Corpus searches the Athens-Clarke County sections it holds and shows the ones that match, with their citations. Free, no sign-in.
