For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 8-6-7 — Standards for activities within the riparian buffers

Code of the Unified Government of Athens-Clarke County, Georgia (Supp. No. 48, codified through Ordinance of May 5, 2026) · Athens-Clarke County Code § 8-6-7

Corpus is an independent public-information project, not the official City of Athens-Clarke County website. Stable reference: corpuslaw.us/code/696f6921-db08-44d4-9e37-fe87f7283513

Sec. 8-6-7. - Standards for activities within the riparian buffers.

(a) Permitted activities. (1) Subdivisions of land: All lots modified by lot line adjustments or new lots created from existing lots which contain protected environmental areas must demonstrate that the proposed lots contain a buildable area of sufficient size to accommodate a single-family dwelling, regardless of the extent of the uses allowed by the underlying zoning. The demonstration of the buildable area does not establish or secure the ability of the owner or subsequent owners to construct on the site. (2) Standards for water treatment facilities or purification facilities: a. The restoration or enhancement of riparian buffers must meet the federal and state standards and be conducted in accordance with state and federal standards and guidelines. b. Measures to remove or abate nuisances or any other violation of state or federal statute, administrative rule or Athens-Clarke County ordinance must demonstrate that manner of removal or abatement does not create a further negative impact on the riparian buffers or violate additional Athens-Clarke County ordinances. (3) New transportation or utility stream crossings must meet the following criteria: a. Water and sewerlines must run parallel to existing streams and rivers. The location of water and sewerlines shall be located as far from the bank as the physical constraints of the site allows. b. All crossings shall be made at a right angle unless demonstrated that a right angle is not feasible. c. The installation and maintenance of the facility shall be conducted in such a manner as to protect the integrity of the floodplain area. An installation and maintenance plan shall accompany the environmental areas review application. d. Construction of transportation and utilities shall meet all requirements of the Erosion and Sedimentation Control Act as amended. e. Utilities shall not impair the drinking quality of the water, as defined by the Federal Clean Water Act, as amended. (4) The construction of one single-family dwelling on existing lot of record provided that the following criteria are met: a. If the proposed construction is located within a protected river corridor, the dwelling shall be located on a lot that is no less than two acres in size. b. The dwelling shall be located within the buildable area on the parcel. The available buildable area on the subject property shall be used for the proposed construction before any construction is permitted in the protected environmental area. c. Septic tanks shall not be located within the riparian buffer. d. Septic tank drainfields and other forms of on-site wastewater treatment shall not be located within the riparian buffer. e. Best management practices, including sound conservation and engineering practices to prevent and minimize erosion and resulting sedimentation, which are consistent with, and no less stringent than, those practices contained in the "Manual for Erosion and Sediment Control in Georgia," published by the State Soil and Water Conservation Commission as of January 1 of the year in which the land-disturbing activity is permitted. f. The stripping of vegetation, regrading, and other development activities shall be conducted in a manner to minimize erosion and shall be limited to that necessary for the construction of the single-family dwelling. g. Cut and fill operations shall be limited to that necessary for the construction of the single-family dwelling. h. Development plans must conform to topography and soil type, so as to create the lowest practicable erosion potential. i. Whenever feasible, natural vegetation shall be retained, protected and supplemented. j. The disturbed area and the duration of exposure to erosive elements shall be kept to a practicable minimum. k. Disturbed soil shall be stabilized as in accordance with Georgia Manual for Sediment and Erosion Control. l. Temporary vegetation or mulching shall be employed to protect exposed critical areas during the development. m. To the extent necessary, sediment in run-off water must be trapped by the use of debris basins, sediment basins, silt traps, or similar measures until the disturbed area is stabilized. As used in this paragraph, a disturbed area is stabilized when it is brought to a condition of continuous compliance with the requirements of O.C.G.A. § 12-7-1 et seq. n. Adequate provisions must be provided to minimize damage from surface water to cut face of excavation or the sloping surfaces of fills. o. Cuts and fills may not endanger adjoining property. p. Fills may not encroach upon natural watercourses or constructed channels so as to adversely affect other property owners. q. Grading equipment must cross flowing streams by the means of bridges or culverts, except where such methods are not feasible; provided, in any case, that such crossings must be kept to a minimum. r. Land-disturbing activity plans for erosion and sedimentation control shall include provisions for treatment or control of any source of sediments and adequate sedimentation control facilities to retain sediments on site or preclude sedimentation of adjacent waters beyond the levels specified in O.C.G.A. § 12-7-6(a). s. The impervious area footprint of the house and accessory structures within a riparian buffer must be less than 2,500 square feet. (5) Criteria for clearing vegetation within the riparian buffer for permitted activities: a. Native vegetation shall be retained, protected, and supplemented within the environmental area. Limited non-mechanical clearing of vegetation is allowed within riparian buffer, provided that the vegetation removed is less than six-inch (DBH) and is not within 25 feet of the stream bank. b. No removal of living trees within 25 feet of the stream bank. (b) Prohibited activities within riparian buffers. (1) Any new structures, land disturbance activities, or impervious surfaces other than those specifically permitted in this chapter. (2) Handling areas for the receiving and storage of hazardous waste as defined by the State of Georgia. (3) Hazardous waste and solid waste landfills. (4) Agricultural waste pits. (5) Parking lots. (6) Those activities not specifically listed in 8-6-7(a).

(Ord. of 11-3-2004, § 1; Ord. of 8-4-2015, § 4)

Ask a question about Athens-Clarke County law

Corpus searches the Athens-Clarke County sections it holds and shows the ones that match, with their citations. Free, no sign-in.