For AI agents: read the machine-readable documentation index at /llms.txt or the single-file full reference at /llms-full.txt.

§ 103.3 — PLANS AND SPECIFICATIONS

Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. D, ch. I, § 103.3

Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/58a3fe8c-85a1-441c-8446-d04133618e26

103.3— - PLANS AND SPECIFICATIONS

(a) When required by the Director of the Bureau of Buildings, two or more copies of specifications and drawings to scale with sufficient clarity and detail to indicate the nature and character of the work shall accompany every application. Such drawings and specifications shall contain name and address of designer and information in the form of notes or otherwise, as to the quality of materials, where quality is essential to conformity with this Code. Such information shall be specific, and this Code shall not be cited as a whole or in part, nor shall the term "legal" or its equivalent be used, as a substitute for specific information. The Director of the Bureau of Buildings may require details, computations, stress diagrams and other data necessary to describe the construction and basis of calculations and they shall bear the signature of the person responsible for the design. (b) It shall be the responsibility of the designer of a building to schedule required fire resistance rating of walls, floors, ceilings and partitions where duct penetrations are made and to include such information on plans. Plans shall indicate the location of all required automatic fire doors and dampers. (c) Plans and specifications bearing the official seal of a professional engineer or architect entitled to practice in the State of Georgia shall be required: 1. For any heating system appliance in any building having a total required input in excess of 500,000 Btu per hour. EXCEPTION: [1.] Listed package appliances up to one million Btu/hr. for exact replacement with no system alterations, and process loads up to one million Btu/hr. with package appliances. 2. For any air conditioning or refrigerating system in excess of 25 tons. Such plans and specifications shall have the meaning of certifying to the best of their knowledge and interpretation that plans and specifications are in accordance with the requirements of this Code. (d) Where applications are made by conditioned air contractors in accordance with Section 103.4, such applications for permits shall include plans of all systems and shall contain heat loss and heat gain data. Such heat loss and heat gain data shall be indicated on the plans and application. However, plans for single family dwellings having less than 175,000 Btu/hr. heating input or 60,000 Btu/hr. cooling and serving less than 25,000 cu.ft. are not required if heat loss/heat gain data is provided on the application.

Ask a question about Atlanta law

Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.