§ 104.3 — PERMITS REQUIRED UNDER THIS CODE AND FEE SCHEDULES
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code, App. D, ch. I, § 104.3
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/417237c0-cf40-46f3-9980-f18d969a6bee
104.3— - PERMITS REQUIRED UNDER THIS CODE AND FEE SCHEDULES
The following equipment or systems are required to be permitted in accordance with this Code, and Table I Fee Schedules. (a) Table I. City of Atlanta Heating, Ventilating and Air Conditioning Division Schedule of Permit Fees No Heating, Ventilating and Air Conditioning permit shall be valid until the fees prescribed in this section have been paid to the City of Atlanta. Schedule of permit fees is as follows: 1. In all cases the minimum fee shall be $50.00 per permit. 2. Heating Systems/Separate Vents, Stacks, and Chimneys. a. Up to 125,000 BTU Input .....$35.00 b. 125,001—199,999 BTU Input .....40.00 c. 200,000—299,999 BTU Input .....50.00 d. 300,000—599,999 BTU Input .....70.00 e. 600,000—999,999 BTU Input .....80.00 f. 1,000,000—1,999,999 BTU Input .....90.00 g. 2,000,000—3,999,999 BTU Input .....130.00 h. 4,000,000—7,999,999 BTU Input .....160.00 i. 8,000,000—11,999,999 BTU Input .....190.00 j. 12,000,000—15,999,999 BTU Input .....220.00 k. Plus $1.00 per 1,000 over 16,000,000 3. Cooling Systems. a. Up to 35,999 BTU/HR or 2 TONS .....$25.00 b. 36,000—47,999 BTU/HR or 3 TONS .....30.00 c. 48,000—59,999 BTU/HR or 4 TONS .....40.00 d. 60,000—119,999 BTU/HR or 5 TONS .....50.00 e. 120,000—179,999 BTU/HR or 10 TONS .....70.00 f. 180,000—239,999 BTU/HR or 15 TONS .....90.00 g. 240,000—599,999 BTU/HR or 20 TONS .....105.00 h. 600,000—1,199,999 BTU/HR or 50 TONS .....160.00 i. 1,200,000 BTU/HR or 100 TONS .....190.00 j. Plus $1.50 per ton over 100 tons. 4. Duct Alterations .....$50.00 5. Public Safety Inspections .....50.00 6. Change of Contractor/Company .....50.00 7. Grease Hoods (Face Area of Hood in Sq. Ft.) a. Up to 10 .....$25.00 b. 10.1—15 .....30.00 c. 15.1—20 .....40.00 d. 20.1—25 .....50.00 e. 25.1—45 .....60.00 f. 45.1—80 .....70.00 g. 80.1—100 .....80.00 h. over 100 .....90.00 Use equivalent Sq. Ft. of hood overhanging cooking appliances six inches on open sides. 8. Gas Piping - Capacity - .....CU FT/HR a. Up to 1,000 .....$40.00 b. 1,001—100,000 .....100.00 c. Over 100,000 .....150.00 9. Cooking Outlets .....$20.00 10. Fans. ..... a. Up to ½ .....$15.00 b. 1—2 .....20.00 c. 5—20 .....80.00 d. 30—60 .....170.00 e. 75 and over .....200.00 11. Domestic Range Hoods .....$10.00 12. Dryer Vent .....$10.00 (b) In all cases the minimum fee shall be $50.00 per permit. Where additional trips are required to inspect inferior work or installations rejected by the HVAC Division, a reinspection fee of $50.00 will be imposed for each subsequent inspection. Payment of the reinspection fee shall be made to the City of Atlanta before additional inspections are made. (c) A reinspection fee of $50.00 shall be imposed for each reinspection after the initial inspection when a written notice has been issued requiring the correction of inferior work. (d) For combination air conditioning and heating systems, fees shall be cumulative. (e) In the event that any work under this code for which a permit is required is started without a permit first being obtained, the permit fee will be doubled for that permit. However, in no event shall the penalty portion of said fee exceed $1,000.00. In addition, if any work is found to have been performed which is not listed on an existing permit, the cost of adding that work to the permit shall be double the usual fee. However, in no instance shall the penalty portion of that fee exceed $1,000.00.
(Ord. No. 1998-9, § 4, 2-16-98; Ord. No. 2002-11, § 4, 3-5-02; Ord. No. 2002-35, § 4, 5-28-02)