§ 15-07.003 — Preliminary plat data
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code § 15-07.003
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/d302adf4-a952-4616-a6bb-e629f041384d
Sec. 15-07.003. - Preliminary plat data.
Each application for approval of a preliminary subdivision plat and the accompanying construction drawings shall be supported by the following documentation: (a) Eight (8) copies of each preliminary plat shall be submitted and shall be at a scale not smaller than 50 feet to one (1) inch, and sheet size shall not exceed 24 × 36 inches. (b) For any proposed new street installations, the following is required: suggested street names; right-of-way and street widths; central angles of proposed street intersections with existing street intersections; dimensions of radii of any street curvatures based on centerline stationing; dimensions of radii to face of curb and right-of-way for any proposed cul-de-sac; profiles based on proposed centerline stationing, including all vertical curve data and grades; similar data for alleys, if any. (c) All proposed lots, with dimensioned lot lines and areas in square feet and acreage (minimum three-place accuracy), lot numbers, and block numbers. (d) Sites, if any, to be dedicated or reserved for parks, playgrounds, schools or other public uses, together with the purpose and the conditions or limitations of such dedication, if any. (e) Boundary lines from actual field-run survey records and minimum building setback lines (front, side, rear) for all lots. (f) Easements, including their location, width, and purpose. (g) Existing streets on and abutting the tract, including names, right-of-way width, pavement width and location. (h) Provisions for the installation of an overhead street lighting system approved by the bureau of traffic and transportation to be paid for by the developer addressing pole type, pole locations, size, type, and number of lamps. (i) Other conditions on the tract that are visually identifiable, or are a matter of public record, or are known to the applicant, including landfills, watercourses, utility lines and utility structures (sanitary and storm sewer, water, gas, power, telephone, overhead streetlighting and similar utility structures), foundations or buried structures, borrow pits, abandoned wells, burial pits, leach fields, septic tanks, drain fields, soil contaminated areas and similar features. (j) Title under which proposed subdivision is to be recorded, if known, with name, address, and telephone number of owner and designer. (k) A vicinity map at a scale of one (1) inch equals 2,000 feet identifying the proposed site and showing the relationship of the proposed subdivision to the platting pattern of the surrounding area. (l) Scale, data, north arrow, date of survey, date of plat, date of any revisions to plat, land lot number, district number, and county. (m) Present zoning district classification(s). (n) The plat shall contain sufficient horizontal control data to determine readily and reproduce on the ground the proposal being defined with distances, bearings, curve data of the overall parcel boundary and the centerline of any proposed street. All work shall be referenced to the Georgia Plane Coordinate System; if a control monument point is located within 500 feet of the site, the site shall be tied to that monument with traditional ground survey procedures; if greater than 500 feet, Global Positioning Systems (GPS) methodology shall be employed to establish the coordinate relationship. The information furnished shall be dimensionally accurate to the nearest one-hundredth of a foot with bearing accuracy to the nearest 10 seconds. Curve data shall include, but is not limited to, the radius, arc length, chord length, chord bearing, and delta angle. All horizontal control data shown on the plat shall be capable of producing a closure in which the coordinated error does not exceed one (1) foot in 10,000 feet. (o) Actual field-run topographic survey which produces an existing topographical representation of the area within 25 feet of the right-of-way of any proposed street or any proposed earth-disturbing activity in two-vertical-foot contour elevations, with any proposed grading activities also shown with two-foot contour intervals superimposed. Topographic representations shall also include all watercourses, wetlands, and all 100-year floodplains as shown on the applicable maps adopted by the mayor and city council. In addition, plans shall show two-foot contour elevations from city maps for the entire site. (p) A general summary of supporting plans, surveys, documents, and engineering calculations with appropriate professional signatures and seals, as follows: (1) Field-run topographic survey of that portion of the site specified in (o) above. (2) A survey of the site depicting horizontal and vertical control data from actual field-run survey signed and sealed by a registered land surveyor licensed to practice in the State of Georgia as referenced in subsection N. (3) Construction plans, signed and sealed by a registered professional engineer licensed to practice in the State of Georgia, consisting of the following: a. Plans, profiles, and cross sections of proposed streets, cul-de-sacs, sidewalks and similar paved surfaces with all appropriate details. b. Plans, profiles, and details of all proposed sanitary and storm sewers. c. Plans and details of any proposed storm water management facilities. d. Hydraulics of storm sewers, including capacities of intakes, pipe capacities, gutter spreads and velocities of flows, and capabilities of downstream creeks, conduits, and structures receiving storm runoff from proposed subdivision activities. e. Hydrology and hydraulics of stormwater management systems and/or detention facilities including time-stage - storage relationships, backwater surface profiles and related calculations. f. Determination of all 100-year floodplain elevations for watercourses. g. Certification of compliance with all appropriate federal, state, and local wetland identification, protection and regulatory requirements. h. Records of easements, covenants and restrictions on the land, whether existing or proposed, and evidence of current ownership based on the results of current deed research. i. Compliance and construction plan preparation to address required soil and erosion control provisions as required by chapter 138 of this code. (q) Bicycle paths and on-street bicycle lanes that have been designated on the Bicycle Trail Map approved by the governing authority. (r) A tree survey showing the location, species, and diameter breast height (DBH) of all existing mature trees. Mature trees shall be those with a DBH of six inches or more. Because trees in the front, side, and rear yard setbacks must be protected under the city's tree protection ordinance, the tree survey must show the setback requirements for each proposed lot.
(Code 1977, § 15-07.003; Ord. No. 1997-01, § 1, 1-13-97; Ord. No. 2022-39(22-O-1770), § 1, 10-26-22)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.
