§ 15-07.004 — Final plat data
Atlanta City Code (Code of Ordinances, Part II) (Supp. No. 108, Update 1: codified through Ordinance No. 2026-37 (26-O-1511), enacted September 30, 2026) · Atlanta Land Development Code § 15-07.004
Corpus is an independent public-information project, not the official City of Atlanta website. Stable reference: corpuslaw.us/code/f4094e35-c77d-422b-8749-3c6e17b2bc47
Sec. 15-07.004. - Final plat data.
The final plat shall conform to the preliminary plat as approved. The final plat shall be an ink drawing on mylar stock which shall not exceed 17″ by 22″ in size. The plat shall be reproducible and shall produce totally legible copies. The plat shall contain all of the following information: (a) Sufficient horizontal control data to determine readily and reproduce on the ground the actual constructed subdivision, including the overall total parcel and each subdivided lot, and all public rights-of-way limits, being defined with distances, bearings, and curve data. All work shall be referenced to the Georgia Plan Coordinate System. The information furnished shall be dimensionally accurate to the nearest one-hundredth of a foot with bearing accuracy to the nearest 10 seconds. Curve data shall include, but not be limited to, the radius, arc length, chord length, chord bearing and delta angle. All horizontal control data shown on the plat shall be capable of producing a closure in which the coordinated error does not exceed one (1) foot in 10,000 feet. The areas of all subdivided lots shall be shown in square footage and in acreage to three-place minimum accuracy. The documentation of survey accuracy, areas of parcels, and acceptable errors of closure shall be verified with coordinated calculations. In addition, tract boundary corners shall be dimensioned to the nearest developed public street right-of-way and/or land lot line or corner. (b) The graphic representation of all boundary lines, right-of-way limits of all streets, face of curblines of all streets, minimum building setback lines with dimensions for front, side, and rear lines, property lines of all residential lots and other sites, lot identifying numbers, all sanitary and storm sewers, existing or proposed, along with associated structures, and any other existing structures. (c) The name, right-of-way width, and street width from face of curb to face of curb of each street or other right-of-way. (d) The location, dimensions, and purposes of all easements and any areas to be dedicated to public use or sites for other than residential use with notes stating their purposes and limitations. The location of all existing creeks, watercourses, stormwater management facilities, wetland definition and/or protection limits, and any required protective buffer zones or limits with appropriate notations. The location of 100-year storm floodplain contour and its respective elevation. Notation of any covenant which will be part of the final plat. (e) The title, name, location of the subdivision, north arrow, date, scale, land lot number, district number, and county. (f) Lots or sites numbered in numerical order and blocks lettered alphabetically. (g) Accurate location, material, and description of monuments and markers. (h) Acknowledgments. The following acknowledgments and approvals shall appear on the original mylar tracing of the final plat: (1) Surveyor's acknowledgment statement and seal: "It is hereby certified that this plat is true and correct and was prepared from an actual survey of the property made under my supervision. By _____ | Registered Georgia Land Surveyor's Number _____ Date _____ " (2) Certification by signature and date attesting that the applicant is the land owner of record, and dedicates streets, right-of-way, easements, and any sites for the public use by the following acknowledgement: State of Georgia City of Atlanta The owner of the land shown on this plat and whose name is subscribed thereto, and in person or through a duly authorized agent having legal power of attorney, acknowledges that this plat was made from an actual survey and dedicates to the use of the public forever, all streets, parks, drains, easements and public places thereon shown for the purposes and considerations therein expressed. By: _____ Owner | Date: _____ By: _____ Agent | Date: _____ (3) Drainage statement: Storm drainage facilities shown on this plat are necessary for the proper drainage of the subdivision. The City of Atlanta will not be held responsible for erosion or overflow caused by the storm drainage facilities or natural drainage conditions nor responsible for extensions of storm drains. (4) Approval of the commissioner of transportation and, if required, Fulton County or DeKalb County Health Officer, as appropriate. (5) Approval of bureau of planning. (i) Protective covenants. Protective covenants, if any, shall be referenced on the final plat, even though same may be recorded elsewhere. (j) The following supporting documentation is required for those subdivision final plats in which public infrastructure is installed: (1) A final as-built engineering plan and profile drawing(s) of all public sanitary and storm sewers installed with appropriate professional seals and attestments. (2) Results of internal television inspection of all public sanitary sewers installed. (3) A final as-built engineering plan and profile drawing(s) of all public streets and rights-of-way installed with appropriate professional seals and attestments. (4) Compaction test results of public streets and rights-of-way installed. (5) Maintenance bonds or irrevocable letters of credit from a federally insured lending institution acceptable to the chief financial officer for public sewers, streets, sidewalks, and curbs installed. Separate maintenance bonds or irrevocable letters of credit for public sewers and public streets, sidewalks, and curbs shall be provided for the term of three (3) years from the date of filing and recording the final plat and shall represent monetary value equal to the value of the public infrastructure installations. These bonds or letters of credit shall serve as three-year warranties for public infrastructure installations made by private developers prior to perpetual city maintenance. (6) Proposed tree plantings on common property for the entire development, including streets, as shown on the tree replacement plan as required in subsection 158-103(k)(3). (k) Filing and recording of the final plat by the bureau of planning. The filing and recording of the final plat by the bureau of planning shall, upon completion of the improvements by the applicant, be deemed an acceptance of the dedication of the streets and other public land as shown upon said plat on behalf of the public, but shall not impose any duty upon the city covering improvements or maintenance, excepting developed public streets and sewers as described above. (l) The size of acknowledgments and all other text required on the final plat shall be of sufficient size and clarity to ensure legibility in the event the final plat is of such size that would require reduction to a scale acceptable for filing and recording purposes. (m) A tree survey showing the location, species, and diameter breast height (DBH) of all existing mature trees. Mature trees shall be those with a DBH of six inches or more. Because trees in the front, side, and rear yard setbacks must be protected under the city's tree protection ordinance, the tree survey must show the setback requirements for each proposed lot.
(Code 1977, § 15-07.004; Ord. No. 2020-33(20-O-1381), § 3, 6-23-20; Ord. No. 2022-39(22-O-1770), § 1, 10-26-22; Ord. No. 2022-45(22-O-1829), § 2, 12-14-22)
Ask a question about Atlanta law
Corpus searches the Atlanta sections it holds and shows the ones that match, with their citations. Free, no sign-in.
